IMPLEMENTASI TOTAL PRODUCTIVITY MAINTENANCE (TPM)

Slides:



Advertisements
Presentasi serupa
PROSES PERUBAHAN DAN PENGOPERASIAN TQM
Advertisements

Perancangan Sistem Produksi
AUDIT MANUFAKTUR (MANUFACTURING AUDIT)
Peranan Sistem Terintegrasi Presented by: Purdianta.
Reduksi / Pengurangan Set-Up
Distribusi Probabilitas Weibull
Disusun oleh: Roy khrisman panjaitan (071269)
(LOSS TIME) Kerugian Oleh : Ir. Aulia Ishak, MT.
MATERIAL RESOURCE PLANNING
PERTEMUAN 10 Inventory Models Mata kuliah: D Analisa Bisnis Kuantitatif Tahun: 2010.
MUHAMMAD HAJARUL ASWAD PERTEMUAN ANALISIS KORELASI 2.3. KORELASI PARSIAL 2.4. KORELASI BERGANDA.
PENGANTAR AKUNTANSI MANAJEMEN
Disusun Oleh : Mukhtadin Hasbi (071198)
INDEKS MUSIMAN DAN GERAKAN SIKLIS
DISUSUN OLEH : IPHOV KUMALA SRIWANA
MultiMedia by Stephen M. Peters© 2001 South-Western College Publishing Chapter 9 Production Management Introduction to.
Total Preventive Maintenance (TPM)
Rumah Bersalin “HARAPAN BUNDA”
Bunga sederhana Pertemuan 1.
Materi. Introduction In this discussion the appliaction of maintainability to the design process is addressed. The maintainability design process is similar.
9 Chapter Production Management Introduction to
RumahBersalin “HARAPAN BUNDA
Rumah Bersalin “HARAPAN BUNDA”
Rumah Bersalin “HARAPAN BUNDA”
MODUL 08 – 1/ 18 MODUL 08 PERSEDIAAN (1/3) 1. FUNGSI PERSEDIAAN
9. Software Quality Assurance
9 Chapter Production Management Introduction to
AKUNTANSI MANAJEMEN SOAL KUIS.
AKUNTANSI MANAJEMEN SOAL KUIS.
P-M ANALYSIS Oleh : Ir. Aulia Ishak, MT.
Rumah Bersalin “HARAPAN BUNDA”
BAB X INDEKS MUSIMAN DAN GERAKAN SIKLIS
PERENCANAAN PRODUKSI AGREGAT
Detailed Scheduling.
MANPRO-M13: MUTU PROYEK SISTEM
METODE PENGUKURAN OBJECTIVE MATRIX (OMAX)
Rumah Bersalin “ HARAPAN BUNDA “
TOTAL PRODUCTIVE MAINTENANCE
Detailed Scheduling Lecture 11.
MANAJEMEN PERSEDIAAN.
III. MANAJEMEN KUALITAS
PERENCANAAN PRODUKSI lanjutan.
Anggaran Produksi.
Total Productive Maintenance (TPM)
9 Chapter Production Management Introduction to
Reduksi / Pengurangan Set-Up
Rumah Bersalin “HARAPAN BUNDA”
Rumah Bersalin “HARAPAN BUNDA”
Indeks Musim dan Gerakan Siklis Tugas Mandiri 01 J0682
Pengantar Bisnis 7 Sessi.
Rumah Bersalin “HARAPAN BUNDA”
Rumah Bersalin “HARAPAN BUNDA”
Rumah Bersalin “HARAPAN BUNDA”
DR.IR DIAR FACHMI R CHAIDAR.,MT,CISCP
Manajemen Produksi.
Kriteria.
Disusun Oleh : Mukhtadin Hasbi (071198)
Rumah Bersalin “HARAPAN BUNDA”
Studi Kelayakan Bisnis (Aspek Pasar dan Pemasaran)
PROFIT & LOSS STATEMENT Adrian Dwi PermanaMilydiyanti Amalia SaniLuthfi Firmansyah Dewika HandayaniPinkan Bunga Caesa Hendri AryoTommy Christian Joseph.
THE COST OF QUALITY AND ACCOUNTING FOR PRODUCTION LOSES
ANGGARAN PRODUKSI Mispiyanti, S.E., M.Ak., Ak..
Ir. Erry Rimawan, MBAT Dosen pembimbing Achmad Nur Fauzi Penulis
BAB - 5 PERENCANAAN AGREGAT
Anggaran Produksi.
Perencanaan Teknis dan Sistem produksi
Rekapitulasi SNI Penetapan Tahun April
ZEFRY DARMAWAN JURUSAN TEKNIK INDUSTRI UNIVERSITAS BRAWIJAYA
9 Chapter Production Management Introduction to
Pengolahan grafik dan penambahan gambar
Transcript presentasi:

IMPLEMENTASI TOTAL PRODUCTIVITY MAINTENANCE (TPM) Nazaruddin Nazaruddin

Ada 2 metode pengukuran produktivitas (Sumanth, 1984): 1. Productivity Management; proses manajemen formal yg menyertakan semua tingkatan manajemen dan kartyawan dengan sasaran akahir mengurangi ongkos pabrikasi, distribusi dan penjualan suatu produk/jasa melalui suatu pengintegrasian empat tahap siklus produktivitas (MEPI) 2. Productivity Engineering; terkait dengan disain, pemeliharaan dan pengembangan pengukuran produktivitas, evaluasi, perencanaan, dan sistem peningkatan dalam organisasi pabrikasi dan jasa Kebijakan keuangan UGM

Nakajima (1988); productivity engineering ≈ Total Productivity Maintenance melalui pengukuran Overall Equipments Effectiveness (OEE) W. Mark & M. Nakamura (1997); “ TPM is an activity/partnership between maintennace and production organisations to improve product quality, reduce waste, reduce manufacturing cost, increase equipment availability and improve a company’s overall state of maintenance” Nazaruddin

Calculation of Overall Equipments Six Big Losses Calculation of Overall Equipments Effectiveness Loading time Equipment Failure Loading time MTBF Availability = -------------------------------- MTBF + MTTR + MWT Downtime Losses 2. Setup & Adjustment Net Operating Time Speed Losses 3. Idling & Minor Stoppages (Total Pieces/Operating Time) Performance = ------------------------------------------ Efficiency Theoritical O/T 4. Reduced Speed Valuable Operating Time Defect Losses 5. Defects in Process Processed amount – Defect amount Rate of Quality = --------------------------------------- Products Processed amount 6. Reduced Yield OVERALL EQUIPMENTS EFFECTIVENESS = Availability x Performance Eff x Rate of Quality Nazaruddin

Ket: MTBF : Mean Time Between Failure (expectation of production time between failures) MTTR : Mean Time To Repair (expectation of time to restoration) MWT : Mean Waiting Time (expectation of time for restoration to statr) OVERALL EQUIPMENTS EFFECTIVENESS (OEE) = Availability x Performance x Rate of Quality Avaibility; pengukuran kehandalan mesin yang diukur dari waktu terbuang (downtime loss) pada Saat mesin utama sedang beroperasi, sedangkan Performance Efficiency Mengukur ouput selama waktu yang tersedia (actual cycle time) dibandingkan dengan kapasitas terpasang (theoretical cycle time) dan Quality Rate mengukur tingkat ouput produk bagus dibandingkan dengan jumlah produk gagal Nazaruddin

Nazaruddin Six Big Loss Category OEE Loss Event Equipment failure Down Time Loss Tool failure Unplanned maintenance General breakdown Setup and Adjustment Downt Time Loss Change over falvour or size Material shortages Operator shortages Warm up time Idling & Minor Stoppage Reduced Speed Speed Loss Obstructed product flow Component jams Misfeeds Sensor blocked Delivery blocked Cleaning/checking Rough running Under capacity Under design Equipment wear Operator inefficiency Defects in Process Reduced Yield Quality Loss Scrap Rework In-Process damage In-Process expiration Incorrect assembly Nazaruddin

Contoh Aplikasi: PT. CP merupakan salah satu produsen pakan ternak yang memproduksi makanan ternak untuk ikan. Aliran proses produksi dapat dilihat pada diagram berikut ini. Raw Material Coarse Grinding Dry Mixing Fine Grinding Wet Mixing Finish Goods Packaging Cooling Pelletizing (sinking feed) Finish Goods Packaging cooling Drying Extrution (floating feed) Nazaruddin

Mesin Tipe tahun Kap. Terpasang (t/h) Melayani produk Coarse Grinding A Horisontal 1980 8 S & F 10 Fine Grinding 2 1987 4,5 F Fine Grinding 3 Fine Grinding 4 S Fine Grinding 5 Mixer 1 Ribbon 50 Mixer 2 16 Pellet Mill 1 Double Roller 2.5 Pellet Mill 2 Pellet Mill 3 1990 4 Extruder 1 Screw Press 1997 3 Extruder 2 2002 Nazaruddin

Pellet 1, Kapasitas = 2,5 T/jam Kapasitas pakan tenggelam (sinking) berdasarkan kapasitas Mesin Pellet Mill Kapasitas pakan terapung (floating) berdasarkan kapasitas Mesin Extruder Mesin Pellet 1 Kapasitas = 2.5 T/jam Jam Kerja/hari = 22 Jam Bulan Pellet 1, Kapasitas = 2,5 T/jam H Kerja Jam Tersedia Produksi Prod/hari % Capaian Januari 19 418 1088 57 2.6 104 Februari Maret 26 572 1451 56 101 April 1362 52 2.4 95 Mei 1327 51 2.3 93 Juni 27 594 1441 53 97 Juli 25 550 1334 Agustus 1251 50 91 September 1332 Oktober 17 374 722 42 1.9 77 Nopember 23 506 1020 44 2.0 81 Desember 20 440 1071 54 Total 278 6116 14487 Data produksi tahun 2006 untuk Mesin Pellet 1 adalah sbb: Nazaruddin

Lakukan analisis terhadap TPM Mesin Pellet tersebut (data tambahan) URAIAN Pellet Mill 1 Total Jan Feb Mar Apr Mei jun Jul Agst Sep Okt Nop Des Production (t) 1088 1451 1362 1327 1441 1334 1251 1332 722 1020 1071 14487 Work Day 19 26 27 25 17 23 20 278 Plan Prod. Hours 418 572 594 550 374 506 440 6116 MTBF 338 516 515 460 486 497 488 458 345 5312 MTTR (h) 12 6.4 4.8 6 10.8 2.8 3.5 3 2 26.3 99.6 MWT (h) 21 48.6 70.4 110.1 84.9 125.5 128.2 104.5 53.7 40.1 111.5 58.9 957.4 Operating Time 406 411.6 567.2 566 552 583.2 547.2 546.5 547 372 504 413.7 6016.4 Net Time 385 363 496.8 455.9 467.1 457.7 419 442 493.3 331.9 392.5 354.8 5059 Theoritical C/T (t/h) 2.5 Actual C/T (t/h) 2.6 2.4 2.3 1.9 2.0 Blocked Feed (t) 31.8 14.9 15.4 27.7 38.4 36.3 41.2 20.9 8.6 14.5 16.7 293.4 Rejects (t) 41.8 29.3 41.5 20.8 40.9 32.8 30.2 32.9 34.1 35.7 43.9 413.2 Nazaruddin