Chapter 3: The WebE Process

Slides:



Advertisements
Presentasi serupa
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
Advertisements

Applied Information System Project Management
KONSEP BUSINESS PLAN Dr. Yulizar Kasih, S.E., M.Si.
Managing Software Requirements (manajemen kebutuhan perangkat lunak)
RENCANA PENGEMBANGAN PERANGKAT LUNAK (RPPL)
Manajemen Proyek.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 7/e (McGraw-Hill, 2009) Slides copyright 2009 by Roger Pressman.1.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 1 Slide 1 Review Software Engineering.
Perancangan Database Pertemuan 07 s.d 08
Oleh : Eko Prianto. Read Carefully  another section at the same document  to a different document  to a different Web page  to a variety of other.
WaterfallPrototyping RAD Incremental Prototyping Pendekatan SDLC.
Zulharman. Tujuan Belajar 1. Mahasiswa mampu memahami berbagai metode membuat catatan kuliah (note taking) 2. Mahasiswa mampu memahami metode membaca.
Pendahuluan Perkuliahan Manajemen Konstruksi
Rekayasa Perangkat Lunak (Software Engineering)
Menulis Kolom  Kolom adalah opini atau artikel. Tidak seperti editorial, kolom memiliki byline.  Kolom Biasanya ditulis reguler. Biasanya mingguan atau.
1 Pertemuan 09 Kebutuhan Sistem Matakuliah: T0234 / Sistem Informasi Geografis Tahun: 2005 Versi: 01/revisi 1.
INDONESIA INFRASTRUCTURE INITIATIVE IURSP – Monitoring dan Evaluasi IURSP – Monitoring and Evaluation Workshop 3 Steve Brown VicRoads International Projects.
1 Pertemuan 2 Unit 1 - Careers Matakuliah: G0682 / Bahasa Inggris Ekonomi 1 Tahun: 2005 Versi: versi/revisi.
Perencanaan Pengujian (Test Plan) Pertemuan 4
9.3 Geometric Sequences and Series. Objective To find specified terms and the common ratio in a geometric sequence. To find the partial sum of a geometric.
Copyright © 2011 Pearson Education, Inc. Publishing as Pearson Addison-Wesley Chapter 9 Relational Database Design by ER- to-Relational Mapping.
Chapter 4: Communication
EIS (Executive Information Systems)
Software Engineering Process
Review Rekayasa Perangkat Lunak
proses PERANGKAT LUNAK
Functional Requirements vs Non Functional Requirements
Pert. 16. Menyimak lingkungan IS/IT saat ini
Apakah “Praktek”? Praktek adalah sejumlah konsep, prinsip, metode dan tools that yang harus dimiliki ketika software direncanakan dan dikembangkan. Dia.
Notasi Object Oriented System
The WebE Process These slides are designed to accompany Web Engineering: A Practitioner’s Approach (The McGraw-Hill Companies, Inc.) by Roger Pressman.
Membangun Web Site“Cantik”
Predicting Reputation Risks
Chapter 2: Rekayasa Web We define it this way:
Rekayasa Perangkat Lunak
MANPRO-M13: MUTU PROYEK SISTEM
CA113 Pengantar Manajemen Bisnis
R.S. Pressman & Associates, Inc
Software Engineering Rekayasa Perangkat Lunak
ADVERTORIAL Pertemuan 15 & 16
Pertemuan 10 Kombinasi Data Label Kemasan dan Kemasan
Pengantar Bisnis 7 Sessi.
Materi Rekayasa Perangkat Lunak
Review Rekayasa Perangkat Lunak
CA113 Pengantar Manajemen Bisnis
EIS (Executive Information Systems)
1st Knowledge Area : Project Integration Management
REKAYASA PERANGKAT LUNAK (IF 1483)
Manajemen Proyek Perangkat Lunak (MPPL)
Dasar-Dasar Sistem Informasi
Rekayasa Perangkat Lunak Part-5
Review Rekayasa Perangkat Lunak
Review Rekayasa Perangkat Lunak
Hanya digunakan di lingkungan Universtias
Announcements and Advertisements. Advertisements Advertisement is promotion of goods, services, companies, and ideas that must be paid by a sponsor. Advertising.
Welcome 8clicks Pte Ltd. About us  8CLICKS PTE LTD is best web Development Company in Singapore. It is famous for their web designing services. 8CLICKS.
How to Set Up AT&T on MS Outlook ATT is a multinational company headquartered in Texas. ATT services are used by many people widely across.
How to Pitch an Event
Workflow Project Management Software. This is the first in a series of articles discussing how web-based project management solutions have revolutionized.
Suhandi Wiratama. Before I begin this presentation, I want to thank Mr. Abe first. He taught me many things about CorelDRAW. He also guided me when I.
CA113 Pengantar Manajemen Bisnis
Angular js training institute in indore
Pertemuan #2: Process Models
HughesNet was founded in 1971 and it is headquartered in Germantown, Maryland. It is a provider of satellite-based communications services. Hughesnet.
Do you want to check your Zoho mail incoming or outgoing logs and unable to check, go through with this article and access Zoho mail incoming or outgoing.
 Zoho Mail offers easy options to migrate data from G Suite or Gmail accounts. All s, contacts, and calendar or other important data can be imported.
If you are an user, then you know how spam affects your account. In this article, we tell you how you can control spam’s in your ZOHO.
Rank Your Ideas The next step is to rank and compare your three high- potential ideas. Rank each one on the three qualities of feasibility, persuasion,
2. Discussion TASK 1. WORK IN PAIRS Ask your partner. Then, in turn your friend asks you A. what kinds of product are there? B. why do people want to.
Transcript presentasi:

Chapter 3: The WebE Process The process must be agile and adaptable, but it must also be incremental Why incremental? Selalu dilakukan pengembangan Sering terjadi pengembangan Time lines yang singkat Incremental delivery allows you to manage this change! These slides are designed to accompany Web Engineering: A Practitioner’s Approach (The McGraw-Hill Companies, Inc.) by Roger Pressman and David Lowe, copyright 2009

Incremental Delivery Repeat the development cycle for each increment! These slides are designed to accompany Web Engineering: A Practitioner’s Approach (The McGraw-Hill Companies, Inc.) by Roger Pressman and David Lowe, copyright 2009

WebE Process Activities & Actions These slides are designed to accompany Web Engineering: A Practitioner’s Approach (The McGraw-Hill Companies, Inc.) by Roger Pressman and David Lowe, copyright 2009

Conducting Framework Activities-I The first iteration mendefinisikan konteks bisnis menetapkan persyaratan keseluruhan membuat satu set skenario penggunaan bernegosiasi bertentangan kebutuhan antara para pemangku kepentingan, and from this information derive the set of WebApp increments that is to be delivered. Mengembangkan garis besar dari semua komponen, disampaikan bahwa itu akan berubah. These slides are designed to accompany Web Engineering: A Practitioner’s Approach (The McGraw-Hill Companies, Inc.) by Roger Pressman and David Lowe, copyright 2009

Conducting Framework Activities-II The second iteration Anda telah belajar bahwaincrement pertama adalah webapp informasi dan harus diselesaikan dalam waktu satu minggu Anda bertemu dengan pemangku kepentingan dan kemudian meninjau catatan Anda : Logo and graphics—need aesthetic design. One- or two-paragraph introduction. CPI mission statement (file exists) A word to visitors (someone will write this tomorrow) Basic navigation bar will look like … About the company Our offerings Home security products (hierarchical at next level) Monitoring services (a list) Our Technology (the new sensor) Contact us Other issues: Informational content will change over time. This “home page” will be the navigation starting point for content and functions required for subsequent increments. These slides are designed to accompany Web Engineering: A Practitioner’s Approach (The McGraw-Hill Companies, Inc.) by Roger Pressman and David Lowe, copyright 2009

Conducting Framework Activities-III The second iteration You spend a few minutes developing a plan Day 1: Create a prototype layout (a model) of the WebApp. Collect and review all existing CPI content and graphics. Get stakeholder feedback on prototype, if possible. Day 2: Using the prototype as a guide, begin construction of the increment. Build navigation bar. Lay out content areas. Integrate graphics, links, etc. Test all links for validity. Review all content for completeness and correctness. Day 3: FTP all files to (an existing) domain. Perform navigation tests. Deployment: Inform selected stakeholders that the increment is available. Day 4: Poll stakeholders for feedback. Make modifications based on stakeholder feedback. These slides are designed to accompany Web Engineering: A Practitioner’s Approach (The McGraw-Hill Companies, Inc.) by Roger Pressman and David Lowe, copyright 2009

Conducting Framework Activities-IV The next iteration You’ve deployed the informational WebApp the communication activity during this second iteration will identify the requirements (including content and functionality) assume that the second increment delivers the capability to select and download product specifications and related information the process flow is restarted at the beginning, performing the communication activity for this increment. The tasks you select to populate each framework activity for the increment may differ from the tasks performed for the preceding increment, but the overall process flow remains the same These slides are designed to accompany Web Engineering: A Practitioner’s Approach (The McGraw-Hill Companies, Inc.) by Roger Pressman and David Lowe, copyright 2009

Revisiting the Framework Activities WEPA pp. 32 - 42 menyajikan rincian dari tindakan menyeluruh dan tugas masing-masing dari lima kegiatan kerangka Anda bertemu dengan pemangku kepentingan dan kemudian meninjau catatan Anda Dan terus menyempurnakannya seluruh proyek These slides are designed to accompany Web Engineering: A Practitioner’s Approach (The McGraw-Hill Companies, Inc.) by Roger Pressman and David Lowe, copyright 2009

Umbrella Activities Background activities yang dapat dilakukan secara paralel pada kegiatan utama Sama penting untuk keberhasilan proyek Dan harus dipertimbangkan secara eksplisit. Many umbrella activities can be defined Namun hanya empat yang penting untuk proyek rekayasa Web sukses: These slides are designed to accompany Web Engineering: A Practitioner’s Approach (The McGraw-Hill Companies, Inc.) by Roger Pressman and David Lowe, copyright 2009

Umbrella Activities Change management. Mengelola dampak perubahan karena setiap kenaikan adalah rekayasa, mengintegrasikan alat-alat yang membantu dalam pengelolaan semua konten webapp Quality assurance. Mendefinisikan dan melakukan tugas-tugas yang membantu memastikan bahwa setiap produk kerja dan kualitas pengembangan system yang diselesaikan Risk management. Menganggap proyek dan risiko teknis sebagai pengembangan sistem yang direkayasa Project management. Pelacakan dan monitor kemajuan sebagai pengembangan sistem yang direkayasa These slides are designed to accompany Web Engineering: A Practitioner’s Approach (The McGraw-Hill Companies, Inc.) by Roger Pressman and David Lowe, copyright 2009