TUGAS RISET OPERASI SISTEM ANTRIAN
kelompok 5: Ulfalina Hapsari ( ) Ika wati ( ) Arista Febry ( ) Deva Rizky yuniana ( ) Nur Mahmudah ( )
2
Each airline passenger and his or luggage must be checked to determine whether he or she is carrying weapons onto the airplane. Suppose that at Gotham city, an average of 10 passengers per minute arrive (interarrival times are exponential). To check passengers for weapons. The airport must have a checkpoint consisting of metal detector and baggage X-ray machine. Whenever a checkpoint is ini operation. Two employees are required. A checkpoint can check an average of 12 passengers per minute (time ti check a passenger is exponential). Under the assumption that the airport has only one checkpoint. Answer the following questions:
3
what is the probability that a passenger will have to wait before being checked for weapons?
On the average how many passengers are waiting in line to enter the checkpoint? On the average, how long will a passenger spend at the checkpoint?
4
jawab Diketahui Gotham City Airport mempunyai checkpoint yang terdiri dari sebuah detektor metal dan mesin sinar X untuk bagasi. Asumsi bahwa bandara ini hanya memiliki 1 checkpoint dan setiap pengoperasian / pelayanan pada checkpoint terdapat 2 petugas. M/M/1 ( laju kedatangan) = 10 orang / menit , sebaran waktu kedatangan adalah eksponensial (laju pelayanan ) = 12 orang / menit, sebaran waktu pelayanan adalah eksponensial <
5
a. Jadi peluang bahwa seorang penumpang harus menuggu sebelum menuju checkpoint adalah 5/6 atau 0.833 b. Rata-rata banyaknya penumpang pesawat yang menunggu pada antrian sebelum masuk ke check point adalah 4 orang c.
6
Rata-rata waktu seorang penumpang menghabiskan waktu di checkpoint adalah 1/12 menit atau 5 detik
7
Allah Hafiz ( SAMPAI JUMPA )