Presentasi sedang didownload. Silahkan tunggu

Presentasi sedang didownload. Silahkan tunggu

VIII. SUMBERDAYA MANUSIA DALAM MANAJEMEN OPERASI

Presentasi serupa


Presentasi berjudul: "VIII. SUMBERDAYA MANUSIA DALAM MANAJEMEN OPERASI"— Transcript presentasi:

1 VIII. SUMBERDAYA MANUSIA DALAM MANAJEMEN OPERASI
A. PERKEMBANGAN MANAJEMEN SUMBERDAYA MANUSIA MANAJEMEN ILMIAH PENDEKATAN PERILAKU Perluasan pekerjaan secara horizontal Perluasan pekerjaan secara vertikal Rotasi Pekerjaan

2 KECENDERUNGAN KONTEMPORER
Fleksibilitas pekerjaan Pertanggungjawaban dan pemberdayaan Peningkatan keahlian dan kemampuan Pelibatan pekerja Kompensasi pekerja Teknologi dan otomatisasi Pekerja-pekerja temporer Kepuasan kerja

3 B. ELEMEN-ELEMEN DISAIN PEKERJAAN
ANALISIS TUGAS (TASK ANALYSIS) ANALISIS PEKERJA (WORKER ANALYSIS) ANALISIS LINGKUNGAN PEKERJAAN C. ANALISIS PEKERJAAN PROCESS FLOWCHART WORKER-MACHINE CHART

4 ANALISIS TUGAS (TASK ANALYSIS)
Description of task to be performed Task sequence Function of tasks Frequency of tasks Criticality of tasks Relationship with order jobs/tasks Performance requirement Information requirement Control requirement Error possibilities Task durations Equipment requirement

5 ANALISIS PEKERJA (WORKER ANALYSIS)
capability requirement Performance requirement Evaluation Skill level Job training Physical requirement Mental stress Boredom Motivation Number of workers Level of responsibility Monitoring level Quality responsibility Empowerment level

6 ANALISIS LINGKUNGAN PEKERJAAN
( Environmental Analysis ) Workplace location Process location Temperature humidity Lighting Ventilation safety Logistics Space requirement Noise Vibration

7 Simbol-simbol Flow-Chart
PROCESS FLOWCHART Simbol-simbol Flow-Chart

8 Contoh : Process Flowchart

9 Contoh : Process Flowchart

10 Contoh : Process Flowchart

11 WORKER-MACHINE CHART

12 D. PENGUKURAN PEKERJAAN
STOPWACH TIME STUDI NUMBER OF CYCLE ELEMENTAL TIME FILES PREDETERMINED MOTION TIME WORK SAMPLING LEARNING CURVE

13 ELEMENTAL TIME FILES Elemental standard time files are predetermine job element time PREDETERMINED MOTION TIME Predetermined Motion Time are predetermined times for basic micromotions

14 Langkah-langkah Stopwatch Time Study
STOPWACH TIME STUDY Langkah-langkah Stopwatch Time Study Establish the standard job method Break down the job into element Study the job Rate the workers performance Compute the average time Compute the normal time Normal time = (elemental average time)(Rating Factor) Nt = (t)(RF) Normal Cycle Time = Summing the elemental mormal times Compute the standard time Standard time = (Normal Cycle Time)(1+Allowance Factor) ST = (NT) (1+AF)

15 NUMBER OF CYCLE

16 WORK SAMPLING Langkah-langkah Work Sampling Define the job activities Determine the number of observations in the work sample Determine the length of sampling period Conduct the work sampling study and record the observations Periodically recompute the number of observations

17 LEARNING CURVE Processing time per unit Unit produced


Download ppt "VIII. SUMBERDAYA MANUSIA DALAM MANAJEMEN OPERASI"

Presentasi serupa


Iklan oleh Google