KESIAPAN AT2LT AP2B KALIMANTAN BARAT 21 Februari 2017 Faizal Helmi
PROSES BISNIS TRANSAKSI ENERGI AP2B KALBAR
PROSES BISNIS AP2B KALBAR PEMBANGKIT TRANSMISI DISTRIBUSI PLN SEKTOR KAPUAS PEMBANGKIT RENTAL PLN BATAM (MPP) SESCO AP2B KALBAR AREA PONTIANAK AREA SINGKAWANG TERIMA DARI DISALURKAN KE
TITIK TRANSAKSI
TITIK TRANSAKSI TITIK TRANSAKSI JUMLAH PEMBANGKIT PLN SEKTOR KAPUAS 20 PEMBANGKIT RENTAL 15 PLN BATAM 2 SESCO PS PEMBANGKIT 10 1 DISTRIBUSI AREA PONTIANAK 68 AREA SINGKAWANG TOTAL TITIK TRANSAKSI 138
KESIAPAN SISTEM AMR
KWH METER AMR KWH METER PEMBANGKIT DAN DISTRIBUSI SUDAH MENGGUNAKAN 100% AMR 100 %
REMOTE AMR KWH METER PEMBANGKIT DAN DISTRIBUSI 88,5% DAPAT DIREMOTE 88,5 %
TOPOLOGI SISTEM AMR
WEBSITE AP2B-KALBAR (STAND KWH METER)
WEBSITE AP2B-KALBAR (PRODUKSI PEMBANGKIT)
WEBSITE AP2B-KALBAR (PENYALURAN KE DISTRIBUSI)
WEBSITE AP2B-KALBAR (LOSSES TRANSMISI)
WEBSITE AP2B-KALBAR (LOAD PROFILE KWH)
WEBSITE AP2B-KALBAR (BEBAN PEMBANGKIT)