Metode Pelaksanaan Konstruksi Perkerasan Jalan (MPKPJ)

Slides:



Advertisements
Presentasi serupa
Fisika 2 Pendahuluan. Rencana Kuliah Fisika 2 Aturan Penilaian No.Komponen PenilaianPersentase Kehadiran Tugas-tugas Ujian Tengah Semester.
Advertisements

WE-2010 Web Engineering Husni husni.trunojoyo.ac.id
TURUNAN/ DIFERENSIAL.
PEMOGRAMAN BERBASIS JARINGAN
Teknologi Informasi. Materi 1.History of Computer 2.History of Telecommunication + Mobile 3.Operating System + Software & Story of Sillicon Valley 4.Video:
4 - 1 Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved.
MULTIMEDIA* Amirudin Y. Dako, ST. M.Eng
MELAKUKAN INSTALASI SISTEM OPERASI WINDOWS XP
SISTEM LIGHT-TRONIC Sistem Penerangan.
PELAKSANAAN GEDUNG MKPB
Teknologi Mobile TEORI (3 sks): Selasa (TI-1) Pukul 15.00
Kontrak Perkuliahan Kuliah Bahasa Inggris dimulai pada minggu ke-1 tanggal 23 Februari 2009 Responsi Bahasa Inggris dimulai pada minggu kedua tanggal 2.
ANALISIS DAN PERANCANGAN SISTEM
SID  LABORATORIUM KECAKAPAN BASIS IT © 2007, STPI halaman 1 SITE PLAN PENEMPATAN RUANGAN LABORATORIUM.
Pemrograman Visual 2 Erna Sri Hartatik
Rekayasa Perangkat Lunak ( Software Engineering )
Z - SCORE Presented by Astuti Mahardika, M.Pd.
SOAL ESSAY KELAS XI IPS.
Tugas-Tugas.
PENGANTAR URBAN DESAIN
PENGANTAR KOMPUTER & TI 1A
Prinsip Pembuatan Study Guide
1. Objek dalam kalimat aktif menjadi subjek dalam kalimat pasif
KIMIA ORGANIK II ELFI SUSANTI VH.
Mr. Ari Nurrohmat, S.Pd Present PROCEDURE for Grade IX.
Overview of Transportation Engineering
Menjelaskan sifat – sifat komponen elektronika aktif dan pasif
Certified Management Accountant - Australia
Pertemuan 3 Menghitung: Nilai rata-rata (mean) Modus Median
1 Magister Teknik Perencanaan Universitas Tarumanagara General View On Graduate Program Urban & Real Estate Development (February 2009) Dr.-Ing. Jo Santoso.
TURUNAN DIFERENSIAL Pertemuan ke
AUSTRALIA INDONESIA PARTNERSHIP FOR EMERGING INFECTIOUS DISEASES Excel tingkat menengah – Bagan (lanjutan) Location Date Name.
JARINGAN KOMPUTER DAHLAN ABDULLAH Web : FB Pribadi : Dahlan Abdullah FB MK : MK Jaringan Komputer.
Lecture 1 Introduction to C# Erick Pranata © Sekolah Tinggi Teknik Surabaya 1.
TUGAS AKHIR VISUAL COMMUNICATION DESIGN
Bahan ujian 1.Valuasi. Bab 9 dan Restrukturisasi dan Divestasi. Bab 11 dan 12 (buku A). 3.Financial Restructuring. Bab 13 (buku A 4.Strategi Aliansi.
Kualitas Layanan dan Kehandalan Sistem Komunikasi 1/9 PI September 2009 KUALITAS LAYANAN dan KEHANDALAN SISTEM KOMUNIKASI.
Contentment Philippians 4: Contentment What does it mean to be content? What does it mean to be content? Are you a content person? Are you a content.
SMPN 2 DEMAK GRADE 7 SEMESTER 2
MANPRO-M13: MUTU PROYEK SISTEM
SILABUS PENULISAN KARYA ILMIAH
Algoritma dan Struktur Data Menggunakan Java
SISTEM INFORMASI KEUANGAN
DOSEN: MEILY MARGARETHA, S.E., M.Ed Fakultas Ekonomi-Manajemen
Kontrak Kuliah Basis Data 2.
PENJUMLAHAN GAYA TUJUAN PEMBELAJARAN:
PENGANTAR KAJIAN BUDAYA URBAN
Dasar-Dasar Periklanan
FISIKA DASAR By: Mohammad Faizun, S.T., M.Eng. Head of Manufacture System Laboratory Mechanical Engineering Department Universitas Islam Indonesia.
AUSTRALIA INDONESIA PARTNERSHIP FOR EMERGING INFECTIOUS DISEASES PELATIHAN EXCEL DASAR.
ILMU PERILAKU KESEHATAN
Pemrogramman Terstruktur
Biokimia Veteriner 1 Semester Ganjil 2012/2013
PENGENALAN MATA KULIAH
Kode PJK 449 TEKNOLOGI PEMBELAJARAN PENDIDIKAN JASMANI
Suwirno Mawlan, S.Kom., M.T.I
Dasar Pemrograman ARRAY/LARIK.
INTEROPERABILITAS Catur Iswahyudi, S.Kom, S.E
Perancangan Perkerasan
Paket 11 HAKIKAT KESULITAN BELAJAR
Mata kuliah Matematika 3
SISTEM INFORMASI AKUNTANSI I
ASSESMENT COURSE STEEL STRUCUTRE
Silabus Riset Operasi Bobot: 4 SKS.
Kode MK : PEM 4002 SKS: 3 (2-1) Waktu: 100 menit / tatap muka Dosen pengasuh: Dr.Ir.Ifar Subagiyo,M Agr St Ir. Siti Nurul Kamaliyah,MP. Semester: 2.
1 TKS sks (W) 2 1. Mengerti istilah2 dan konsep dasar sifat-sifat material bahan konstruksi. 2. Memahami anatomi kayu, sifat-sifat kayu untuk.
PERATURAN MENGGUNAKAN SDA( STRUCTURAL DIGITAL ASSIGNMEANT)
BAHAN PERKERASAN (Semester 5; 2 sks)
PERANCANGAN PERKERASAN JALAN RENI KARNO KINASIH
Have out your north v. south paper from last week
Transcript presentasi:

Metode Pelaksanaan Konstruksi Perkerasan Jalan (MPKPJ) Dr. Sri Atmaja P. Rosyidi

Silabus Kuliah Tujuan: Mahasiswa memahami konsep perkerasan jalan (lentur maupun kaku) dengan baik dari aspek bahan dan filosofi konstruksinya. Mahasiswa memahami konsep pelaksanaan perkerasan jalan. Mahasiswa dapat mengetahui alur pelaksanaan konstruksi perkerasan jalan, beserta peralatan yang diperlukan. Mahasiswa dapat mengetahui metode ukur untuk supervisi konstruksi perkerasan jalan. Mahasiswa dapat menghitung biaya (RAB) konstruksi perkerasan jalan.

Silabus Perkerasan Jalan Pekerjaan Tanah Pekerjaan Lapis Fondasi Sejarah Konsep dan filosofinya Pekerjaan Tanah Pekerjaan Lapis Fondasi Pekerjaan Lapis Permukaan Metode Supervisi Lapangan RAB

Kontrak Belajar Tatap Muka: 12-14 kali pertemuan (100 menit). Penilaian: Tugas makalah (individu) dan presentasi : 20 % Tugas kelompok dan tutorial: 10 % Quiz dan Homeworks: 15 % Ujian : 50 % Kehadiran: 5 %

Apa itu Perkerasan Jalan?

Why do we need pavements and why do we make them out of HMA and PCC? Photo courtesy of Joe Block Why do we need pavements and why do we make them out of HMA and PCC?

Olympic Peninsula (ca. 1924) Dirt Road Olympic Peninsula (ca. 1924) Washington Localities Collection, UW Digital Collections

Greenwood Ave. N & 85th St. N. Seattle (1904)

Last of the mail wagons Seattle (1913)

From Clay McShane’s Down the Asphalt Path, The Automobile and the American City (1994)

Block Boys and Horse Manure Pitt St., Sydney, Australia (n.d.) From the City of Sydney's Sydney Streets exhibition (www.cityofsydney.nsw.gov.au/history/SydneyStreets)

County Road near Index, WA (1911) Muddy Dirt Road County Road near Index, WA (1911) UW Digital Collections

Apa Tujuan dibangunnya “Perkerasan Jalan” ? DC to Richmond Road in 1919 – from the Asphalt Institute

E Republican St., Seattle Cobblestone Road E Republican St., Seattle

Front St., Port Angeles (1914) Plank Road Front St., Port Angeles (1914) Notice the relatively high quality of this plank pavement in Port Angeles Asahel Curtis Photo Company Collection, UW Digital Collections

Macquarie St., Sydney, Australia (1925) Woodblock Paving Macquarie St., Sydney, Australia (1925) City pavements required some roughness so that horses could get a foothold and traction. Wood blocks were considered ideas (for a while) because they could mimic the foothold of cobblestone or block pavement, but the wood muffled the sound of the horseshoes. Problem was, wood deteriorated quickly (3 to 5 years for a plank pavement). Wood blocks treated with creosote to make them last upwards of 10 to 15 years (likely an exaggerated claim). Wood blocks lost popularity in the U.S. partly because of a couple of: Chicago Fire (1871). Streets with creosote soaked wood blocks served to spread the fire rather than serve as fire barriers. They didn’t last in may places, especially Washington, D.C. (1878) – lasted 5 years and city spent 20 years paying off bonds for a pavement that no longer existed. Introduction of asphalt pavements and concrete foundations. From the City of Sydney's Sydney Streets exhibition (www.cityofsydney.nsw.gov.au/history/SydneyStreets)

James St. from 4th Ave., Seattle (ca. 1922) Brick Road James St. from 4th Ave., Seattle (ca. 1922) Seattle Photograph Collection, UW Digital Collections

Woodblock Paving Overlaid with Hot Mix Asphalt Park St., Sydney, Australia (1929) Many streets were overlaid with a thin layer of “sheet asphalt”. Concrete was often used as a base and then surfaced with asphalt. Concrete shattered under iron horseshoe loads but could withstand more loads without deforming. Solution was to pave concrete and then surface with softer, smoother asphalt. From the City of Sydney's Sydney Streets exhibition (www.cityofsydney.nsw.gov.au/history/SydneyStreets)

Independent Asphalt Paving Co. Seattle (ca. 1907) Paying for Roads/Pavement Generally abutters paid for improvements. Originally they paid for roads and pavements independent of the City. Later, special assessments became common, although the only thing the City really did was provide engineering advice and coercive and borrowing power. Often, quality of pavement was bad as abutters sought cheapest fix. Parking was sometimes included between sidewalk and abutters. People were allowed to plant there but not build (still have vestiges of this today). Seattle Photograph Collection, UW Digital Collections

Warrenite Pavement Bothell Rd. (1912) Industries and Occupations Photographs, UW Digital Collections

Warrenite Pavement Bothell Rd. (1912) Industries and Occupations Photographs, UW Digital Collections

Kondisi Perkerasan Jalan A look at what pavement condition is? Need to ask what is good, what is bad and how do we know?

Pavement Condition I – 90 “fat driver” syndrome From WSDOT

Perkerasan Lentur Structure Surface course Base course Subbase course Subgrade

Tipe-Tipe Perkerasan Lentur Dense-graded Open-graded Gap-graded

Konstruksi Perkerasan Lentur

Perkerasan Kaku Structure Surface course Base course Subbase course Subgrade

Tipe Perkerasan Kaku Jointed Plain Concrete Pavement (JPCP)

Tipe Perkerasan Kaku Continuously Reinforced Concrete Pavement (CRCP) Photo from the Concrete Reinforcing Steel Institute

Konstruksi Perkerasan Kaku Slipform Fixed form More in pavement guide interactive Stevens Way will be fixed form starting in May