ANGKUTAN PENYEBERANGAN PADA PERIODE LEBARAN TAHUN 2015 (1436 H) KEMENTERIAN PERHUBUNGAN DIREKTORAT JENDERAL PERHUBUNGAN DARAT DIREKTORAT LALU LINTAS DAN ANGKUTAN SUNGAI, DANAU DAN PENYEBERANGAN DATA RENCANA OPERASI ANGKUTAN PENYEBERANGAN PADA PERIODE LEBARAN TAHUN 2015 (1436 H) LINTAS MERAK – BAKAUHENI
PRODUKSI ANGKUTAN LEBARAN A. REALISASI 2014 DAN PREDIKSI PRODUKSI ANGLEB TH. 2015 Tahun Penumpang Kend R2 Kend R4 2011 1.689.006 130.082 189.089 2012 1.722.606 137.573 204.589 2013 1.882.252 148.325 213.475 2014 1.864.262 149.354 224.938 % Kenaikan Rata - Rata 3,43 4,76 5,97 2015 1.928.276 156.457 238.367
B. REALISASI PRODUKSI ANGLEB TH. 2014 TIAP PELABUHAN PELABUHAN MERAK HARI H-7 H-6 H-5 H-4 H-3 H-2 H-1 H HH H+1 H+2 H+3 H+4 H+5 H+6 H+7 Trip 94 92 89 102 101 69 90 96 97 93 85 Pnp 39.612 48.984 73.339 117.339 137.582 110.696 42.271 62.094 42.814 32.976 35.707 42.140 44.186 44.643 44.715 41.743 Roda 2 1.746 2.705 5.567 13.235 18.940 12.564 3.940 4.849 3.882 2.388 2.195 1.697 1.622 1.658 1.109 905 Roda 4 6.370 7.395 9.141 12.495 11.928 11.445 4.506 8.136 4.751 3.808 4.377 5.576 5.967 5.878 6.427 6.652 PELABUHAN BAKAUHENI Hari 84 100 81 103 98 88 82 31.230 31.128 37.219 42.256 41.587 36.215 20.824 27.228 38.341 58.867 82.077 104.713 115.122 110.654 74.444 51.516 584 622 906 984 1.074 1.188 914 1.835 3.326 5.338 7.729 9.819 15.380 12.854 5.080 2.719 4.695 4.769 5.631 6.266 5.817 4.727 2.605 3.643 4.554 6.865 9.745 11.891 11.266 10.962 9.263 7.387 : Posisi Puncak
C. PREDIKSI PUNCAK ANGLEB TH. 2015 PELABUHAN JUMLAH KAPAL KAPASITAS ANGKUT SESUAI IZIN OPERASI SIAP GUNA OPERASI TARGET TRIP TRIP/KAPAL PER HARI PNP R-4 DISP. PNP 30 % MERAK 112 111.216 144.581 17.248 BAKAUHENI Jumlah 57 53 224 993 154 222.432 289.162 34.496 VOLUME ANGKUT REALISASI PUNCAK 2014 PREDIKSI PUNCAK 2015 TRIP/ HARI PNP KEND KEND. R-2 KEND. R-4 R 2 R 4 % PNP/HARI 102 137.582 18.940 12.495 3,43 142.301 4,76 19.842 5,97 13.241 103 115.122 15.380 11.891 119.071 16.112 12.601 205 252.704 34.320 24.386 261.372 35.954 25.842
KESIAPAN SARANA DAN PRASARANA KAPAL KESELURUHAN = 57 UNIT KAPAL TIDAK SIAP OPERASI = 4 UNIT KAPAL SIAP GUNA = 53 UNIT KAPAL PERAWATAN / ENGKER / STANDBY = 8 UNIT KAPAL SIAP OPERASI = 45 UNIT
B. PRASARANA PELABUHAN MERAK PELABUHAN BAKAUHENI DERMAGA : 5 UNIT PLENGSENGAN : 1 UNIT AREA PARKIR: DERMAGA SIAP MUAT : 1.160 UNIT BELAKANG TOLL GATE : 500 UNIT DEPAN TOLL GATE : 500 UNIT KAJIMA : 60 UNIT LAHAN EX PT. KAI : 450 UNIT TOTAL 2.670 UNIT AREA PARKIR: DERMAGA SIAP MUAT : 2.940 UNIT DI LUAR PELABUHAN : 1.585 UNIT TOTAL : 4.525 UNIT R. TUNGGU PENUMPANG : 11.404 ORANG R. TUNGGU PENUMPANG : 11.750 ORANG CCTV : 55 titik CCTV : 52 titik
Terima Kasih ! www.dephub.go.id www.themegallery.com