Presentasi sedang didownload. Silahkan tunggu

Presentasi sedang didownload. Silahkan tunggu

PEMERINTAH PROVINSI NUSA TENGGARA BARAT LAPORAN REALISASI ANGGARAN TAHUN ANGGARAN 2008 NOMOR URUT URAIAN JUMLAH (Rp)BERTAMBAH / (BERKURANG) ANGGARAN SETELAH.

Presentasi serupa


Presentasi berjudul: "PEMERINTAH PROVINSI NUSA TENGGARA BARAT LAPORAN REALISASI ANGGARAN TAHUN ANGGARAN 2008 NOMOR URUT URAIAN JUMLAH (Rp)BERTAMBAH / (BERKURANG) ANGGARAN SETELAH."— Transcript presentasi:

1 PEMERINTAH PROVINSI NUSA TENGGARA BARAT LAPORAN REALISASI ANGGARAN TAHUN ANGGARAN 2008 NOMOR URUT URAIAN JUMLAH (Rp)BERTAMBAH / (BERKURANG) ANGGARAN SETELAH PERUBAHAN REALISASI(Rp)(%) 1PENDAPATAN 1.083.333.680.130,001.049.655.365.972,59 (33.678.314.157,41)96,89 1. 1 PENDAPATAN ASLI DAERAH 387.245.728.925,00413.161.193.104,66 25.915.464.179,66106,69 1. 1. 1 Pendapatan Pajak Daerah 294.298.461.219,00 348.568.544.102,0054.270.082.883,00118,44 1. 1. 2 Pendapatan Retribusi Daerah 41.721.858.619,00 36.680.358.687,00(5.041.499.932,00)87,92 1. 1. 3 Pendapatan Hasil Pengelolaan Kekayaan Daerah Yg Dipisahkan 19.449.000.000,00 100.000.000,00(19.349.000.000,00)0,51 1. 1. 4 Lain-lain Pendapatan Asli Daerah Yang Sah31.776.409.087,0027.812.290.315,66(3.964.118.771,34)87,52 1. 2 PENDAPATAN TRANSFER691.087.951.205,00626.994.172.867,93(64.093.778.337,07)90,73 1. 2. 1 Transfer Pemerintah Pusat - Dana Perimbangan645.488.351.205,00626.994.172.867,93(18.494.178.337,07)97,13 1. 2. 1. 1 Dana Bagi Hasil Pajak60.500.000.000,0059.770.702.736,93(729.297.263,07)98,79 1. 2. 1. 2 Dana Bagi Hasil Bukan Pajak (Sumber Daya Alam)36.486.873.205,0018.721.992.131,00(17.764.881.074,00)51,31 1. 2. 1. 3 Dana Alokasi Umum511.286.478.000,00 0,00100,00 1. 2. 1. 4 Dana Alokasi Khusus37.215.000.000,00 0,00100,00 1. 2. 2 Transfer Pemerintah Pusat - Lainnya45.599.600.000,000,00(45.599.600.000,00)0,00 1. 2. 2. 2 Dana Penyesuaian45.599.600.000,000,00(45.599.600.000,00)0,00 1. 3 LAIN-LAIN PENDAPATAN YANG SAH5.000.000.000,009.500.000.000,004.500.000.000,00190,00 1. 3. 2 Pendapatan Dana Darurat5.000.000.000,009.500.000.000,004.500.000.000,00190,00 2BELANJA1.120.583.541.037,961.039.946.514.619,00(80.637.026.418,96)92,80 2. 1 BELANJA OPERASI815.014.246.591,96747.932.028.858,00(67.082.217.733,96)91,77 2. 1. 1 Belanja Pegawai370.756.087.946,26342.989.566.025,00(27.766.521.921,26)92,51 2. 1. 2 Belanja Barang245.164.205.261,70217.322.980.243,00(27.841.225.018,70)88,64 2. 1. 4 Belanja Subsidi9.594.585.600,008.902.900.000,00(691.685.600,00)92,79 2. 1. 5 Belanja Hibah60.680.400.000,0055.000.485.590,00(5.679.914.410,00)90,64 2. 1. 6 Belanja Bantuan Sosial112.518.967.784,00107.416.097.000,00(5.102.870.784,00)95,46 2. 1. 7 Belanja Bantuan Keuangan16.300.000.000,00 0,00100,00 2. 2 BELANJA MODAL184.844.294.446,00173.739.485.761,00(11.104.808.685,00)93,99 2. 2. 1 Belanja Tanah5.317.654.000,004.917.000.000,00(400.654.000,00)92,47 2. 2. 2 Belanja Peralatan dan Mesin30.381.216.434,0026.919.943.123,00(3.461.273.311,00)88,61 LAMPIRAN I PERDA PERTANGGUNGJAWABAN - LAPORAN REALISASI ANGGARANHalaman 1

2 NOMOR URUT URAIAN JUMLAH (Rp)BERTAMBAH / (BERKURANG) ANGGARAN SETELAH PERUBAHAN REALISASI(Rp)(%) 2. 2. 3 Belanja Bangunan dan Gedung44.134.459.717,0041.775.271.362,00(2.359.188.355,00)94,65 2. 2. 4 Belanja Jalan, Irigasi, dan Jaringan103.553.835.745,0098.741.129.276,00(4.812.706.469,00)95,35 2. 2. 5 Belanja Aset Tetap Lainnya1.457.128.550,001.386.142.000,00(70.986.550,00)95,13 2. 3 BELANJA TAK TERDUGA2.500.000.000,0050.000.000,00(2.450.000.000,00)2,00 2. 3. 1 Belanja Tak Terduga2.500.000.000,0050.000.000,00(2.450.000.000,00)2,00 2. 4 TRANSFER118.225.000.000,00 0,00100,00 2. 4. 1 Transfer Bagi Hasil Ke KAB/KOTA/DESA118.225.000.000,00 0,00100,00 2. 4. 1. 1 Bagi Hasil Pajak118.225.000.000,00 0,00100,00 SURPLUS / (DEFISIT)(37.249.860.907,96)9.708.851.353,5946.958.712.261,55(26,06) 3PEMBIAYAAN 3. 1 PENERIMAAN DAERAH71.169.860.907,9688.134.470.119,7116.964.609.211,75123,84 3. 1. 1 Penggunaan Sisa Lebih Perhitungan Anggaran (SiLPA)71.169.860.907,9671.073.303.719,71(96.557.188,25)99,86 3. 1. 9 Penerimaan dari Hasil Investasi0,0017.061.166.400,00 0,00 3. 1. 9. 1 BUMN/D0,0017.061.166.400,00 0,00 3. 2 PENGELUARAN DAERAH33.920.000.000,0033.914.669.100,00(5.330.900,00)99,98 3. 2. 2 Penyertaan Modal (Investasi) Pemerintah Desa33.920.000.000,0033.914.669.100,00(5.330.900,00)99,98 PEMBIAYAAN NETTO37.249.860.907,9654.219.801.019,7116.969.940.111,75145,56 SISA LEBIH PEMBIAYAAN ANGGARAN (SILPA)0,0063.928.652.373,30 0,00 Mataram, 31 December 2008 GUBERNUR NUSA TENGGARA BARAT ttd. H. M. ZAINUL MAJDI LAMPIRAN I PERDA PERTANGGUNGJAWABAN - LAPORAN REALISASI ANGGARANHALAMAN 2


Download ppt "PEMERINTAH PROVINSI NUSA TENGGARA BARAT LAPORAN REALISASI ANGGARAN TAHUN ANGGARAN 2008 NOMOR URUT URAIAN JUMLAH (Rp)BERTAMBAH / (BERKURANG) ANGGARAN SETELAH."

Presentasi serupa


Iklan oleh Google