Activity Based Management

Slides:



Advertisements
Presentasi serupa
Konsep Statement of Cash Flow dengan Menggunakan Metode Direct
Advertisements

SOCIAL MEDIA Widianto Nugroho, S.Sn. |
Aspek Sosial & Organisasi Restyandito, S.Kom, MSIS.
INTERNET & E-COMMERCE Internet Marketing & eMarketing
Hadi Syahrial (Health IT Security Forum)
TRIP GENERATION.
© 2009 Fakultas Teknologi Informasi Universitas Budi Luhur Jl. Ciledug Raya Petukangan Utara Jakarta Selatan Website:
IT SEBAGAI ALAT UNTUK MENCIPTAKAN KEUNGGULAN KOMPETISI
IT Project Management Based on PMBOK
 N YU Stern Finance Professor, Edward Altman, developed the Altman Z-score formula in In 2012, he released an updated version called the Altman.
PERULANGANPERULANGAN. 2 Flow of Control Flow of Control refers to the order that the computer processes the statements in a program. –Sequentially; baris.
Slide 3-1 Elmasri and Navathe, Fundamentals of Database Systems, Fourth Edition Revised by IB & SAM, Fasilkom UI, 2005 Exercises Apa saja komponen utama.
From Good to Sound Governance
Aplikasi Teknologi Informasi Dalam Pendidikan Bahan Kuliah Program Studi Manajemen Pendidikan-S2 Program Pascasarjana Universitas Ahmad Dahlan Dosen: Drs.
Review IS & Software System Concept Diah Priharsari PTIIK – Universitas Brawijaya Source: 1.Obrien & Marakas, Management Information.
Introduction to The Design & Analysis of Algorithms
MATERI 6 PERILAKU ORGANISASI
1 KOMPONEN PERUMUSAN PROGRAM KOMUNIKASI 1.Assesment - Focus the target audience 2.Planning - Target audience - Key of consumer benefit - Believe of the.
KNOWLEDGE MANAGEMENT: philosophy, processes, and pitfalls EXTRACTED FROM Soo, Devinney, Midgley, Deering (2002) CALIFORNIA MANAGEMENT REVIEW, 44 (4) 1seri.
PROSES PADA WINDOWS Pratikum SO. Introduksi Proses 1.Program yang sedang dalam keadaan dieksekusi. 2.Unit kerja terkecil yang secara individu memiliki.
Dr. Djoko Agus Purwanto, Apt. MSi
INTERNASIONALISASI UMY STRATEGI dan ORGANISASI
Review Operasi Matriks
Chapter 2 ADVANCED MANAGEMENT ACCOUNTING
Ch. 7 TECHLOGY INTELLIGENCE. (T) Technical Intelligence Market Intelligence (M)
Ekonomi Manajerial dalam Perekonomian Global
Hakiki Mahfuzh HOW TO CREATE QUALITY IN EDUCATION.
Pengantar/pengenalan (Introduction)
Green Productivity Prof. Ir. Moses L. Singgih, MSc, PhD
How human charactersitics, practitioners’ habits and health care system regulations affet the research and development of medical devices.
1 Certified Assessor Training Galeri 678 Kemang, 26 – 28 Agustus 2008 Materi Kuliah Program Magister Psikologi Unika Atmajaya Agustus 2009 Disusun oleh.
Implementing Systems for Measuring Intangible Assets Several case studies Reported the results publicly General guidelines for creating a measurement system.
Ruang Lingkup Bisnis Dr. Mohammad Abdul Mukhyi. SE., MM
Implementing an REA Model in a Relational Database
Oleh: Dr. Sri Widati,S.Sos.,M.Si
MEMORY Bhakti Yudho Suprapto,MT. berfungsi untuk memuat program dan juga sebagai tempat untuk menampung hasil proses bersifat volatile yang berarti bahwa.
3 nd Meeting Chemical Analysis Steps and issues STEPS IN CHEMICAL ANALYSIS 1. Sampling 2. Preparation 3. Testing/Measurement 4. Data analysis 2. Error.
BAB 05 KINERJA PEMASARAN.
1 Magister Teknik Perencanaan Universitas Tarumanagara General View On Graduate Program Urban & Real Estate Development (February 2009) Dr.-Ing. Jo Santoso.
Roundtable discussion on citizen engagement for good governance in East Indonesia diskusi keterlibatan penduduk untuk tata pemerintahan yang baik di Indonesia.
Activity – Based Management 31/10/2009Akuntansi Manajemen Lanjutan.
TUGAS AKHIR VISUAL COMMUNICATION DESIGN
LOGO Manajemen Data Berdasarkan Komputer dengan Sistem Database.
Organizing for Innovation Ch 13. Focus this chapter on: The methods by which firms organize for innovation.
Linked List dan Double Linked List
Human Resource Management MSDM strategis M-2 1Tony Soebijono.
MODELS OF PR SYIFA SA. Grunig's Four models of Public Relations Model Name Type of Communica tion Model Characteristics Press agentry/ publicity model.
Patdono Suwignjo.  UU NO 9 TAHUN 2009 TENTANG BHP DIBATALKAN OLEH MAHKAMAH KONSTITUSI  KEBIJAKAN TENTANG “UN-BUNDLING” TENAGA LISTRIK DIBATALKAN OLEH.
3.1 © 2007 by Prentice Hall OVERVIEW Information Systems, Organizations, and Strategy.
MANPRO-M13: MUTU PROYEK SISTEM
THE IMMERSED TUNNELS MAIN BENEFITS AND INNOVATION BY. WAWAN SETIAWAN.
THE EFFICIENT MARKETS HYPOTHESIS AND CAPITAL ASSET PRICING MODEL
Situasi Terkini tentang Penelitian dan Pelaksanaan Test danTreat di 28 Oktober 2014 Lecture Series Pusat Penelitian HIV dan AIDS.
1. 2 Work is defined to be the product of the magnitude of the displacement times the component of the force parallel to the displacement W = F ║ d F.
1 Business Function 18/07/ Business Cycle and Process BUSINESS CYCLE BUSINESS FUNCTION BUSINESS LEVEL 18/07/2002.
MARKETING MIX (BAURAN PEMASARAN).
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Pengalamatan Jaringan – IPv4 Dosen Pengampu: Resi Utami Putri, S.Kom.,
Mengapa Strategi Gagal Diterapkan?
SWOT ANALYSIS Kapita Selekta UC Korporasi Cus Korporasi Faktor / Nature Resources Resources + Customer Are limited.
FISIKA DASAR By: Mohammad Faizun, S.T., M.Eng. Head of Manufacture System Laboratory Mechanical Engineering Department Universitas Islam Indonesia.
Welcome to INTERNATIONAL ACCOUNTING Abdullah Taman, S.E., M.Si., Akuntan Prodi Akuntansi, FISE Universitas Negeri Yogyakarta.
Slide 1 Chapter 1: Introduction to Systems Analysis and Design Alan Dennis, Barbara Wixom, and David Tegarden John Wiley & Sons, Inc.
MICROSOFT EXCEL 2000 Bagian #4 GRAPHICS : OBJECT & CHART.
Chapter 6 – International Opportunities
ENTREPRENEURSHIP Lecture No: 44 BY CH. SHAHZAD ANSAR
HRD in Small and Medium-sized Enterprises (SMEs)
ForumPass Familiarization
Content Marketing Template
NURS 737: Nursing Informatics Concepts and Practice in System Adoption
North Dakota Department of Public Instruction (ND DPI)
Transcript presentasi:

Activity Based Management

Activity-Based Management Activity-based costing establishes relationships between overhead costs and activities so that we can better allocate overhead costs. Activity-based management focuses on managing activities to reduce costs. Activity-based costing establishes relationships between overhead costs and activities so that we can better allocate overhead costs. Activity-based management focuses on managing activities to reduce costs. (LO8)

ABM PROFILE ABM = COST DIMENSIONAL + PROCESS DIMENSION ABC + PVA Accurate Cost + Reduce Cost Assignment Customer Satisfaction + Profit

Two-Dimensions of Activity-Based Management Resource costs Cost Assignment View Driver Analysis Process View Activity Analysis Performance Measures Activity Evaluation Activities The horizontal element of the model is the process view of an ABC system. The emphasis now is on the activities themselves, the various processes by which work is accomplished in the organization. The left-hand side is the activity analysis. This is the identification and description of the activities conducted in the enterprise. Activity analysis also identifies the root causes of activities, the events that trigger activities, and the linkages among activities. The right-hand side is the evaluation of activities through performance measures. It is these processes of activity analysis and evaluation that comprise activity-based management. (LO8) Cost Objects REDUCE COST AND IMPROVE PROFIT

Elimination of Non-Value-Added Costs Activities Nonvalue-added activities An important goal of activity-based management is to identify and eliminate nonvalue-added activities and costs. Non-value-added activities are operations that are either (1) unnecessary and dispensable or (2) necessary, but inefficient and improvable. Non-value-added costs, which result from such activities, are the costs of activities that can be eliminated without deterioration of product quality, performance, or perceived value. (LO8) Unnecessary Necessary Reduce or Eliminate Continually Evaluate and Improve

Implementing ABM 4. (continued on next slide)

Implementing ABM 4. (continued from previous slide)

Systems planning 4. Systems planning provides the justification for implementing ABM and address the following issues: The purpose and objectives of the ABM system. The organization’s current and desired competitive position. The organization’s business processes and product mix. The timeline, assigned responsibilities, and resources required for implementation. The ability of the organization to implement, learn, and use new information.

Identifikasi, definisi, dan klasifikasi aktivitas Digunakan untuk mengetahui pekerjaan apa saja yang membentuk suatu aktivitas untuk meningkatkan efisiensi aktivitas yang bernilai tambah. Klasifikasi Digunakan untuk menghubungkan ABM dengan berbagai usaha perbaikan berkelanjutan. Identifikasi Digunakan manajemen perusahaan untuk memusatkan perhatian pada berbagai aktivitas yang tidak bernilai tambah.

Failure of ABM implementation Kurangnya dukungan manajemen tingkat atas (Lack of support ). Manajer operasional dan penjualan tidak ahli menggunakan informasi aktivitas yang baru (incapability of operational managers). Kurangnya kegiatan pelatihan dan pendidikan tentang penggunaan informasi ABM (lack of training). Para manajer menerima informasi baru dengan sikap skeptis (sceptical attitude) . Para manajer cenderung menggunakan angka akuntansi tradisional bersama dengan data baru tersebut (tend to use traditional system in the lieu of new system).

ABM NEEDS RESPONSIBILITY ACCOUNTING 4 ELEMENTS OF RA: Assigning responsibility Establishing performance criteria Evaluating performance Assigning rewards

Types of RA Financial Based Low competition, standardized product/activities, mass production, low IT adoption Activities Based High competition, unstandardized product/activities, order production / mass customization, high IT adoption Strategy Based (Chapter 16)

1. Assigning responsibility

2. Establishing performance criteria

3. Evaluating performance

4. Assigning Rewards

Process Value Analysis (PVA) Process dimension -> reduction cost Elements of PVA: Driver analysis (what causes activities cost) Act input (resources consumed) Act output (product resulted) Activity analysis (determining VA + NVA activities to reduce cost) elimination, selection, reduction, uniting activities 3. Activity performance measurement

Process Value Analysis constant improvement, including cost reduction through activity management Activity elimination Focus on eliminating nonvalue-added activities Activity selection Choose among sets of competing strategies Activity reduction Decrease time and resources required by an activity Activity sharing / uniting activities Use economies of scale to increase efficiency

Assessing activity performance Financial measures Nonfinancial measures Dimensions of performance assessment Efficiency (Output : Input) Quality (durability, function, etc.) Time (speedier means less resources consumption)

Financial Measures of Activity Efficiency Reveal the current level of efficiency and the potential for increased efficiency Value- and nonvalue-added activity costs Trends in activity costs Kaizen standard setting Benchmarking Activity flexible budgeting Activity capacity management

1. Value- and nonvalue-added activity costs

Contoh Aktivitas di RTP Inc. penggerak aktivitas SQ AQ SP Pengelasan jam pengelasan 10.000 12.000 $40 Pengerjaan ulang Jam pengerjaan ulang 9 Penyetelan Jam penyetelan 6.000 60 Pengawasan Jumlah pengawasan 4.000 15

Biaya tak bernilai tambah (Karena tidak sempurna) Aktivitas Biaya bernilai tambah (SQ * SP) Biaya tak bernilai tambah (Karena tidak sempurna) Biaya aktual (AQ * SP) Pengelasan $400.000 $80.000 $480.000 Pengerjaan ulang 90.000 Penyetelan 360.000 Pengawasan 60.000 Total $590.000 $990.000 Mengetahui perubahan perioe Laporan biaya bernilai tambah dan tak bernilai tambah untuk tahun fiskal yang berakhir pada 31 desember 2008

Pelaporan tren : biaya tak bernilai tambah 2. Trend Activity Aktivitas 2007 2008 perubahan Pengelasan $80.000 $50.000 $30.000 Pengerjaan ulang 90.000 70.000 20.000 Penyetelan 360.000 200.000 160.000 Pengawasan 60.000 35.000 25.000 Total $590.000 $355.000 $235.000 Pelaporan tren : biaya tak bernilai tambah

3. Kaizen Standard Proses penguranga biaya dengan produk dan proses

Internal benchmarking Uses best practices as the standard for evaluating activity performance Internal benchmarking Benchmarking against the best internal performance External benchmarking Comparison with others outside the organization

ACTIVITY BASED CUSTOMER

ACTIVITY BASED SUPPLIER   Murray, Inc Plata Associates Komponen A1 B2 biaya pembelian $20x80.000 $1,600,000 $52x40.000 $2,080,000 $24x10.000 240,000 $56x10.000 560,000 Perbaikan produk $400x1600 640,000 $400x380 152,000 $400x10 4,000 Percepatan pengiriman produk $2000x60 120,000 $2000x40 80,000 Biaya total $2,360,000 $2,312,000 $244,000 $564,000 unit 40,000 10,000 Biaya total unit $29.50 $57.80 $24,40 $56,40

THE END