SITE SELECTION PLTU RAHA 2 x 3 MW

Presentasi serupa


Presentasi berjudul: "SITE SELECTION PLTU RAHA 2 x 3 MW"— Transcript presentasi:

1 SITE SELECTION PLTU RAHA 2 x 3 MW

2 PULAU MUNA

3 3 LOKASI REKOMENDASI & 1 LOKASI ALTERNATIVE
PLTU RAHA 2 x 3 MW Jarak tempuh ke pusat beban : Lokasi 1 Sinabang - Kuta Batu = 15 km Lokasi 2 Sinabang - Kuala Bakti = 53 km Lokasi 3 Sinabang - Ganting = 14 km

4 Lokasi Site Selection PLTU RAHA 2 x 3 MW
LOKASI A Titik koordinat S 04°40.289‘ E 122°43.295' Wilayah Administratif Desa Tampo, Kec. Napabalano, Kab. Muna, Propinsi Sulawesi Tenggara LOKASI B Titik koordinat S 04°45.895‘ E 122°26.071' Wilayah Administratif Desa Lasama Kec. Tikep, Kab. Muna, Propinsi Sulawesi Tenggara Lokasi D (Alternative) Titik koordinat S 04°52.577‘ E 122°44.263' Wilayah Administratif Desa Lasunapa, Kec. Duruka, Kab. Muna, Propinsi Sulawesi Tenggara LOKASI C Titik koordinat S 04°44.559' E 122°22.464'’ Wilayah Administratif Desa Tondasi, KecTikep, Kab. Muna, Propinsi Sulawesi Tenggara

5 Hasil Site Selection

6 Foto Lokasi A (Napabalano)

7 Foto Lokasi B (Lasama)

8 Foto Lokasi C (Tondasi)

9 Foto Alternatif Lokasi D (Lasunapa)

10 SINGLE LINE DIAGRAM SUB SISTEM RAHA
GH WATULEA LBS LAKAPERA KETERANGAN LBS WALENGKABOLA PLTD = PMT POSISI MASUK BAU-BAU PLNtombula = PMT POSISI TERBUKA LBS TOMBULA = LBS POSISI MASUK LBS KOLASA FCO WAARA = LBS POSISI TERBUKA p. TAMPO p. KOTA p. WAARA p. LAWA LBS LAIBA PLN laimpi = FCO POSISI MASUK LBS STADION LBS PASAR LAIMPI = FCO POSISI TERBUKA LBS PUSKESMAS” = FCO WAWESA PEMBANGKIT LBS KODIM LBS JOMPI LBS LUPIA LBS PAELANGKUTA LBS BUTUNG” = TRAFO DAYA FCO MOTEWE PLN LAWA LBS WANTOROMATA LBS WARANGGA = FCO BANGUNSARI KWH EKSIMP LBS MABODO FCO FCO BONEA LBS WATUPUTI LBS KONTUNAGA PT. PLN (PERSERO) CAB. BAU-BAU RANTING RAHA PLN PLTD RAHA 6,8 MW GH. LAWA RANTING RAHA LBS DANA LBS MATAKIDI DIRENCANA : DIGAMBAR : PLN KONAWE LBS KEDAUN LBS WUNA DIPERUKSA : PLN TIKEP DISETUJUI : LBS KONAWE SINGLE LINE 20 KV PLN NAPABALONO SUB. SISTEM RAHA LBS MAROBEA LBS TIKEP NO. GBR/CPL : NO. LBR- OPDIS :

11 TABEL PERKEMBANGAN KWh DIBANGKIT SENTRAL PLTD RAHA
BULAN TAHUN 2005 2006 2007 2008 2009 KWh DIBANGKIT (Kw) JANUARI 1,705,620 1,639,796 1,930,626 2,100,599 2,256,530 FEBRUARI 1,575,956 1,530,696 1,696,245 1,978,993 2,054,333 MARET 1,688,292 1,607,270 1,745,451 2,083,504 2,272,088 APRIL 1,682,423 1,521,004 1,785,186 2,044,732 2,285,524 MEI 1,785,539 1,501,496 1,919,550 2,093,617 2,406,112 JUNI 1,690,489 1,717,419 1,837,393 1,994,067 2,347,895 JULI 1,721,586 1,783,676 1,930,455 2,038,407 2,373,892 AGUSTUS 1,678,826 1,824,874 1,917,731 2,049,091 2,487,458 SEPTEMBER 1,474,950 1,807,842 1,970,732 2,129,659 2,512,801 OKTOBER 1,780,387 1,952,638 2,146,025 2,249,200 2,538,383 NOPEMBER 1,614,108 1,728,788 2,003,238 2,136,252 2,517,024 DESEMBER 1,615,421 1,883,236 2,101,041 2,251,614 2,530,554 TOTAL 20,013,597 20,498,735 22,983,673 25,149,735 28,582,594

12

13 TABEL PERKEMBANGAN BEBAN PUNCAK SISTIM RAHA
BULAN TAHUN 2005 2006 2007 2008 2009 BEBAN (Kw) JANUARI 4,495 3,855 4,440 5,130 5,419 FEBRUARI 4,520 3,900 4,475 5,367 MARET 4,535 3,930 4,015 5,160 5,433 APRIL 4,595 3,465 5,725 5,205 5,411 MEI 4,600 3,715 5,525 5,050 5,498 JUNI 4,480 4,425 4,785 5,030 5,603 JULI 4,455 4,460 4,950 4,915 5,528 AGUSTUS 4,415 4,485 4,810 4,875 5,670 SEPTEMBER 3,675 4,490 4,930 5,140 5,750 OKTOBER 3,785 4,380 5,440 5,908 NOPEMBER 4,060 4,140 5,195 5,351 6,031 DESEMBER 3,725 4,355 5,110 5,092 BEBAN TERTINGGI

14