Situasi Terkini tentang Penelitian dan Pelaksanaan Test danTreat di 28 Oktober 2014 Lecture Series Pusat Penelitian HIV dan AIDS.

Slides:



Advertisements
Presentasi serupa
Pengujian Hipotesis untuk Satu dan Dua Varians Populasi
Advertisements

Aplikasi Komputer dalam MRK batagem.com. Aplikasi Komputer dalam MK2 Komputer dan Konstruksi? Normative cost per unit value Construction Automobiles.
SOCIAL MEDIA Widianto Nugroho, S.Sn. |
Hadi Syahrial (Health IT Security Forum)
Pengantar Promosi kesehatan
HUKUM PERDAGANGAN INTERNASIONAL
PENGUKURAN INTEGRITAS
IT SEBAGAI ALAT UNTUK MENCIPTAKAN KEUNGGULAN KOMPETISI
IT Project Management Based on PMBOK
CORPORATE GOVERNANCE Based on Two Boards System LEAD BY GCG Shareholders through GMoS Corporate governance refers to the structures and processes.
PERAWATAN HIV & AIDS KOMPREHENSIF BERKESINAMBUNGAN
Slide 3-1 Elmasri and Navathe, Fundamentals of Database Systems, Fourth Edition Revised by IB & SAM, Fasilkom UI, 2005 Exercises Apa saja komponen utama.
Prinsip Pembuatan Study Guide
IF-ITB/SAS/25Aug2003 IF7074 – Bagian Pertama Page 1 IF 7047 Kewirausahaan Teknologi Informasi Bagian Pertama: 1.1. Entrepreneurship, entrepreneur, dan.
1 KOMPONEN PERUMUSAN PROGRAM KOMUNIKASI 1.Assesment - Focus the target audience 2.Planning - Target audience - Key of consumer benefit - Believe of the.
KNOWLEDGE MANAGEMENT: philosophy, processes, and pitfalls EXTRACTED FROM Soo, Devinney, Midgley, Deering (2002) CALIFORNIA MANAGEMENT REVIEW, 44 (4) 1seri.
Ekonomi Manajerial dalam Perekonomian Global
Green Productivity Prof. Ir. Moses L. Singgih, MSc, PhD
Menjelaskan sifat – sifat komponen elektronika aktif dan pasif
MDGs & REGIONAL DEVELOPMENT (A Lesson Learned of P3BM Implementation) WAKATOBI REGENCY SOUTHEAST SULAWESI PROVINCE Ir. H U G U A REGENT OF WAKATOBI.
Risk Management.
VALUING COMMON STOCKS Expected return : the percentage yield that an investor forecasts from a specific investment over a set period of time. Sometimes.
Ruang Lingkup Bisnis Dr. Mohammad Abdul Mukhyi. SE., MM
2-Metode Penelitian Dalam Psikologi Klinis
Implementing an REA Model in a Relational Database
Oleh: Dr. Sri Widati,S.Sos.,M.Si
METODE SAMPLING by Achmad Prasetyo, S.Si., M.M..
1 Sumar Hendayana A Lesson learnt. 2 SCHOOL-UNIVERSITY LINKAGE APPROACH (Saito, 2004) Enhancement of Quality in Education UPI Pre-service Feed back on.
Manajemen HepatiTis b kronik
LOGO Manajemen Data Berdasarkan Komputer dengan Sistem Database.
Linked List dan Double Linked List
We are in search of passionate and driven individual to become one of the few Management Associates who will be developed to become bright leaders in the.
Sumber: Weber2009 IMR – URBAN/RURAL Closing the gap.
Amortization & Depresiasi
GROUP 4. MORTALITAS Ketua: Prof. Budi Utomo Anggota:
Metodologi Penelitian dalam Bidang Informatika
Patdono Suwignjo.  UU NO 9 TAHUN 2009 TENTANG BHP DIBATALKAN OLEH MAHKAMAH KONSTITUSI  KEBIJAKAN TENTANG “UN-BUNDLING” TENAGA LISTRIK DIBATALKAN OLEH.
MANPRO-M13: MUTU PROYEK SISTEM
THE IMMERSED TUNNELS MAIN BENEFITS AND INNOVATION BY. WAWAN SETIAWAN.
THE EFFICIENT MARKETS HYPOTHESIS AND CAPITAL ASSET PRICING MODEL
Mengapa Strategi Gagal Diterapkan?
Vitri Widyaningsih. Surveillance Continuous analysis, interpretation and feedback of systematically collected data, generally using methods distinguished.
Web Teknologi I (MKB511C) Minggu 12 Page 1 MINGGU 12 Web Teknologi I (MKB511C) Pokok Bahasan: – Text processing perl-compatible regular expression/PCRE.
PT. GAKA KARYA ENGINEERING
Test dan Treat di Tanah Papua Sebuah Harapan dan Tantangan.
CHARINA AMELIA, Efektivitas Permainan Ular tangga Untuk Meningkatkan Pengetahuan Tentang Bahaya Merokok Pada Siswa Kelas VII dan VIII SMP Maarif.
WaterfallPrototyping RAD Incremental Prototyping Pendekatan SDLC.
Phase III Rapid Prototyping and Demonstration Prototype
INDONESIA INFRASTRUCTURE INITIATIVE IURSP – Monitoring dan Evaluasi IURSP – Monitoring and Evaluation Workshop 3 Steve Brown VicRoads International Projects.
Pertemuan 20 Audit Reporting
Judul Penelitian Oleh:.
Evidence-Based Medicine Prof. Carl Heneghan Director CEBM University of Oxford.
HIV Epidemiologic Situation DKI Jakarta Province
THE INFORMATION ABOUT HEALTH INSURANCE IN AUSTRALIA.
HughesNet was founded in 1971 and it is headquartered in Germantown, Maryland. It is a provider of satellite-based communications services. Hughesnet.
IEEE P Working Group for Wireless Personal Area NetworksTM
Vaginal Cancer (C52): 2014 Cancer Patient Experience Survey, Females, England Female Percentage of 66.7% patients treated for cancer who visited their.
Fix problems opening Norton  Fix problems opening Norton This problem can happen after you update Norton. To fix the matter, restart the computer. Fix.
AND THE PUBLIC INTEREST
Exploring C-Chem with numeric MM and Ab-Initio methods Masood Malekghassemi – Systems Lab Abstract Computational chemistry is no new subject.
EULAR Diffuse Idiopathic Skeletal Hyperostosis (DISH) Study Group
Xiong, et al. A survey of core and support activities of communicable disease surveillance systems at operating-level CDCs in China. BMC Public Health.
DRAFT Granta Data pack January 2019.
Evelyn Neville Barbara Harris, RN, PhD, Research Advisor
Xuan Huo and Ming Li and Zhi-Hua Zhou
ECD SEMINAR: Transforming Society through Early Childhood Development
Pathology analysis of W. chinensis functions in vivo.
Content Marketing Template
NURS 737: Nursing Informatics Concepts and Practice in System Adoption
North Dakota Department of Public Instruction (ND DPI)
Transcript presentasi:

Situasi Terkini tentang Penelitian dan Pelaksanaan Test danTreat di 28 Oktober 2014 Lecture Series Pusat Penelitian HIV dan AIDS

Topik Latar Belakang, tujuan Study design; KAPs of interest, sample, sites, intervention package Project governance structure Progress

Jumlah Infeksi Baru per tahun, per sub-populasi (2012 MATHEMATICAL MODELLING ) 3

Indonesia: Cumulative cross-sectional* HIV Care Cascade *Cumulative data up to Dec 2012 Source: Monthly ART report, MoH

Tingkat Retensi ART selama 12, 24 & 60 bulan di beberapa negara, % 78% 72% Source: WHO-HQ

Test & Treat, Tujuan: ↓ HIV Immediate linkage to care and offer ART

Implementasi Test & Treat: perlu telaah lanjutan Intervensi2 meningkatkan kualitas cascade of care? – Perhatikan konteks lokal – Perhatikan KAP – Berkelanjutan Partisipasi aktif masyarakat sipil terdampak? – Epidemi terkonsentrasi, KAP tidak mudah dijangkau? Inisiasi awal ART, perhatian khusus: – Kepatuhan rendah – resistance

The HATI Project HIV Awal (Early) Testing & Treatment Indonesia Project Implementation of ‘Test and Treat’ strategies for HIV treatment and prevention in key populations in Indonesia: a prospective implementation research study

Study design: key objectives KAPs of interest: MSM, FSW, Waria Primary : To assess the impact of enhanced community based intervention compared with current practice, on: – The number of people from each key population started on ART and retained in treatment at 12 months. – The proportion of people from each key population who are virologically suppressed 12 months after HIV diagnosis. Secondary: – To quantify and compare the HIV treatment cascade/continuum of care. – To assess safety of ART and acceptability of early ART initiation. – To assess behavioural aspects of a T&T strategy, including impact on risk behaviours. Research capacity building objectives – To enhance the capacity of senior local researchers as research leaders. – To increase the research skills and experience of early career researchers.

Study design: Schema YEAR-1: Pre-intervention phase (No intervention at all sites) -ART regardless of CD4 count -Set up data management and monitoring systems -Design and plan interventions YEAR-2: Implement selected interventions at selected sites Or, Selected interventions in a selected KAP at all sites YEAR-3: Full intervention package at all sites and all KAPs Year-4: Follow-up Assess outcomes at the end of 1 year of follow-up of patients recruited in each year

Recruitment and Sample Total sample size across 3 sites in 3 years: 600 HIV positive MSM and 600 HIV positive FSW No specified target for waria All sites may recruit all KAPs

Sites: Bali, Yogya, Bandung Primary and Satellite Sites; the Roles (Bali)

Development of Package Intervention

Project Governance Structure

Progress MoU between WHO and Kirby will be signed by both parties soon Draft MoU between Kirby and 3 universities (UGM, Padjajaran, Udayana) are being finalized Draft detailed protocol is being finalized

TERIMAKASIH