Company Profile
2
PT. SRI PUTRA JAYA ABADI ENGINEERING & GENERAL CONTRACTOR JL
PT. SRI PUTRA JAYA ABADI ENGINEERING & GENERAL CONTRACTOR JL. Kintamani Blok H No.24 Balikpapan regency Telp : , Fax Balikpapan, Kalimantan Timur Workshop : Jl. RE.Martadinata No Pasuruan Telp : , Fax : :
3
PT. SRI PUTRA JAYA ABADI Adalah salah satu Contractor yang bergerak dalam usaha jasa yang berpengalaman mengerjakan Project Construction & Enginering Pada Pertambangan, Cement Plant, Oil And Gas, Power Plant. PT. Sri Putra Jaya Abadi memiliki kantor pusat di kota Balikpapan, Kalimantan Timur PT. Sri Putra Jaya Abadi telah banyak menangani pekerjaan Construction project, antara lain; Pipe Line, Ducting, Storage Tank, Gallery Conveyor, Blasting and Painting, Mechanical For Cement Plant, and all Conveyor Instrument, etc.
4
Upgrade Kupang Cement & Modification Project
Fabrication Tank Storage
5
ST CONVEYOR HALLIBURTON PROJECT
Fabrication Belt Conveyor
6
Upgrade Kupang Cement & Modification
Installation Limestone bin 300 m3
7
Upgrade Kupang Cement & Modification
Assembly to Install Cone bin Modification Chute Coal Silo
8
Upgrade Kupang Cement & Modification
Fabrication Cone Bin Fabrication Cone Bin 300 m3
9
Up Grade Kupang Cement & Modification
Fabrication & Installation Steel Structure Of Bin 300 m3
10
Kupang Cement Up Grade & Modification
Fabrication Silica Sand Bin 30 m3
11
PIPELINE AND FUEL GANTRY LOADING
GANTRY LOADING FUEL PIPE LINE FOR FUEL DIESEL
12
Kupang Cement Up Grade & Modification
Installation Silo & Steel Structure Cap. 100 M3
13
Kupang Cement Up Grade & Modification
Install Weight Feeder (Import Part) Install Weight Feeder Install Weight Feeder
14
Tank Storage Work Fabrication & Installation Shell Tank Cap 5000 M3
15
Fabrication & Installation Storage Tank Cap 2000M3
Tank Storage Work Fabrication & Installation Storage Tank Cap 2000M3
16
STORAGE TANK 4X5000KL (MA.KEMBANG) KALIMANTAN TIMUR
17
Replacement Kiln Indocement Tarjun
Joint Shell Kiln
18
Replacement Kiln Indocement Tarjun
Cutting Old Kiln Replacement work
19
Transfer Conveyor Project
Installation Belt Conveyor BW 1000
20
Up Grade PT. Semen Bosowa Maros
Installation New Ducting Water Spray System Works
21
Up Grade PT. Semen Bosowa Maros
Installation New Ducting Installation Cooling Duct Fix Inlet Grate
22
PT. SRI PUTRA JAYA ABADI Beberapa project kami diberbagai tempat, semua telah kami selesaikan dengan sangat baik sesuai dengan prosedur dan kontrak kerja, serta kwalitas mutu yang terbaik. Memprioritaskan & penerapkan Keselamatan & Kesehatan Kerja dan juga menjunjung tinggi kedisiplinan Mengutamakan Ketepatan waktu dalam penyelesaian pekerjaan dengan tidak mengurangi kwalitas daripada hasil pekerjaan
23
THANK YOU