Upload presentasi
Presentasi sedang didownload. Silahkan tunggu
1
PLTU KETAPANG (ex TIMIKA)
SISTEM KHATULISTIWA Oktober 2017 KUCHING SAMBAS PLTU IPP 1 2 X 100 MW (2019) MAMBONG 59 km SEMPARUK 2019 PLTU KALBAR 2 2 X 27,5 MW (2018/2019) PLTU KALBAR 3 2 X 50 MW (2018) 81 km SINGKAWANG PUTUSIBAU 2023 73 km ENTIKONG 2021 BENGKAYANG PLTU KALBAR 3 PLTBm MEMPAWAH 10 MW (2018) 89 km 95 km 130 km NGABANG 200 km SENGGIRING 42 km SANGGAU 2018 55 km PLTU KALBAR 1 2 X 50 MW (2017/18) PARIT BARU 16 km SINTANG 2018 SIANTAN 80 km Data Sistem : Daya Mampu Pasok : MW Beban Puncak : MW Hari, Tanggal : Jumat, 22 Sep 2017 Data Asset : Gardu Induk : 10 GI & 1 GITET Sirkit Transmisi 150 kV : 15 Sirkit Transmisi 150 kV : kms Tower 150 kV : 1232 Tower Sirkit Transmisi 275 kV : 2 Sirkit Transmisi 275 kV : kms Tower 275 kV : 201 Tower Trafo : 19 Buah MVA Trafo : 735 MVA Trafo IBT : 2 IBT MVA IBT : 500 MVA Reaktor : 1 Buah Mvar Reaktor : 50 MVar Bay Transmisi 150 kV : 30 Bay Bay Transmisi 275 kV : 2 Bay Bay Trafo : 19 Bay Bay IBT : 4 Bay Bay Kopler : 7 Bay Bay Reaktor : 1 Bay Kubikel 20 kV : 146 Buah Sebaran Konsumsi Energi : Pontianak (74%) Singkawang (26%) 24 km 92 km 90 km 50 km 18 km TAYAN 2017 PLTG PEAKER 100 MW (2019) SEI RAYA SEKADAU 2018 KOTA BARU CEMARA 2018 60 km 30 km NANGAPINOH 2022 RASAU 2021 PLTU IPP 2 2 X 100 MW (2021) PLTU IPP 3 2 X 100 MW (2022) 90 km 150 km K0TA BARU2 2022 90 km KE GI RANTAUPUHUT KALSELTENG SUKADANA 2018 SANDAI 2020 PLTU IPP KETAPANG 2X6 MW (2016/17) PLTU KETAPANG (ex TIMIKA) 2x7 MW (2020) 100 km KETAPANG 2017 KETERANGAN : Gardu Induk 275 kV Pembangkit Rencana 96 km Transmisi 275 kV Eksisting Transmisi 150 kV Eksisting KENDAWANGAN 2018 Transmisi 150 kV Rencana AIR UPAS 2023 Gardu Induk 150 kV Eksisting KE GI SUKAMARA KALSELTENG Gardu Induk 150 kV Rencana 95 km
Presentasi serupa
© 2024 SlidePlayer.info Inc.
All rights reserved.