Upload presentasi
Presentasi sedang didownload. Silahkan tunggu
Diterbitkan olehFuji Fitri Telah diubah "10 tahun yang lalu
1
Ronnie Rivany ® Health & Hospital Economist
Perencanaan Pembangunan AL RAHMAN SUBANG INTERNATIONAL HOSPITAL 2013/2014 Ronnie Rivany ® Health & Hospital Economist
2
KARAKTERISTIK INDUSTRI KESEHATAN
3
KONSEP DASAR Ronnie Rivany ® Health & Hospital Economist
4
DEVELOPMENT FEASIBILITY STUDY
ANALYSIS OF EXTERNAL ASPECT DEMOGRAPHICS GEOGRAPHICS COMPETITOR…etc ANALYSIS OF HEALTH ASPECT EPIDEMIOLOGY MAN POWER FACILITIES. .etc No of beds, no of specialists STRATEGIC BUSINESS UNIT Total amount in $, Budgeting Break Even Point ???? Feasible or not ??????
5
Grafik Perkembangan Cash Flow Alternatif
Prediksi BEP dicapai pada tahun ke-10
6
JENIS LAYANAN
7
LAYANAN PENUNJANG
8
MASTER PLAN + BLOCK PLAN
HEALTH SERVICES LOCATION IN PATIENT OUT PATIENT SUPPORTING PATIENT FLOW ZONING SITE PLAN BIRD EYE VIEW MODEL ON SCALE 1:100 etc
9
Master Plan RSUD BARI PALEMBANG
A POLIKLINIK (3LT) B UGD C CAFÉ D RADIOLOGI, FARMASI, LAB, INSTALASI PENUNJANG DIAGNOSTIK, BANK DARAH E REKAM MEDIS F ADMINISTRASI G BEDAH SENTRAL H R KEBIDANAN DAN KANDUNGAN I HEMODIALISA, CSSD, REHAB MEDIK, ANESTESI, PATOLOGI ( 2LT) J ICCU K ICU L RWT INAP KELAS 1 (2 LT) M RWT INAP KLS (2 LT) N RWT INAP KELAS 3 O RWT INAP VIP P RWT INAP VVIP Q DAPUR R LAUNDRY S WORK SHOP T GENSET U IPAL DAN INSENERATOR V JENAZAH W TPS X MESJID Y GSG Z KANTIN 1 PERPUSTAKAAN 2 KELAS ( 2 LT ) 3 RUMAH DOKTER 4 ASRAMA ( 3 LT ) Contoh Master Plan RSUD BARI PALEMBANG X C Y B A I E H D Z G K 1 F 2 J 3 L 2 N O 3 P 2 M O 4 T S R Q U 4 V W
10
Contoh Master Plan RSUD BARI PALEMBANG
11
Contoh Master Plan Pengembangan RSUD KUNINGAN
12
DED (Detail Enginering Design)
DRAWING PLANNING PREPARATION SYSTEMATICAL PLANNING ON BUILDING CONSTRUCTION DESIGN DEVELOPMENT EXTERNAL INTERNAL MATERIAL SPECIFICATION PREPARATION ON BIDDING ADMINISTRATION
13
TAMPAK MUKA
14
INTERIOR LORONG
15
INTERIOR ADMISI & R.DOKTER
16
DENAH RAWAT INAP
17
AMDAL STUDY WATER & WASTE TREATMENT ANALYSIS ENVIRONMENT ANALYSIS
HIDROGRAPHY & LITHOGRAPHY STRUCTURE ANALYSIS SOCIO-CULTURE ANALYSIS
18
BUILDING CONSTRUCTION
FIRST PHASE COSTRUCTION OUT PATIENS POLYCLINIC EMERGENCY ONEDAY CARE/SURGERY FARMACYS BACK OFFICE/ADMINISTRATION LAN/PAPERLESS INFORMATION SYSTEM SECOND PHASE COSTRUCTION IN PATIENT SUPPORTING SERVICES MRI CAT-SCANN 3D-COLOR USG MAIN OPERATING THEATRE/SURGERY THIRD PHASE CONSTRUCTION SPORT/RECREATION FACILITIES HOSPITAL MALL FLOURISH SHOPS BOOKSTORE DRUGSTORE RESTO / CAFE SPA DUTY FREE SHOPS
19
TAMPAK existing (1)
20
TAMPAK existing (2)
21
MANAGEMENT CONSTRUCTION
PROGRAM PROJECT DEVELOPMENT QUANTITY & QUALITY ASSURANCE BUILDING CONSTRUCTION EVALUATION EQUIPMENT INSTALATION EVALUATION PROGRAM / BUILDING CONSTRUCTION MONITORING PROGRESS REPORT
22
EQUIPMENT INSTALLATION
MEDICAL NON MEDICAL TIME SCHEDULING / MONITORING EQUIPMENT SPECIFICATION ASSURANCE INSTALLATION & OPERATING EQUIPMENT
23
KAMAR OPERASI & Ro “MINOR”
24
KAMAR OPERASI “ MAYOR”
25
INTERIOR RAWAT INAP
26
HOSPITAL MANAGEMENT STRATEGIC MANAGEMENT JOB DESC ANALYSIS
SISTEM OPERATING PROCEDURE MANPOWER RECRUITMENT MANPOWER TRAINING LOGISTIC MANAGEMENT HUMAN RESOURCES MANAGEMENT MANAGEMENT INFORMATION SYSTEM NURSING MANAGEMENT FINANCING MANAGEMENT PRICING CAPITATION SYSTEM PUBLIC-PRIVATE MIX
27
SOFT OPENING TRIAL AND ERROR MONITORING CONTROLLING EVALUATION
CORRECTING
28
Costing Analysis Data Up-date 2013/2014 Activities Pathway
Unit cost assessment of each activities Total Cost Suggest best policy options according to the result
29
DRAFT RINCIAN ANGGARAN KEBUTUHAN
TAHAPAN KEGIATAN Unit cost BIAYA TOTAL BIAYA Up-date FS, MP, AMDAL Paket Rp Up-date Detail Engineering Design + Interior Design 2% NILAI KONSTRUKSI Rp Up-date Konstruksi / finishing … Manajemen Konstruksi 3% NILAI KONSTRUKSI Inst.alat medis & non Tim Konsultan Hospital Management 28 Soft opening. 12 Operasional RS / Modal kerja 5 thn 5 x 12 T O T A L Rp ( + dlll)
30
TAHAPAN BIAYA & WAKTU 4 BLN 5 BLN 8-10 BLN 12 BLN 60 BLN T O T A L
TAHAPAN KEGIATAN 4 BLN 5 BLN 8-10 BLN 12 BLN 60 BLN Up-date FS, MP, AMDAL X Up-date Detail Engineering Design + Interior Design Up-date Konstruksi / finishing Mekanikal+Elektrikal Current assets Tanah + Bangunan Manajemen Konstruksi Inst.alat medis & non Tim Konsultan Hospital Management Soft opening. Operasional RS / Modal kerja 5 thn T O T A L
31
Manajemen Proyek RS INVESTOR ??????? PEMILIK KONSULTAN
32
TERIMA KASIH
Presentasi serupa
© 2024 SlidePlayer.info Inc.
All rights reserved.