SMED & Teknik Reduksi Set-Up

Slides:



Advertisements
Presentasi serupa
Desain Dan Analisis Algoritma
Advertisements

Basic Issue In System Administration. Bassic Issue In System Administration Creating and managing accounts Performing administrative task Access control.
Oleh : Handy Wicaksono, ST
SISTEM PRODUKSI TEPAT WAKTU (JUST IN TIME-JIT)
MOTOR BAKAR Kuliah I.
Teknik Manufaktur.
Information Systems, Organizations, and Strategy
FI-1101: Kuliah 14 TERMODINAMIKA
CONCURENCY CONTROL DISTRIBUTED DATABASE. M AIN TOPICS Transaction managements Centralized database Distributed database Consistency control Centralized.
Reduksi / Pengurangan Set-Up
Sistem Manusia – Mesin (Work System)
Pendahuluan Algoritma Pengolahan Paralel S1-TI Prepared by: MT Wilson.
MATERIAL RESOURCE PLANNING
BLACK BOX TESTING.
Inventory Management. Introduction Basic definitions ? An inventory is an accumulation of a commodity that will be used to satisfy some future demand.
Organisasi dan arsitektur komputer
Electronic Business Pertemuan 1. E-Commerce merupakan suatu aplikasi dan proses bisnis yang menghubungkan perusahaan, konsumen dan komunitas tertentu.
Flexible Manufacturing System
Tujuan : Mampu mengukur dan menentukan waktu baku
PERTEMUAN KE-6 UNIFIED MODELLING LANGUAGE (UML) (Part 2)
Manajemen Proyek Sistem Informasi
13 Akuntansi Biaya Activity Based Costing
1 Pertemuan 6 Komunikasi antar Proses (IPC) Lanjutan Matakuliah: T0316/sistem Operasi Tahun: 2005 Versi/Revisi: 5 OFFCLASS01.
Modul ke: Fakultas Program Studi Mesin Pemindah Bahan Pembuatan Template Powerpoint untuk digunakan sebagai template standar modul-modul yang digunakan.
1 Pertemuan 03 Konsep Perencanaan Tag, Tag Price, Label, Casing Display Matakuliah: UO276 / Desain Komunikasi Visual III Tahun: 2006.
PERFORMANCE-BASED ASSESMENT DEFINITION CHARACTERISTIC S DESIGNING PERFORMANCE ASSESSMENT END TERM OF PERFORMANCE ASSESSMENT.
Sistem Temu-Balik Informasi INFORMATION RETRIEVAL SYSTEMS (IRS)
Sejarah perkembangan manajemen industri
REKAYASA PROSES BISNIS KODE MK
Thermodinamika FAKULTAS TEKNOLOGI INDUSTRI UNIVERSITAS MERCU BUANA
SISTEM PRODUKSI TEPAT WAKTU (JUST IN TIME-JIT)
ANALISA KESELAMATAN KERJA
DATA WAKTU GERAKAN (Predetermined Motion-Time System)
UNIVERSITAS 17 AGUSTUS 1945 JAKARTA
STRUKTUR SISTEM PENGUKURAN KINERJA INDIVIDUAL METRICS METRIC SETS OVERALL PERFORMANCE MEASUREMENT SYSTEM.
CLASS X SEMESTER 2 SMKN 7 BANDUNG
SISTEM PRODUKSI TEPAT WAKTU (JUST IN TIME-JIT)
Pertemuan 1 Dadang Munandar, M.Si
ALAT-ALAT PENGENDALIAN KUALITAS (1)
2. MAKING THE MOLD MODEL BASIC COMPETENCY
Software Engineering Rekayasa Perangkat Lunak
Sistem Meniadakan Cacat
Reduksi / Pengurangan Set-Up
Pertemuan <<18>> << Penemuan Fakta(01) >>
Analytical Hierarchy Process ( AHP )
Pengantar : Methods, Standard, and Work Design
SISTEM PRODUKSI TEPAT WAKTU (JUST IN TIME-JIT)
MATERI PELATIHAN Pengelompokan (klasifikasi material)
6. CERAMIC BUILDING USING THE SLIP CASTING TECHNIQUE
TERMODINAMIKA Departemen Fisika
MANAJEMEN OPERASI AGROINDUSTRI
Pertemuan 10 Kombinasi Data Label Kemasan dan Kemasan
OPERATES MOULD AND CORE MACHINE
Organizes Sistem Komputer
Micro-programmed Control (Kontrol Termikroprogram)
MAKE THE GYPSUM MOLD FOR ONE-SIDE IMPRESS TECHNIQUE
Tujuan : Mampu mengukur dan menentukan waktu baku
ANALISIS & DESAIN SISTEM
Organisasi Komputer II
Sistem Temu-Balik Informasi INFORMATION RETRIEVAL SYSTEMS (IRS)
Master data Management
SMED & Teknik Reduksi Set-Up
Organisasi Komputer II
SISTEM PRODUKSI TEPAT WAKTU ( JUST IN TIME -JIT).
SISTEM PRODUKSI TEPAT WAKTU (JUST IN TIME-JIT)
Machining operation and machine tools
Pengantar : Methods, Standard, and Work Design
HughesNet was founded in 1971 and it is headquartered in Germantown, Maryland. It is a provider of satellite-based communications services. Hughesnet.
Rank Your Ideas The next step is to rank and compare your three high- potential ideas. Rank each one on the three qualities of feasibility, persuasion,
HANDLING RUSH PRESIDENT UNIVERSITY NURLAELA RIZKINA.
Transcript presentasi:

SMED & Teknik Reduksi Set-Up

S M E D The SMED System ingle inute xchange of ie SUTR/One Hour-Lean 201 The SMED System Step-by-step method to reduce setup time Developed by Shigeo Shingo Applicable in all industries Useful in streamlining other processes xchange of S M E D ingle inute ie setup in under 10 minutes “Single Minute Exchange of Die” it may have been more appropriate to title this idea as, “Single Digit…” But the acronym would not have had as much …’pizzazz.’ Draft: Version 2

Mereduksi Waktu Setup Put the “basics” in place SUTR/One Hour-Lean 201 Mereduksi Waktu Setup Put the “basics” in place workplace organization 5 S’s visual controls Analyze and improve setup using SMED Internal Setup Work that must be done while the machine is stopped External Setup Work that can be done while the machine is running 5S-Sort, Set-in-order, Shine, Standardize & Sustain Everything that can be done to eliminate distractions and other unsafe practices Everything that can be done to focus the employee on the ‘Task-at-Hand’ Then SMED can take off… Without the preliminaries…Who knows? Draft: Version 2

Dasar-Dasar SMED There are two types of setup tasks: SUTR/One Hour-Lean 201 Dasar-Dasar SMED There are two types of setup tasks: internal (machine down) external (machine running) Eliminating or streamlining a setup task requires a clear understanding of that task’s real purpose and function When it comes to Internal vs. External, I try to remember that changing the saw blade on a rotary power saw is an INTERNAL OPERATION. The machine or process MUST be shut down while doing that critical step. That defines that step as INTERNAL. But getting the new blade from the store is EXTERNAL. The process or machine could be running while that is going on. When you come across that task that is just too darn dumb to be a needed task…you better check it out. Also focus on what we can do NOW. Time later to consider capital funding for SUTR. Focus first on no/low cost solutions The best setup is no setup! Draft: Version 2

1 Tahapan of SMED 1-Separate internal and external steps SUTR/One Hour-Lean 201 Tahapan of SMED 1-Separate internal and external steps 2-Convert internal to external 3-Streamline all aspects of setup operations. These are the steps listed in the literature as the steps Shingo identified. There is a whole bunch more that is needed! Get a TEAM together; DOCUMENT the set up, ID the individual Operations & Timing and ANALYZE to DETERMINE INTERNAL & EXTERNAL operations. Then FORCE as many as possible from internal to external, consider STREAM-LINING ASAP. It is too easy to make the external longer than the internal. 1 Draft: Version 2

1 - Memisahkan Langkah Internal dan Langkah Eksternal Studi aktual prosedur setup untuk membuat setup worksheet Amati beban kerja teknisi setup dan operator mesin selama proses setup

2 - Pindahkan Langkah Internal ke Langkah Eksternal Pindahkan aktivitas-aktivitas ekternal ke operator, ketika mesin sedang running Pindahkan aktivitas-aktivitas setup pada saat mesin harus mati ke aktivitas eksternal Contoh pada produksi metal casting: temperatur mold harus dinaikkan untuk menghindari kerusakan hasil cetakan (castings). Pemanasan mold dapat dilakukan secara eksternal dengan menggunakan gas atau listrik, sebelum mold dipasangkan ke mesin

3 – Perbaiki dan Sempurnakan Semua Aspek pada Operasi Setup Sederhanakan setup, menuju One Touch Exchange of Dies (OTED) Standardisasikan prosedur setup, hingga operator mesin dapat melakukan setup sendiri

Teknik Mengeliminasi Set-up Kurangi atau eliminasi perbedaan- perbedaan antar part Membuat beberapa jenis part dalam satu langkah Dedikasikan mesin-mesin untuk membuat hanya satu item Tidak ada kebutuhan changeover Mesin tidak mahal dibanding biaya set-up Sedikit jumlah item berbeda yang diproduksi

Teknik-Teknik Mereduksi Setup Memisahkan aktivitas-aktivitas internal dan eksternal: checklists Memperbaiki setup internal Tugas setup paralel Standardisasi baut dan mur Gunakan baut sekali putar (one turn bolt) Gunakan standard-sized holders and pins

Teknik-Teknik Mereduksi Setup Menghilangkan adjustments Memasangkan part dan fixture ke mesin Men-set part dan fixture pada posisi yang tepat Men-set kombinasi yang tepat (speed, pressure, feed rates and temperature) agar part memenuhi spesifikasi. Memperbaiki setup eksternal Storage dekat ke mesin Setup kits and carts Material handling menggunakan rollers untuk menggeser material dan fixture.