Phase III Rapid Prototyping and Demonstration Prototype

Slides:



Advertisements
Presentasi serupa
CHAPTER 7 Pengembangan Sistem
Advertisements

Tahapan information engineering
Pertemuan 7 DSS Development
ANALISIS DAN DESAIN SISTEM Mohamad Sidiq Magister Komputer Universitas Dian Nuswantoro 2a2a SYSTEM ANALYSIS P E R T E M U A N.
ARTIFICIAL INTELLIGENCE
Teknologi Informasi ~ Sistem Informasi ~
Kuliah Sistem Pakar Pertemuan VIII “PENGEMBANGAN SISTEM PAKAR”
Managing Software Requirements (manajemen kebutuhan perangkat lunak)
Strategi Pengembangan SIA
Chapter 5: Manajemen Scope Proyek
Kelompok 1 Mochammad. Nasir Mochammad. Nasir Isommuddin Isommuddin T. Yusak D
PROJECT FRAMEWORK Pertemuan-14 Mata Kuliah: CSM-211, Management Support System Tahun Akademik : 2012 / 2013 Sasaran Pembelajaran The student can make design.
Pertemuan 11 Akuisisi Pengetahuan
Manajemen Proyek Perangkat Lunak (MPPL)
MODEL PROSES REKAYASA PERANGKAT LUNAK
SIKLUS PENGEMBANGAN SISTEM INFORMASI Addr : : Contact No :
1 Pertemuan 02 Pemilihan Sistem Matakuliah: M0086/Analisis dan Perancangan Sistem Informasi Tahun: 2005 Versi: 5.
Metodologi (metodologies) adalah suatu cara yang disarankan untuk melakukan suatu hal Siklus Hidup Sistem (system life cycles) adalah suatu penerapan pendekatan.
Kuliah Sistem Pakar Pertemuan III “Sistem Pakar”
Tujuan : Mahasiswa dapat Mengidentifikasi pengertian dasar pengembangan sistem melalui SDLC.
1 INTRODUCTION Pertemuan 1 s.d 2 Matakuliah: A0554/Analisa dan Perancangan Sistem Informasi Akuntansi Tahun: 2006.
PENGANTAR SISTEM PAKAR (EXPERT SYSTEM)
Kuliah 4 : Spesifikasi Produk (Product Specification)
Systems Development Life Cycle
SE2423 Rekayasa Perangkat Lunak
PENGEMBANGAN APLIKASI
ANALISA SISTEM ( ANALYSIS SYSTEM )
System Development Life Cycle (SDLC)
Pert. 16. Menyimak lingkungan IS/IT saat ini
System Development Part 1
System Life Cycle Nurhayati, S.Kom., M.Kom Dosen STMIK Kaputama 1.
MEMBANGUN SISTEM PAKAR
Tahun : <<2005>> Versi : <<1/1i>>
Systems Life Cycle.
REKAYASA PERANGKAT LUNAK
Siklus Hidup Perangkat Lunak
PENGEMBANGAN SISTEM Alasan & Tujuan Pengembangan Sistem
Testing dan Implementasi
Perancangan Basis Data
Materi Habis Uts IMK Prototyping
MERENCANAKAN PELATIHAN
Pertemuan 17 Aplication Domain
Software Development Life Cycle (SDLC) Concept
ADBO (Analisa Desain Berorientasi Obyek)
SDLC (System Development Life Cycle)
Rekayasa Pengetahuan (Knowledge Engineering)
ANALISIS DAN PERANCANGAN SISTEM
REKAYASA PERANGKAT LUNAK
Review Rekayasa Perangkat Lunak
Siklus Hidup Pengembangan Sistem (System Development Life Cycle)
Phase III Rapid Prototyping and Demonstration Prototype
PENGEMBANGAN PERANGKAT LUNAK
SYSTEMS INVESTIGATION Pertemuan 3 s.d 6
Dasar-Dasar Sistem Informasi
Akuisisi dan Rekayasa Pengetahuan
Review Rekayasa Perangkat Lunak
PROJECT FRAMEWORK Pertemuan-13
Pengantar IT Project.
Review Rekayasa Perangkat Lunak
Rekayasa Pengetahuan (Knowledge Engineering)
System Development Life Cycle
Rekayasa Perangkat Lunak
ANALISA SISTEM ( ANALYSIS SYSTEM )
Sistem Pendukung Keputusan Roni Andarsyah, ST., M.Kom Lecture Series.
Analisis Perencangan Sistem Informasi
ANALISA SISTEM ( ANALYSIS SYSTEM )
Systems Development Life Cycle
Pertemuan 1 Pengantar Pengembangan Sistem
Konsep Aplikasi Data Mining
Building Information Systems
Transcript presentasi:

Kuliah Sistem Pakar Pertemuan X Tahap III, IV Prototyping dan Pengembangan Sistem

Phase III Rapid Prototyping and Demonstration Prototype Prototyping, suatu proses untuk menghasilkan suatu prototipe Prototype, ide bagi pembuat maupun pengguna (potensial) tentang cara suatu sistem akan berfungsi dalam bentuk lengkap dan bagaimana sistem nantinya akan dikembangkan maupun diperbaiki

Rapid Prototyping and a Demonstration Prototype Build a small prototype Test, improve, expand Demonstrate and analyze feasibility Complete design

Rapid Prototyping Crucial to ES development Small-scale system Includes knowledge representation Small number of rules For proof of concept

Rapid Prototyping Process Refinement dari Pengembangan Sistem Rancangan Prototype Akuisisi Pengetahuan dan Representasi Testing, Studi Kasus Evaluasi, Pakar, Sumbang Saran Pengguna Analisis Hasil Perlu Perbaikan ? Start Akhir Prototyping Ya Tidak

Prototyping: ES Development Life Cycle (PADI) Planning Analysis Design Implementation Prototype

Keuntungan dan Daya Tarik Prototipe Memperoleh gambaran Sistem Memperoleh gambaran Perbaikan/Perawatan Memperoleh gambaran ide, Hardware, Software serta Network (optional) Memperkenalkan dan menjual Sistem pada calon “user” yang skeptis. Mendemonstrasikan Sistem (sederhana)

Keuntungan dan Daya Tarik (lanjutan) Terjadi komunikasi yang baik antara sistem “perancang” dengan user Perancang dapat bekerja lebih baik dalam menentukan kebutuhan user User berperan lebih aktif dalam pengembangan sistem Aplikasi sistem lebih mudah karena keterlibatan user secara aktif, sehingga user mengetahui apa yang diharapkan.

Phase IV Pengembangan Sistem Develop the knowledge base Define the potential solutions Define the input facts Develop an outline Draw a decision tree Create a knowledge map Create the knowledge base Test, evaluate, and improve (knowledge base) Plan for integration

Development and Maintenance of Expert Systems Problem Identification and Feasibility Analysis The problem must be suitable for an expert to solve it. Find an expert for the project Cost effectiveness must be established 2. System Design and Expert System Technology Identification The system is designed with integration other subsytems and databases Domain knowledge Knowledge and inferencing is established with simple cases 3. Development of Prototype Knowledge Engineer works with the expert Specific Tool is chosen for the project

Development and Maintenance of Expert Systems (Continued) 4. Testing and Refinement of Prototype Test with simple cases Deficiencies in performance are noted. End users test the prototypes. 5. Complete and Field the Expert System The interaction with the environment,, users, and other information systems is tested Documented User training 6. Maintain the System The system is kept current by updating the knowledge base Interfaces with other information systems are maintained

Development and Maintenance of Expert Systems (Continued) 4. Testing and Refinement of Prototype Test with simple cases Deficiencies in performance are noted. End users test the prototypes. 5. Complete and Field the Expert System The interaction with the environment, users, and other information systems is tested Documented User training 6. Maintain the System The system is kept current by updating the KB Interfaces with other information systems are maintained

Development & Maintenance of ESs This slide corresponds to Figure 11.7 on p. 404 and relates to the material on pp. 403-405. Problem Identification and Feasibility Analysis System Design and ES Technology Identification Development of Prototype Figure 11.7 illustrates an interactive process of ES development and maintenance. The steps of the methodology include: 1. Problem Identification & Feasibility Analysis - the problem has to be suitable for an ES to solve. Along with determining whether an ES is appropriate, system developers must find an expert for the project. At this stage, a subset of ES functionality that will go into the initial prototype should also be identified. The cost-effectiveness of the system has to be estimated by establishing the approximate number of rules and determining the cost per rule. 2. System Design and ES Technology Identification - at this stage, the system is actually being designed. In particular, the needed degree of interaction with other subsystems and databases is established. Concepts that best represent the domain knowledge are worked out. 3. Development of Prototype - using the knowledge-acquisition facility, the knowledge engineer works with the expert to place the initial kernel of knowledge in the knowledge base. 4. Testing & Refinement of Prototype - using sample cases, the prototype is tested, and deficiencies in performance are noted. 5. Complete and Field the ES - the interaction of the ES with all elements of its environment, including users and other information systems, is ensured and tested. A suite of test cases is run to validate the ES and stored to validate future modifications. ES is documented and user training is conducted. 6. Maintain the System - the system is kept current primarily by updating its knowledge base. Testing and Refinement of Prototype Yes Is the Performance Satisfactory? Complete and Field the ES No ES Ready for Use Maintain ES 7 7

Development Team ES Software

Roles in Expert System Development Knowledge Knowledge Engineer Knowledge acquisition tactics include interviews, protocol analysis, observation, and analysis of cases Must select a tool with the application of the knowledge acquisition facility User End user with a simple shell Prototypes are used

Persyaratan Sistem Pakar yang Baik (Pertemuan 10/06 -) Dikembangkan untuk menjawab kebutuhan Kecepatan pemrosesan tinggi Menambah kepakaran “user” Mudah diperbaiki Dapat menjawab pertanyaan sederhana Dapat bertanya untuk mendapat info tambahan Mudah diubah Pengguna harus merasa menguasai SP Tidak sulit bagi pengguna pemula Kebutuhan input harus jelas dan sederhana

Sampai Jumpa di Pertemuan XI Selamat Belajar, Semoga Sukses