Materi. Introduction In this discussion the appliaction of maintainability to the design process is addressed. The maintainability design process is similar.

Slides:



Advertisements
Presentasi serupa
Peta Kontrol (Untuk Data Variabel)
Advertisements

Pengujian Hipotesis.
Applied Information System Project Management
Chapter 4 The Analysis and Design of Work
Function.
Sistem Perawatan TIP – FTP – UB
RENCANA PENGEMBANGAN PERANGKAT LUNAK (RPPL)
1 Pertemuan 1 Introduction Matakuliah: sistem Operasi Tahun: 2010.
Distribusi Probabilitas Weibull
ARRAY RUBY. PENDAHULUAN Ruby's arrays are untyped and mutable. The elements of an array need not all be of the same class, and they can be changed at.
Korelasi Linier KUSWANTO Korelasi Keeratan hubungan antara 2 variabel yang saling bebas Walaupun dilambangkan dengan X dan Y namun keduanya diasumsikan.
Roesfiansjah Rasjidin Program Studi Teknik Industri Fakultas Teknik – Univ. Esa Unggul.
Varable Control Chart Individual, Cumulative Sum, Moving-Average, Geometric Moving-Average, Trend, Modified, Acceptance.
Materials Requirements Planning
PERTEMUAN 10 Inventory Models Mata kuliah: D Analisa Bisnis Kuantitatif Tahun: 2010.
BLACK BOX TESTING.
Presented By : Group 2. A solution of an equation in two variables of the form. Ax + By = C and Ax + By + C = 0 A and B are not both zero, is an ordered.
1 Pertemuan 02 Ukuran Pemusatan dan Lokasi Matakuliah: I Statistika Tahun: 2008 Versi: Revisi.
Inventory Management. Introduction Basic definitions ? An inventory is an accumulation of a commodity that will be used to satisfy some future demand.
Oleh: SARIPUDIN Jurusan SISTEM INFORMASI
Rekayasa Perangkat Lunak (Software Engineering)
Kuswanto Ukuran Pemusatan Data.
1 Pertemuan 12 Pengkodean & Implementasi Matakuliah: T0234 / Sistem Informasi Geografis Tahun: 2005 Versi: 01/revisi 1.
1 Pertemuan 22 Analisis Studi Kasus 2 Matakuliah: H0204/ Rekayasa Sistem Komputer Tahun: 2005 Versi: v0 / Revisi 1.
Pertemuan 5 Hubungan Komponen terhadap Kehandalan Seri
Pertemuan 07 Peluang Beberapa Sebaran Khusus Peubah Acak Kontinu
Pasar Faktor Produksi.
13 Akuntansi Biaya Activity Based Costing
Gunawan. SISTEM PENILAIAN KKomponen Penilaian : AAbsensi (10 %) TTugas/Quis (10 %) UUjian I (mid semester) (40 %) UUjian II (akhir semester)
Ukuran Pemusatan dan Lokasi Pertemuan 03 Matakuliah: L0104 / Statistika Psikologi Tahun : 2008.
Chapter 10 – The Design of Feedback Control Systems PID Compensation Networks.
Pertemuan 11 Hubungan Kehandalan dengan Pemeliharaan
EIS (Executive Information Systems)
DISTRIBUSI BINOMIAL.
Pert. 16. Menyimak lingkungan IS/IT saat ini
Notasi Object Oriented System
Pengelolaan Manajemen Persediaan
THE GUIDANCE OF PASSING THE TEST
MODUL 7 KEANDALAN, KETERSEDIAAN, KEMAMPUPELIHARAAN (SEBUAH PENGANTAR)
STRUKTUR SISTEM PENGUKURAN KINERJA INDIVIDUAL METRICS METRIC SETS OVERALL PERFORMANCE MEASUREMENT SYSTEM.
Rekayasa Perangkat Lunak
Lecture 7 Thermodynamic Cycles
IMPLEMENTASI FMS.
DISTRIBUSI BINOMIAL.
CA113 Pengantar Manajemen Bisnis
Software Engineering Rekayasa Perangkat Lunak
SISTEM PENYIMPANAN OTOMATIS (AUTOMATED STORAGE SYSTEMS)
Testing power plan unit.
FOKUS MASALAH KULIAH PKP
MANAJEMEN OPERASI AGROINDUSTRI
Matakuliah : L0252 – Computer Aided Learning = Technology Psychology
Sistem manajemen logistik & produksi isg3e3
Pengantar Bisnis 7 Sessi.
SQA Team.
EIS (Executive Information Systems)
DR.IR DIAR FACHMI R CHAIDAR.,MT,CISCP
Lecture 4: ACTIVITY BASED COST SYSTEM
Master data Management
Pertemuan 2 Representasi Digital Sinyal Multimedia
How to Pitch an Event
#8_STOPWATCH TIME STUDY ANALISA DAN PENGUKURAN KERJA
THE INFORMATION ABOUT HEALTH INSURANCE IN AUSTRALIA.
HughesNet was founded in 1971 and it is headquartered in Germantown, Maryland. It is a provider of satellite-based communications services. Hughesnet.
Design for Reliability (12) & Design for Maintainability (13) Group 6 -Sudarmono -Irwan Setyaji -Pitarsono Yulihartanto -Subur Priyono.
BY : LUTFIANI RATNA DEWANTI LILIS SINARSIH Action Research.
Kelompok 13 Nama Anggota : Sigit Dwi Prianto Praditya F Marliyana.
ZEFRY DARMAWAN JURUSAN TEKNIK INDUSTRI UNIVERSITAS BRAWIJAYA
Keandalan dan Penentuan Interval Waktu Perawatan
Work System Design “Work Measurement” Hardianto Iridiastadi, Ph.D.
Transcript presentasi:

Materi

Introduction In this discussion the appliaction of maintainability to the design process is addressed. The maintainability design process is similar to that of reliability design. The overall maintainability goal must then be allocated to the repairable subassemblies and components.

Introduction The Maintainability Design Process

Measurements and Specifications

If mean preventive maintenance time (MPMT) is to be included in the work hour calculation, then Where CREWpm is the average crew size for preventive maintenance

Measurements and Specifications Example Sebuah sistem mempunyai distribusi waktu perbaikan berdistribusi lognormal, dengan waktu median perbaikan 3,5 jam dan shape parameter s =0.18. Jika 95% perbaikan dapat diselesaikan dalam waktu 5 jam dan jumlah jam pemeliharaan harus kurang dari 3 jam setiap 100 jam operasi. Untuk memastikan jaminan pemeliharaan, maka 2 jam preventive maintenance harus dilakukan setiap 200 jam operasi. Jumlah crew pemeliharaan harus dilakukan oleh 2 orang dengan alasan keselamatan. Distribusi kegagalan berbentuk exponensial dengan MTBF 1000 jam oeprasi. Apakah persyaratan pemeliharaan terpenuhi ?

Maintenance Concepts and Procedures For a complex system consisting of subassemblies, components, and parts, it is neccessarty to determine the following: Which unit are to be repaired rather than discarded and replaced The preventive maintenance schedule and associated tasks. For each repairable units, the level of repair (such as local, service center, or factory ) for each failure mode. For each repair task, the required skill levels, tools, test equipment, and technical manuals. The number of repair channels and spare parts (inventory)

Cost Model

Example: Sebuah mesin dibeli dengan harga $3100. Biaya tetap kerusakan sebesar $75, dan biaya variabel kerusakan berdasarkan tenaga crew dengan biaya $50 per jam. Perusahaan pembuat mesin (manufacturer) tersebut menjamin, bahwa kebutuhan perawatan dari semua jenis kegagalan pada 1000 jam kerja pertama. Berdasarkan desain saat ini dan pengujian yang dilakukan menunjukan MTBF sebesar 40 jam kerja, dan MTTR 6 jam. Dalam upaya mengurang biaya jaminan tersebut, manufcturer dapatt meningkatkan MTBF sebesar 20% atau meningkatkan MTTR sebesat 20%. Mana pilihan yang terbaik, dengan asumsi dari kedua pilihan tersebut meningkatkan biaya sebesar $1000.

Component Reliability and Maintainability

Example Sebuah mesin foto copy mempunyaia beberapa komponen penyusun sebagai berikut: Control Unit Input Tray System Camera Unit Feeder System Power Unit Quantity (qi) Persyaratan spesifikasi rata-rata waktu perbaikan sebesar 4 jam. Tentukan alokasi MTTR yang cocok untuk setiap komponen. Asumsikan waktu operasi semua komponen sama, serta memiliki constant failure rate.

Design Methods Fault Isolation and Sel-Diagnostics Diagnostics can take several forms such as Manual, Automatic, and Self Diagnostic Parts Standarization and Interchangeability Modularization and Accessibility Repair versus Replacement Proactive Maintenance Two type of proactive maintenance are preventive maintenance and predictive maintenance.

Human Factor and Ergonomics Huma factor or ergonomics is concerned with the interaction of humans with the physicl objects they encounter in performing their activities. In maintenance system design, we are concerned with the ergonomics subtopics of antropometry, biomechanics, physiocology, psychophysics, human perception and human performance. The physical design of the equipment must provide for personel access to all failed components.

THANK YOU For your attention