ROT and AROT Method Week #5.

Slides:



Advertisements
Presentasi serupa
INVENTORY (Manajemen Persediaan)
Advertisements

Model Persediaan Deterministik (Deterministic Inventory)
MANUFACTURING PLANNING & CONTROL (MPC)
BILL OF MATERIAL samsulb.
MATERIAL REQUIREMENT PLANNING
INVENTORY (Manajemen Persediaan)
Input-Output Control (Pengendalian Produksi)
5. Material Requirement Planning 1 ( MRP )
KETIDAKPASTIAN DALAM MENGELOLA SUPPLY CHAIN: SAFETY INVENTORY
Master production Schedule (MPS)
Perencanaan Kebutuhan Material (Material Requirement Planning)
INVENTORY (Manajemen Persediaan)
Roesfiansjah Rasjidin Program Studi Teknik Industri Fakultas Teknik – Univ. Esa Unggul.
Materials Requirements Planning
PERTEMUAN 10 Inventory Models Mata kuliah: D Analisa Bisnis Kuantitatif Tahun: 2010.
PRODUCTION PLANNING PROCESSES
Inventory Management I. Definitions Inventory-A physical resource that a firm holds in stock with the intent of selling it or transforming it into a more.
PERENCANAAN KEBUTUHAN MATERIAL (MATERIAL REQUIREMENT PLANNING)
PERSEDIAAN ( INVENTORY )
PERENCANAAN KEBUTUHAN MATERIAL (MRP)
TI-3122 Perencanaan dan Pengendalian Produksi Perencanaan Disagregat
Perencanaan Kapasitas
INVENTORY (Manajemen Persediaan) By: Andri Irawan S.Pd
SISTEM PRODUKSI TARIK (PULL PRODUCTION SYSTEMS)
Manajemen Produksi dan Operasi
Model Persediaan Deterministik (Deterministic Inventory)
MATERIAL REQUIREMET PLANNING
Pertemuan 9 Pengawasan Persediaan
SETTING STANDARDS AND ANALYZING VARIANCES
Inventory System Simulation Pemodelan Sistem. Kapan saat yang tepat untuk meng- order? Berapa banyak yang perlu di-order? Inventory Systems.
MANAJEMEN INVENTORY DAN LOGISTIK
MANAJEMEN INVENTORY DAN LOGISTIK
MATERIAL REQIREMENT PLANNING
Operation Plan II.
Definisi Fungsi Aplikasi Contoh Jadwal Induk Produksi
Depreciation, Impairments, Depletion
Material Requirements Planning
Model Pengendalian Persediaan
BAB 4 PERENCANAAN KAPASITAS DAN AGREGAT
PERENCANAAN KAPASITAS DAN AGREGAT
MODUL 11 – 1/ 20 MODUL 11 MATERIAL REQUIREMENT PLANNING (MRP) (1/2)
SUPPLY CHAIN MANAGEMENT (SCM)
UNIVERSITAS MERCUBUANA JAKARTA 2012
Production Planning and Inventory Control
Material Requirement Process
MODUL 07 – 1/ 16 MODUL 07 MASTER PRODUCTION SCHEDULING
PERENCANAAN KEBUTUHAN MATERIAL (MRP)
Material Requirement Process
MANAJEMEN INVENTORY DAN LOGISTIK MODUL 11 PERENCANAAN KEBUTUHAN BARANG
ECONOMIC ORDER QUANTITY
PERENCANAAN PRODUKSI AGREGAT
MATERIAL REQUIREMENT PLANNING
MASTER PRODUCTION SCHEDULE (MPS/JIP)
PERENCANAAN KEBUTUHAN MATERIAL (MRP)
MODUL : 12 MANAJEMEN PERSEDIAAN INVENTORY MANAGEMENT
Manajemen Inventory 8-9 Dani Leonidas S ,ST.MT.
PERENCANAAN KEBUTUHAN MATERIAL
Pengantar Bisnis 7 Sessi.
XI. PERENCANAAN KAPASITAS DAN PERENCANAAN RODUKSI AGREGAT
Disusun Oleh : Iphov Kumala Sriwana
PRODUCTION AND SUPPLY CHAIN MANAGEMENT INFORMATION SYSTEM
Production Planning and Inventory Control
STRATEGI PERENCANAAN KAPASITAS PRODUKSI (AGREGAT)
MANAJEMEN PERSEDIAAN (INVENTORY MANAGEMENT)
PENGENDALIAN LANTAI PABRIK (SHOP FLOOR CONTROL-SFC)
Systems Design: Job-Order costing
PERENCANAAN KEBUTUHAN MATERIAL (MRP)
Production Planning and Inventory Control
MATERIAL REQUIREMENTS PLANNING (MRP) OLEH: ARIS ROYANDA NIM:
Model Persediaan Khusus
Transcript presentasi:

ROT and AROT Method Week #5

Runout Time (ROT) Sebuah metode untuk menentukan urutan produksi untuk grup-item yang diproduksi pada alat yang sama.

Runout Time (ROT) Method Item Standard Hours per Unit Production Lot Size (units) Demand forecast per period (unit/week) Current inventory position (units) Standard Hours per Lot Size (col. 2)(col. 3) A 0.1 100 35 10 B 0.2 150 50 120 30 C 0.3 40 130 D 200 60 Total 110 Lakukan scheduling untuk urutan produksi dari ke-4 item produk diatas dengan menggunakan aturan ROT. Jika kapasitas produksi yang tersedia 90 jam per minggu, apakah kapasitas produksi ini cukup?

Current Inventory Position (units) Demand per period (units/week) Item Current Inventory Position (units) Demand per period (units/week) ROT (weeks) (col. 2)/(col.3) Sequence A 100 35 2.86 3 B 120 50 2.40 2 C 130 40 3.25 4 D 60 1.67 1 Sequence ROT (weeks) Lot Size (units) Machine hours per lot size Remaining capaity (hours) D 1.67 200 40 50 B 2.40 150 30 20 A 2.86 100 10 C 3.25 -20

Aggregate runout time (AROT) Metode penjadwalan yang digunakan untuk grup-item untuk menghindari kekurangan (shortage)

Item Standard Hours per Unit Demand forecast per period (unit/week) Machine hours for demand forecast (col.2)(col.3) Corrent inventory position (units) Inventory machine hours (col.2)(col.5) A 0.1 35 3.5 100 10 B 0.2 50 120 24 C 0.3 40 12 130 39 D 60 20 Total 37.5 93 AROT = (total inventory in machine hours + total machine hours available) / total machine hours forecasted per period = (93 + 90)/37.5 = 4.88 weeks

Demand forecast per period (unit/week) AROT (weeks) Item Demand forecast per period (unit/week) AROT (weeks) Gross Requirements (units) (col.2)(col.3) Current inventory position (units) Lot size (units) (col.4) – (col.5) A 35 4.88 171 100 71 B 50 244 120 124 C 40 195 130 65 D 60 293 193 Total Item Standard Hours per Unit Lot size (units) Machine hours required (col.2)(col.3) Remaining capaity (hours) A 0.1 71 7.1 82.9 B 0.2 124 24.8 58.1 C 0.3 65 19.5 38.6 D 193 Total