13-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin Chapter 13 Breakeven and Payback Analysis © 2012 by McGraw-Hill.

Slides:



Advertisements
Presentasi serupa
PRESENT WORTH ANALYSIS
Advertisements

LABOR MARKET Kuliah 12. THE LABOR MARKET..1  When firms respond to an increase in demand by stepping up production : Higher production requires an increase.
KUSWANTO, SUB POKOK BAHASAN Mata kuliah dan SKS Manfaat Deskripsi Tujuan instruksional umum Pokok bahasan.
Game Theory Purdianta, ST., MT..
Korelasi Linier KUSWANTO Korelasi Keeratan hubungan antara 2 variabel yang saling bebas Walaupun dilambangkan dengan X dan Y namun keduanya diasumsikan.
Model Matematis Keuangan Pertemuan 3 dan 4
BLACK BOX TESTING.
Presented By : Group 2. A solution of an equation in two variables of the form. Ax + By = C and Ax + By + C = 0 A and B are not both zero, is an ordered.
AKUNTANSI BIAYA TUJUAN AKUNTANSI BIAYA
Present Worth Analysis Pertemuan 9 s.d 10
PERTEMUAN 9-10 IMPLEMENTASI ANALISIS EKONOMIS.
Engineering Economic Analysis
Mekanisme Pasar Permintaan dan Penawaran
Compound Amount Factors
 Present Value, Capital Principles of Corporate Finance Brealey and Myers Sixth Edition Slides by Matthew Will Chapter © The McGraw-Hill Companies,
Compound Amount Factors
The Foreign Exchange Market Pertemuan 2
Seni & Ilmu Analisis Ekonomi
Masalah Transportasi II (Transportation Problem II)
1 Pertemuan 22 Analisis Studi Kasus 2 Matakuliah: H0204/ Rekayasa Sistem Komputer Tahun: 2005 Versi: v0 / Revisi 1.
Pertemuan 07 Peluang Beberapa Sebaran Khusus Peubah Acak Kontinu
HAMPIRAN NUMERIK SOLUSI PERSAMAAN NIRLANJAR Pertemuan 3
Simple Regression ©. Null Hypothesis The analysis of business and economic processes makes extensive use of relationships between variables.
1 HAMPIRAN NUMERIK SOLUSI PERSAMAAN LANJAR Pertemuan 5 Matakuliah: K0342 / Metode Numerik I Tahun: 2006 TIK:Mahasiswa dapat meghitung nilai hampiran numerik.
Pasar Faktor Produksi.
13 Akuntansi Biaya Activity Based Costing
MANAGEMENT ACCOUNTING
EKONOMI REKAYASA PERTEMUAN 1 PENDAHULUAN & NPV Oleh : Arwan Apriyono
9.3 Geometric Sequences and Series. Objective To find specified terms and the common ratio in a geometric sequence. To find the partial sum of a geometric.
Chapter 10 – The Design of Feedback Control Systems PID Compensation Networks.
Comparative Statics Slutsky Equation
Keuangan dan Akuntansi Proyek Modul 2: BASIC TOOLS CHRISTIONO UTOMO, Ph.D. Bidang Manajemen Proyek ITS 2011.
BIAYA: Konsep, Klasifikasi dan Perilaku BAB 2. Manufacturing Cost Concepts Financial Accounting Cost is a measure of resources used or given up to achieve.
EKIVALENSI NILAI SEKARANG
PRESENT WORTH ANALYSIS
Contoh Soal PW dan AW Pertemuan 11 dan 12
STATISTIKA CHATPER 4 (Perhitungan Dispersi (Sebaran))
Expected return = (Div1 + P1 – P0)/P0
Rate of Return Analysis Pertemuan 13 s.d 14
STIE Muhammadiyah Jakarta
CAPITAL BUDGETING.
Cartesian coordinates in two dimensions
Menyelesaikan Masalah Program Linear
Cartesian coordinates in two dimensions
Pengujian Hipotesis (I) Pertemuan 11
METODE2 KEPUTUSAN PENGANGGARAN MODAL
Depresiasi Mesin, bangunan, dll. suatu saat akan tidak dipakai lagi/diganti karena : - adanya mesin yang lebih muktahir - perubahan jumlah/jenis mesin.
CAPITAL BUDGETING BY. ELIA ARDYAN.
KEWIRAUSAHAAN MATERI XI MANAJEMEN KEUANGAN.
EKONOMI REKAYASA PERTEMUAN 4 INFLATION & DEFLATION Oleh :
VECTOR VECTOR IN PLANE.
Analisa & Perancangan sistem
Sistem manajemen logistik & produksi isg3e3
Two-and Three-Dimentional Motion (Kinematic)
REAL NUMBERS EKSPONENT NUMBERS.
Capital Budgeting.
Pertemuan 09 Pengujian Hipotesis 2
PRESENT WORTH ANALYSIS
ACCUMULATION PROBLEMS
Cost-Volume-Profit Analysis
Kuis dulu yaaaaa   Seorang investor dapat membeli suatu saham yang nampaknya menjanjikan keuntungan, namun hanya memiliki rate of return 4%, meskipun.
Master data Management
CAPITAL BUDGETING.
Systems Design: Job-Order costing
By Yulius Suprianto Macroeconomics | 02 Maret 2019 Chapter-5: The Standard of Living Over Time and A Cross Countries Source: http//
BAB 9 TEORI PRODUKSI. 2 Introduction Our focus is the supply side. The theory of the firm will address: How a firm makes cost-minimizing production decisions.
Right, indonesia is a wonderful country who rich in power energy not only in term of number but also diversity. Energy needs in indonesia are increasingly.
Pertemuan 6 Mappa Panglima Banding. 2 COST DRIVER: Definition Is a factor that causes, “drives,” an activity’s costs. LO 4.
Capital Budgeting April Penganggaran Modal (Capital Budgeting) Modal (Capital) menunjukkan aktiva tetap yang digunakan untuk produksi Anggaran (budget)
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Basic Cost Management Concepts and Accounting for Mass Customization.
Transcript presentasi:

13-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin Chapter 13 Breakeven and Payback Analysis © 2012 by McGraw-Hill All Rights Reserved

LEARNING OUTCOMES © 2012 by McGraw-Hill All Rights Reserved Breakeven point – one parameter 2.Breakeven point – two alternatives 3.Payback period analysis

Breakeven Point © 2012 by McGraw-Hill All Rights Reserved 13-3 The parameter (or variable) can be an amount of revenue, cost, supply, demand, etc. for one project or between two alternatives  One project - Breakeven point is identified as Q BE. Determined using linear or non-linear math relations for revenue and cost  Between two alternatives - Determine one of the parameters P, A, F, i, or n with others constant Solution is by one of three methods:  Direct solution of relations  Trial and error  Spreadsheet functions or tools (Goal Seek or Solver) Value of a parameter that makes two elements equal

Cost-Revenue Model ― One Project © 2012 by McGraw-Hill All Rights Reserved 13-4 Quantity, Q — An amount of the variable in question, e.g., units/year, hours/month Breakeven value is Q BE Fixed cost, FC — Costs not directly dependent on the variable, e.g., buildings, fixed overhead, insurance, minimum workforce cost Variable cost, VC — Costs that change with parameters such as production level and workforce size. These are labor, material and marketing costs. Variable cost per unit is v Total cost, TC — Sum of fixed and variable costs, TC = FC + VC Revenue, R — Amount is dependent on quantity sold Revenue per unit is r Profit, P — Amount of revenue remaining after costs P = R – TC = R – (FC+VC)

Breakeven for linear R and TC © 2012 by McGraw-Hill All Rights Reserved 13-5 Set R = TC and solve for Q = Q BE R = TC rQ = FC + vQ FC r – v When variable cost, v, is lowered, Q BE decreases (moves to left) Q BE =

Example: One Project Breakeven Point © 2012 by McGraw-Hill All Rights Reserved Solution: Find Q BE and compare to 15,000; calculate Profit Q BE = 75,000 / ( ) = 13,636 units/month Production level is above breakeven Profit Profit = R – (FC + VC) = rQ – (FC + vQ) = (r-v)Q – FC = (8.00 – 2.50)(15,000) – 75,000 = $ 7500/month 13-6 A plant produces 15,000 units/month. Find breakeven level if FC = $75,000 /month, revenue is $8/unit and variable cost is $2.50/unit. Determine expected monthly profit or loss.

Breakeven Between Two Alternatives © 2012 by McGraw-Hill All Rights Reserved 13-7 To determine value of common variable between 2 alternatives, do the following: 1.Define the common variable 2.Develop equivalence PW, AW or FW relations as function of common variable for each alternative 3.Equate the relations; solve for variable. This is breakeven value Selection of alternative is based on anticipated value of common variable: Value BELOW breakeven; select higher variable cost Value ABOVE breakeven; select lower variable cost

Example: Two Alternative Breakeven Analysis © 2012 by McGraw-Hill All Rights Reserved 13-8 Perform a make/buy analysis where the common variable is X, the number of units produced each year. AW relations are: AW make = -18,000(A/P,15%,6) +2,000(A/F,15%,6) – 0.4X AW buy = -1.5X Solution: Equate AW relations, solve for X -1.5X = X X = 4116 per year X, 1000 units per year Breakeven value of X AW buy AW make If anticipated production > 4116, select make alternative (lower variable cost) AW, 1000 $/year

Breakeven Analysis Using Goal Seek Tool © 2012 by McGraw-Hill All Rights Reserved 13-9 Spreadsheet tool Goal Seek finds breakeven value for the common variable between two alternatives Problem: Two machines (1 and 2) have following estimates. a) Use spreadsheet and AW analysis to select one at MARR = 10%. b) Use Goal Seek to find the breakeven first cost. Machine 1 2 P, $ -80, ,000 NCF, $/year 25,000 22,000 S, $ 2,000 3,000 n, years 4 6 Solution: a) Select machine A with AW A = $193

Breakeven Analysis Using Goal Seek Tool © 2012 by McGraw-Hill All Rights Reserved Solution: b) Goal Seek finds a first-cost breakeven of $96,669 to make machine B economically equivalent to A Spreadsheet after Goal Seek is applied Changing cell Target cell

Payback Period Analysis © 2012 by McGraw-Hill All Rights Reserved Caution: Payback period analysis is a good initial screening tool, rather than the primary method to justify a project or select an alternative (Discussed later) Payback period: Estimated amount of time (n p ) for cash inflows to recover an initial investment (P) plus a stated return of return (i%) Types of payback analysis: No-return and discounted payback 1.No-return payback means rate of return is ZERO (i = 0%) 2.Discounted payback considers time value of money (i > 0%)

Payback Period Computation © 2012 by McGraw-Hill All Rights Reserved Formula to determine payback period (n p ) varies with type of analysis. NCF = Net Cash Flow per period t Eqn. 1 Eqn. 2 Eqn. 3 Eqn. 4

Points to Remember About Payback Analysis © 2012 by McGraw-Hill All Rights Reserved No-return payback neglects time value of money, so no return is expected for the investment made No cash flows after the payback period are considered in the analysis. Return may be higher if these cash flows are expected to be positive. Approach of payback analysis is different from PW, AW, ROR and B/C analysis. A different alternative may be selected using payback. Rely on payback as a supplemental tool; use PW or AW at the MARR for a reliable decision Discounted payback (i > 0%) gives a good sense of the risk involved

Example: Payback Analysis © 2012 by McGraw-Hill All Rights Reserved System 1 System 2 First cost, $12,0008,000 NCF, $ per year 3,0001,000 (year 1-5) 3,000 (year 6-14) Maximum life, years 7 14 Problem: Use (a) no-return payback, (b) discounted payback at 15%, and (c) PW analysis at 15% to select a system. Comment on the results. Solution: (a) Use Eqns. 1 and 2 n p1 = 12,000 / 3,000 = 4 years n p2 = -8, (1,000) + 1(3,000) = 6 years Select system 1

Example: Payback Analysis (continued) © 2012 by McGraw-Hill All Rights Reserved System 1 System 2 First cost, $12,0008,000 NCF, $ per year 3,0001,000 (year 1-5) 3,000 (year 6-14) Maximum life, years 7 14 Solution: (b) Use Eqns. 3 and 4 System 1: 0 = -12, ,000(P/A,15%,n p1 ) n p1 = 6.6 years System 2: 0 = -8, ,000(P/A,15%,5) + 3,000(P/A,15%,n p2 - 5)(P/F,15%,5) n p1 = 9.5 years Select system 1 (c) Find PW over LCM of 14 years PW 1 = $663 PW 2 = $2470 Select system 2 Comment: PW method considers cash flows after payback period. Selection changes from system 1 to 2

Summary of Important Points © 2012 by McGraw-Hill All Rights Reserved Breakeven amount is a point of indifference to accept or reject a project One project breakeven: accept if quantity is > Q BE Two alternative breakeven: if level > breakeven, select lower variable cost alternative (smaller slope) Payback estimates time to recover investment. Return can be i = 0% or i > 0% Use payback as supplemental to PW or other analyses, because n p neglects cash flows after payback, and if i = 0%, it neglects time value of money Payback is useful to sense the economic risk in a project