File: urd-bis.ppt Sigit A SantaHalaman 1 LAPORAN KEMAJUAN KAJIAN TURBINE GENERATOR SYSTEM PLTN PWR
File: urd-bis.ppt Sigit A SantaHalaman 2 EPRI US UTILITYOTHERS UTILITY URD VOL I ALWR Policy and Summary Of Top Tier Requirement URD VOL. II Design Requirement For Evolusionary ALWR URD VOL. III Design Requirement For Passive ALWR DEPT OF ENERGY Utility Requirement Document
File: urd-bis.ppt Sigit A SantaHalaman 3 ChapterTitle 1.Overall Requirements 2.Power Generation Systems 3.Reactor Coolant System & Reactor Non-Safety Aux. Sys. 4.Reactor Systems 5.Engineered Safety Systems 6.Building Design and Arrangement 7.Fueling and Refueling 8.Plant Cooling Water Systems 9.Site Support Systems 10.Man-Machine Interface 11.Electric Power System 12.Radioactive Waste Processing Systems 13.Turbine Generator Systems URD Volume II
File: urd-bis.ppt Sigit A SantaHalaman 4 MHI PWR Schematic Diagram
File: urd-bis.ppt Sigit A SantaHalaman 5 3. Technical Specifikation fo the Turbine Generator System (TST) ItemsBobot % Target 3.1.Introduction(6) 6% 3.2.Steam and Feed Water Lines(7) 13% 3.3.Turbine and Auxiliary System(22) 35% Juli 3.4.Generator and Auxiliary System(25) 60% Agust 3.5.Condensing System(15) 75% Sept 3.6.Condensate/Feedwater Heating System(12) 87% Sept 3.7.Main Cooling Water System(4) 91% Okt 3.8.Conventional Service Water & (6) 97% Okt Componen Cooling Water System 3.9.Water Treatment(3) 100%Nov Total100% Tech. Spec. TG System