Presentasi sedang didownload. Silahkan tunggu

Presentasi sedang didownload. Silahkan tunggu

File: urd-bis.ppt Sigit A SantaHalaman 1 LAPORAN KEMAJUAN KAJIAN TURBINE GENERATOR SYSTEM PLTN PWR.

Presentasi serupa


Presentasi berjudul: "File: urd-bis.ppt Sigit A SantaHalaman 1 LAPORAN KEMAJUAN KAJIAN TURBINE GENERATOR SYSTEM PLTN PWR."— Transcript presentasi:

1 File: urd-bis.ppt Sigit A SantaHalaman 1 LAPORAN KEMAJUAN KAJIAN TURBINE GENERATOR SYSTEM PLTN PWR

2 File: urd-bis.ppt Sigit A SantaHalaman 2 EPRI US UTILITYOTHERS UTILITY URD VOL I ALWR Policy and Summary Of Top Tier Requirement URD VOL. II Design Requirement For Evolusionary ALWR URD VOL. III Design Requirement For Passive ALWR DEPT OF ENERGY Utility Requirement Document

3 File: urd-bis.ppt Sigit A SantaHalaman 3 ChapterTitle 1.Overall Requirements 2.Power Generation Systems 3.Reactor Coolant System & Reactor Non-Safety Aux. Sys. 4.Reactor Systems 5.Engineered Safety Systems 6.Building Design and Arrangement 7.Fueling and Refueling 8.Plant Cooling Water Systems 9.Site Support Systems 10.Man-Machine Interface 11.Electric Power System 12.Radioactive Waste Processing Systems 13.Turbine Generator Systems URD Volume II

4 File: urd-bis.ppt Sigit A SantaHalaman 4 MHI PWR Schematic Diagram

5 File: urd-bis.ppt Sigit A SantaHalaman 5 3. Technical Specifikation fo the Turbine Generator System (TST) ItemsBobot % Target 3.1.Introduction(6) 6% 3.2.Steam and Feed Water Lines(7) 13% 3.3.Turbine and Auxiliary System(22) 35% Juli 3.4.Generator and Auxiliary System(25) 60% Agust 3.5.Condensing System(15) 75% Sept 3.6.Condensate/Feedwater Heating System(12) 87% Sept 3.7.Main Cooling Water System(4) 91% Okt 3.8.Conventional Service Water & (6) 97% Okt Componen Cooling Water System 3.9.Water Treatment(3) 100%Nov Total100% Tech. Spec. TG System


Download ppt "File: urd-bis.ppt Sigit A SantaHalaman 1 LAPORAN KEMAJUAN KAJIAN TURBINE GENERATOR SYSTEM PLTN PWR."

Presentasi serupa


Iklan oleh Google