Perancangan Produk, Proses, Skedul dan Fasilitas session 3

Slides:



Advertisements
Presentasi serupa
Perancangan Sistem Produksi
Advertisements

Chapter 4 The Analysis and Design of Work

Pengendalian Kualitas
SI527 - ERP (Enterprise Resources Planning)
Managing Software Requirements (manajemen kebutuhan perangkat lunak)
RENCANA PENGEMBANGAN PERANGKAT LUNAK (RPPL)
TUGAS RISET OPERASI SISTEM ANTRIAN
Project Procurement Management
Roesfiansjah Rasjidin Program Studi Teknik Industri Fakultas Teknik – Univ. Esa Unggul.
MATERIAL RESOURCE PLANNING
FACILITY DESIGN NURUL UMMI, ST MT.
Kalkulasi Biaya Proses : Laporan Biaya Produksi
PENGANTAR AKUNTANSI MANAJEMEN
Compound Amount Factors
Inventory Management. Introduction Basic definitions ? An inventory is an accumulation of a commodity that will be used to satisfy some future demand.
Oleh: SARIPUDIN Jurusan SISTEM INFORMASI
1 Pertemuan 12 Pengkodean & Implementasi Matakuliah: T0234 / Sistem Informasi Geografis Tahun: 2005 Versi: 01/revisi 1.
MultiMedia by Stephen M. Peters© 2001 South-Western College Publishing Chapter 9 Production Management Introduction to.
Produktivitas dan Mutu
Masalah Transportasi II (Transportation Problem II)
Produktivitas dan Mutu
1 Pertemuan 22 Analisis Studi Kasus 2 Matakuliah: H0204/ Rekayasa Sistem Komputer Tahun: 2005 Versi: v0 / Revisi 1.
Result in Competitive Advantage from: Low costs Differentiation Result in Competitive Advantage from: Low costs Differentiation Improving Responsiveness.
INDONESIA INFRASTRUCTURE INITIATIVE IURSP – Monitoring dan Evaluasi IURSP – Monitoring and Evaluation Workshop 3 Steve Brown VicRoads International Projects.
Iveline Anne Marie Teknik Industri USAKTI
Pertemuan 1 PERTIMBANGAN DAN PROSEDUR UMUM DESAIN
Pasar Faktor Produksi.
Ulrich-Eppinger hal : SPESIFIKASI PRODUK Ulrich-Eppinger hal :
Gunawan. SISTEM PENILAIAN KKomponen Penilaian : AAbsensi (10 %) TTugas/Quis (10 %) UUjian I (mid semester) (40 %) UUjian II (akhir semester)
Backup DISUSUN OLEH: LUTHFAN HADI PRAMONO, S.ST HANYA DIPERGUNAKAN UNTUK KEPENTINGAN PENGAJARAN DI LINGKUNGAN POLITEKNIK TELKOM TK3233.
SIKLUS PRODUKSI BAB 6 PERTEMUAN 11.
9 Chapter Production Management Introduction to
BRIEFING tugas besar ANALISIS & ESTIMASI BIAYA 2015
Kuliah 4 : Spesifikasi Produk (Product Specification)
Magister Teknik Industri SPs USU
Pembuatan routing sheet dan multiple product process chart
9 Chapter Production Management Introduction to
Detailed Scheduling.
Detailed Scheduling Lecture 11.
Engineering Faculty Ulm.
CA113 Pengantar Manajemen Bisnis
PERANCANGAN ULANG TATA LETAK PABRIK PADA UD KURNIA
Software Engineering Rekayasa Perangkat Lunak
ALAT-ALAT PENGENDALIAN KUALITAS (2)
9 Chapter Production Management Introduction to
SISTEM PENYIMPANAN OTOMATIS (AUTOMATED STORAGE SYSTEMS)
Review materi sebelum UTS Perancangan Tata Letak Pabrik
MANAJEMEN OPERASI AGROINDUSTRI
Two-and Three-Dimentional Motion (Kinematic)
Pengantar Bisnis 7 Sessi.
CA113 Pengantar Manajemen Bisnis
PERANCANGAN SISTEM MANUFAKTUR
Manajemen Produksi.
Rabiatul Hasanah Nadia Putri Anugrah Ramadhan Khoirur Roziqin
Cost-Volume-Profit Analysis
Master data Management
Pengelolaan produksi dan operasi
PROSES PRODUKSI.
MANAJEMEN PEMASARAN.
CA113 Pengantar Manajemen Bisnis
Machining operation and machine tools
PERANCANGAN TATA LETAK FASILITAS
By Yulius Suprianto Macroeconomics | 02 Maret 2019 Chapter-5: The Standard of Living Over Time and A Cross Countries Source: http//
BAB 9 TEORI PRODUKSI. 2 Introduction Our focus is the supply side. The theory of the firm will address: How a firm makes cost-minimizing production decisions.
Pertemuan 6 Mappa Panglima Banding. 2 COST DRIVER: Definition Is a factor that causes, “drives,” an activity’s costs. LO 4.
SISTEM PENUNJANG KEPUTUSAN UNTUK SISTEM INFORMASI MANAJEMEN.
Rank Your Ideas The next step is to rank and compare your three high- potential ideas. Rank each one on the three qualities of feasibility, persuasion,
9 Chapter Production Management Introduction to
Work System Design “Work Measurement” Hardianto Iridiastadi, Ph.D.
Transcript presentasi:

Perancangan Produk, Proses, Skedul dan Fasilitas session 3 Menghitung kebutuhan jumlah mesin/peralatan/stasiun kerja

Question before alternative facility plan What is to be produced ? How are the products to be produced? When are the products to be produced? How much of each product will be produced ? For how long will the products be produced ? Where are the products to be produced ?

Keterkaitan antara perancangan produk, proses, skedul dan fasilitas

Product designer specify what the end product is to be in terms of dimensions, material composition, perhaps, packaging. Process planner determines how the product will be produced. Production Planner specifies the production quantities and schedules the production equipment. Facilities Planner dependent on timely and accurate input from product, process and schedule designers to carry out his effectively.

Tool of product design QFD (Quality Function Deployment) is an organized planning approach to identify customer needs and to translate the needs to product characteristics, process design, and tollerances required. Benchmarking can also be used to identify what the competition is doing to satisfy the needs of your customer or to exceed the expectation of your customer.

Product Design Involves both the determination of which products are to be produced and the detailed design of individual product. Influenced by aesthetics, function, materials and manufacturing consideration. Marketing, purchasing, industrial engineering, manufacturing engieering, product engineering and quality control. In the final analysis, the product must be meet the need of the customer.

Sequence of product design Mengidentifikasikan kemauan pelanggan. Mempelajari ketentuan teknis dalam menghasilkan barang atau jasa. Hubungan antara keinginan pelanggan dengan ketentuan teknis. Membandingkan kinerja perusahaan dengan pesaing. Evaluasi pelanggan untuk membandingkan pendapat pelanggan tentang kualitas produk yang dihasilkan oleh perusahaan. Trade off untuk memberikan penilaian pengaruh antar aktivitas atau sarana yang satu dengan yang lainnya

QFD

Process Design Identifying required process Selecting the required process Sequencing the required process

Process Design Identifying Required Analysis The make or buy decision process Part list ( includes : part number, part name, number of parts per product) Selecting the required processes Route sheet data requirement Sequencing the required processes Assembly chart Operation process chart Precedence diagram

Schedule Design Marketing information Process requirement Scrap estimate Specifying Total Equipment Requirement

Scrap estimate Pk = percentage of scrap produced on the k operation Ok = desired output of non defective from operation k Ik = production input to operation k

Example 1 A product has a market estimate of 97,000 components and required three processing steps (turning, milling and drilling) having scrap estimates of P1= 0.04, P2 = 0.01 dan P3 = 0.03. Calculate I1, I2, , I3 !

Specifying Total Equipment Requirement F = number of machines required per shift S = standard time (minutes) per unit produced Q = number of units to be produced per shift E = actual performance H = amount of time (minute) available per machine R = reliability of machine

Example A machined part has a standard machinery time of 2.8 min per part on a milling machine. During an 8-hr shift 200 units are to be produced. Of the 480 min available for production, the milling machine will be operational 80% of the time. During the time the machine is operational, pasts are produced at a rate equal to 95% of the standard rate. How many milling machines are required ?

Contoh soal Part A is produced in machines 1 and 2. Part B is produced in machines 3 and 4. Part A and B are assembled in workstation 5 to create C. Assembly C is painted in process 6. Given the scrap percentage P1, … , P6 for each operation and the desired output O6 for C, determine an equation that can be used to calculate the required input I1 to machine 1.

Penentuan jumlah mesin teoritis PTLP Laboratory, 2007 Kapasitas mesin teroritis/minggu : Nilai jumlah yang diharapkan untuk operasi ke-n diperoleh dari nilai jumlah yang disiapkan pada operasi ke (n+1) dikalikan dengan jumlah pieces yang diperlukan.

Jumlah disiapkan Produksi efisiensi Jumlah mesin teoritis

Routhing Sheet _Soal Seorang manajer pabrik sedang merancang lantai pabriknya untuk menghadapi pesanan produk baru untuk tahun depan sebanyak 500.000 unit. Produk itu terbuat dari 2 komponen A, 1 komponen B dan 2 komponen C dengan data sebagai berikut :

Set up time/lot (menit) Komp No operasi No mesin Set up time/lot (menit) Run time/lot (menit) % scrap % reliability A 1 M-2 10 0.5 2 90 M-1 15 0.4 4 85 3 M-3 0.75 95 B 20 0.8 2.5 1.2 C 1.0 25 Produk R- 1 - 100

Adapun data penunjang lainnya adalah sebagai berikut : 1. Jumlah hari kerja per tahun : 300 hari 2. Jumlah jam kerja per hari 8 jam 3. Ukuran lot (A, B, C, Produk) (100, 200, 150, 1) unit 4. Efisiensi pabrik 90 + digit terakhir NIM anda

Anda diminta membantu manager tersebut dengan menghitung : Jumlah mesin yang diperlukan Jumlah kebutuhan bahan baku jika diketahui bahwa bahan baku berupa baja lembaran berukuran 120 cm x 200 cm x 3 cm yang setiap lembarnya dapat memproduksi 4 buah A, atau 5 buah B atau 10 buah C.

Case Study Sebagai seorang engineer anda diminta untuk merancang tata letak sebuah pabrik furniture berbahan dasar kayu rotan yang banyak dijumpai di pedalaman pelosok Indonesia yang produknya berupa kursi rotan, meja tamu, lemari, rak-rak hias bahkan kap lampu dan diharapkan akan mampu dieksport ke berbagai negara di AS dan Eropa. Untuk perancangan fasilitas pabrik tersebut dibutuhkan beberapa informasi antara lain informasi tentang : rancangan produk, rancangan proses dan rancangan skedul. Pertanyaan : Dapatkah anda menjelaskan kriteria-kriteria ketiga rancangan tersebut dan bagaimana kontribusinya terhadap rancangan fasilitas ?

TUGAS “Facilities Planning, 2nd James A. Tompkins dkk, Jhon Wiley and Sons, Inc, USA, 1996. 3.1, 3.9, 3.10, 3.11, 3.12, 3.13