Operations Management

Slides:



Advertisements
Presentasi serupa
Developing Knowledge Management dalam perusahaan Week 10 – Pert 19 & 20 (Off Class Session)
Advertisements

Pengujian Hipotesis untuk Satu dan Dua Varians Populasi
3. Economic Returns to Land Resources: Theories of Land Rent
PEMOGRAMAN BERBASIS JARINGAN
Aspek Sosial & Organisasi Restyandito, S.Kom, MSIS.
PERUBAHAN VS PERBAIKAN Center for Continuous Improvement, Today is better than yesterday, tomorrow is better than today
© 2009 Fakultas Teknologi Informasi Universitas Budi Luhur Jl. Ciledug Raya Petukangan Utara Jakarta Selatan Website:
SM Pengantar Sistem Telekomunikasi Semester genap
Materi Analisa Perancangan System.
Peta Kontrol (Untuk Data Variabel)
IT SEBAGAI ALAT UNTUK MENCIPTAKAN KEUNGGULAN KOMPETISI
Process to Process Delivery
IT Project Management Based on PMBOK
Slide 3-1 Elmasri and Navathe, Fundamentals of Database Systems, Fourth Edition Revised by IB & SAM, Fasilkom UI, 2005 Exercises Apa saja komponen utama.
PENGANTAR URBAN DESAIN
Information Distortion & Bullwhip Effect
Review IS & Software System Concept Diah Priharsari PTIIK – Universitas Brawijaya Source: 1.Obrien & Marakas, Management Information.
Introduction to The Design & Analysis of Algorithms
IF-ITB/SAS/25Aug2003 IF7074 – Bagian Pertama Page 1 IF 7047 Kewirausahaan Teknologi Informasi Bagian Pertama: 1.1. Entrepreneurship, entrepreneur, dan.
Principles of Marketing Fifth Canadian Edition Philip Kotler, Gary Armstrong, Peggy H. Cunningham.
1 KOMPONEN PERUMUSAN PROGRAM KOMUNIKASI 1.Assesment - Focus the target audience 2.Planning - Target audience - Key of consumer benefit - Believe of the.
KNOWLEDGE MANAGEMENT: philosophy, processes, and pitfalls EXTRACTED FROM Soo, Devinney, Midgley, Deering (2002) CALIFORNIA MANAGEMENT REVIEW, 44 (4) 1seri.
PROSES PADA WINDOWS Pratikum SO. Introduksi Proses 1.Program yang sedang dalam keadaan dieksekusi. 2.Unit kerja terkecil yang secara individu memiliki.
1. Objek dalam kalimat aktif menjadi subjek dalam kalimat pasif
KIMIA ORGANIK II ELFI SUSANTI VH.
Review Operasi Matriks
Ekonomi Manajerial dalam Perekonomian Global
Pengantar/pengenalan (Introduction)
Green Productivity Prof. Ir. Moses L. Singgih, MSc, PhD
How human charactersitics, practitioners’ habits and health care system regulations affet the research and development of medical devices.
The Key Activity in Knowledge Organizations: Transferring Knowledge Karl Erik Sveiby All assets -tangible, intangible- are the result of human actions.
Risk Management.
Ruang Lingkup Bisnis Dr. Mohammad Abdul Mukhyi. SE., MM
Implementing an REA Model in a Relational Database
MEMORY Bhakti Yudho Suprapto,MT. berfungsi untuk memuat program dan juga sebagai tempat untuk menampung hasil proses bersifat volatile yang berarti bahwa.
3 nd Meeting Chemical Analysis Steps and issues STEPS IN CHEMICAL ANALYSIS 1. Sampling 2. Preparation 3. Testing/Measurement 4. Data analysis 2. Error.
1 Magister Teknik Perencanaan Universitas Tarumanagara General View On Graduate Program Urban & Real Estate Development (February 2009) Dr.-Ing. Jo Santoso.
2nd MEETING Assignment 4A “Exploring Grids” Assignment 4 B “Redesign Grids” Create several alternatives grid sysytem using the provided elements: (min.
Thinking in terms of “Systems” What is a system? A system is a collection of interrelated components (subsystems) that function together to achieve some.
Roundtable discussion on citizen engagement for good governance in East Indonesia diskusi keterlibatan penduduk untuk tata pemerintahan yang baik di Indonesia.
Activity – Based Management 31/10/2009Akuntansi Manajemen Lanjutan.
LOGO Manajemen Data Berdasarkan Komputer dengan Sistem Database.
LIMIT FUNGSI LIMIT FUNGSI ALJABAR.
Linked List dan Double Linked List
Human Resource Management MSDM strategis M-2 1Tony Soebijono.
Definisi VLAN Pemisahan jaringan secara logis yang dilakukan pada switch Pada tradisional switch, dalam satu switch menunjukkan satu segmentasi LAN.
MODELS OF PR SYIFA SA. Grunig's Four models of Public Relations Model Name Type of Communica tion Model Characteristics Press agentry/ publicity model.
Metodologi Penelitian dalam Bidang Informatika
3.1 © 2007 by Prentice Hall OVERVIEW Information Systems, Organizations, and Strategy.
MANPRO-M13: MUTU PROYEK SISTEM
THE IMMERSED TUNNELS MAIN BENEFITS AND INNOVATION BY. WAWAN SETIAWAN.
1. 2 Work is defined to be the product of the magnitude of the displacement times the component of the force parallel to the displacement W = F ║ d F.
© 2009 Fakultas Teknologi Informasi Universitas Budi Luhur Jl. Ciledug Raya Petukangan Utara Jakarta Selatan Website:
1 Business Function 18/07/ Business Cycle and Process BUSINESS CYCLE BUSINESS FUNCTION BUSINESS LEVEL 18/07/2002.
Luas Daerah ( Integral ).
MARKETING MIX (BAURAN PEMASARAN).
TCP, THREE-WAY HANDSHAKE, WINDOW
Mengapa Strategi Gagal Diterapkan?
PT. GAKA KARYA ENGINEERING
Introduction to MANAGEMENT Prepared for MM UNSOED 2013
Slide 1 Chapter 1: Introduction to Systems Analysis and Design Alan Dennis, Barbara Wixom, and David Tegarden John Wiley & Sons, Inc.
J0444 OPERATION MANAGEMENT
Minimalist Motion Planning Using Global Topological Guarantees
Roles of Transmembrane Proteins
ENTREPRENEURSHIP Lecture No: 44 BY CH. SHAHZAD ANSAR
Universal Design and Autonomous Vehicles
What is Kerberos? Network Security.
HRD in Small and Medium-sized Enterprises (SMEs)
Supply, Demand, and Government Policies
Content Marketing Template
Transcript presentasi:

Operations Management Chapter 16 – JIT and Lean Operations By : Hermawan Susilo (13) Istiyana Ulta K (14) L. Tri Wahyudi (16) Aditya Narendra M (20)

Toyota Motor Corporation Largest vehicle manufacturer in the world with annual sales of over 9 million vehicles Success due to two techniques, JIT and TPS by Taiichi Ohno Central to JIT is a continuous problem solving by making only what is needed, when it is needed Central to TPS is employee learning and continuing effort to create product under ideal conditions, without waste San Antonio plant, small building but high levels of production

DICTINCTION Just-In-Time, TPS, and Lean Operations JIT emphasizes continuos forced problem solving by reduced inventory TPS emphasizes employee learning Lean production supplies the customer with their exact wants when the customer wants it without waste Thoughput

The 5s - jepang Eliminate Waste “ Waste is anything that does not add value from the customer point of view ” Sort/segregate – keep what needed Simplify/straighten – methods analysis tools Shine/sweep – clean daily Standardize – remove variations from processes Sustain/self-discipline – review work and recognize progress - motivasi Ohno’s Seven Waste Overproduction overproduksi Queues antrian Transportation raw matrial Inventory penyimpanan Motion pergerakan orang Overprocessing proses yang tidka perlu dilakukan Defective products Safety – build in good practices Support/maintenance – reduce variability and unplanned downtime

Remove Variability JIT systems require managers to reduce variability caused by both internal and external factors Variability is any deviation from the optimum process (variability = problems) Less variability results in less waste Source of variability : Incomplete or inaccurate drawings or specifications Poor production processes resulting in incorrect quantities, late, or non-conforming units Unknown customer demands Penyebab : Pure production/produksi tidka sempurna karena defect Cuetomer tidak jelas mintanya apa

PULL SYSTEM Improve Throughput Throughput time is the time it takes to move an order from receipt to delivery The time between the arrival of raw materials and the shipping of the finished order is called manufacturing cycle time Driving down manufacturing cycle time can make a major improvement in throughput PULL SYSTEM Improve throughtput :

PULL SYSTEM Pulls a unit to where it is needed just as it is needed By pulling material in small lots, inventory cushions are removed, exposing problems and emphasizing continual improvement Pulls systems are standart tools of JIT system Pull system berangkat dari lean operation Kita

Just-In-Time (JIT) Powerful strategy for improving operations Materials arrive where they are needed when they are needed Partnershio : hubungan antara pabrik dengan supplier Tujuannya adalah menghilankan kegiatan yang ndak perlu Mengurangi stock barang di pabrik

JIT PARTNERSHIPS JIT partnerships exist when a supplier and purchaser work together to remove waste and drive down costs Four goals of JIT partnerships are: Removal of unnecessary activities Removal of in-plant inventory Removal of in-transit inventory Improved quality and reliability

Concerns of Suppliers Diversification – ties to only one customer increases risk Scheduling – don’t believe customers can create a smooth schedule Changes – short lead times mean engineering or specification changes can create problems Quality – limited by capital budgets, processes, or technology Lot sizes – small lot sizes may transfer costs to suppliers

Reduce waste due to movement JIT Layout Reduce waste due to movement Distance Reduction – major constribution of work cells, work centre, focused factories Increase Flexibility – easily rearranged, change result of product & process Impact on employees - flexible & efficiency Reduced space and inventory - with reduced space, inventory must be in very small lots

JIT Inventory Inventory is at the minimum level necessary to keep operations running JIT Inventory Tactics Use a pull system to move inventory Reduce lot sizes Develop just-in-time delivery systems with suppliers Deliver directly to point of use Perform to schedule Reduce setup time Use group technology Table 16.2

Reduce inventory and Variability Inventory level Process downtime Scrap Setup time Late deliveries Quality problems (a) (b) Figure 16.3 (c)

JIT Scheduling Schedules must be communicated inside and outside the organization Level schedules Process frequent small batches Freezing the schedule helps stability Kanban Signals used in a pull system

Level Schedules Process frequent small batches rather than a few large batches Make and move small lots so the level schedule is economical Freezing the schedule closest to the due dates can improve performance

Kanban Kanban is the Japanese word for card The card is an authorization for the next container of material to be produced A sequence of kanbans pulls material through the process Many different sorts of signals are used, but the system is still called a kanban

JIT Quality Strong relationship JIT cuts the cost of obtaining good quality because JIT exposes poor quality Because lead times are shorter, quality problems are exposed sooner Better quality means fewer buffers and allows simpler JIT systems to be used

JIT Quality Tactics Use statistical process control Empower employees Build fail-safe methods (poka-yoke, checklists, etc.) Expose poor quality with small lot JIT Provide immediate feedback Table 16.4

Toyota Production System Continuous improvement Build an organizational culture and value system that stresses improvement of all processes Part of everyone’s job Respect for people People are treated as knowledge workers Engage mental and physical capabilities Empower employees Standard work practice Work shall be completely specified as to content, sequence, timing, and outcome Internal and external customer-supplier connection are direct Product and service flows must be simple and direct Any improvement must be made in accordance with the scientific method at the lowest possible level of the organization

Lean Operations Different from JIT in that it is externally focused on the customer Starts with understanding what the customer wants Optimize the entire process from the customer’s perspective

Building a Lean Organization Transitioning to a lean system can be difficult Lean systems tend to have the following attributes Use JIT techniques Build systems that help employees produce perfect parts Reduce space requirements Develop partnerships with suppliers Educate suppliers Eliminate all but value-added activities Develop employees Make jobs challenging Build worker flexibility

Lean Operations in Services Suppliers Layouts Inventory Scheduling

JIT at Arnold Palmer Hospital VIDEO CASE : JIT at Arnold Palmer Hospital

ABOUT ARNOLD PALMER RS Ibu dan Anak, berdiri tahun 1989 Melayani 10.000 kelahiran per tahun Ranking 5 kelahiran selamat tertinggi Diperlukan $ 30 Juta/ tahun untuk kepuasan pelanggan dan biaya inventory.

JIT ARNOLD PALMER Custom Surgical Packs, dengan 10 pack yang berbeda. Obat didistribusikan melalui dispensing machines (seperti vending machines). Custom Surgical Packs, dengan 10 pack yang berbeda.

SURGICAL

MAYOR SET

SURGERY PACKAGING

JIT FOR SURGICAL PACKAGE Jadwal Operasi Order ke supplier (1:00 – 2:00 PM) Dipersiapkan untuk operasi Supplier kirim ke RS (4:00 AM)

ADVANTAGE JIT ARNOLD PALMER Waste reduction Variability reduction Inventory pull when needed Menghemat biaya inventory harian dari $400,000 menjadi 114,000.

JUST-IN-TIME MODEL IN CONSTRUCTION LOGISTICS Agung Sedayu Group

Proyek konstruksi sangat kompleks Resource intensive Perlu perencanaan matang dalam hal pembelihan, pengiriman, penyimpanan, dan pemindahan material konstruksi

KEY SUCCESS Hubungan kerjasama yang stabil dan jangka panjang antara developer dengan suppliers Suppliers memiliki akses langsung pada informasi progress project dan kebutuhan material Mutual understanding & komitmen semua pihak mengenai Biaya-Mutu-Waktu

TAHAPAN KONSTRUKSI

ASG JUST IN TIME MODEL

KESIMPULAN Dengan adanya tranfer informasi selama proses konstruksi, pengetahuan mengenai kebutuhan bahan bangunan dari Planning Department dan suppliers akan semakin baik. Planning Department bisa menyiapkan rencana jauh-jauh hari dan mentranfernya kepada Purchasing Department sebelum material bangunan habis. Good logistics system relies on good communication among the parties.