PROJECT 2D MARINE SEISMIC DATA ACQUISITION CONTRACT

Slides:



Advertisements
Presentasi serupa
SOP 05 : PENGENDALIAN MUTU PENUGASAN
Advertisements

Perth Chart & Critical Path Method
Pengelolaan Proyek Sistem Informasi
Presented By: Nurul Faizah Politeknik Elektronika Negeri Surabaya.
PELAKSANAAN EKSPOR EXIM Week 10 – IBM Universitas Ciputra Importir
KAPITA SELEKTA: “Teknik Pengumpulan Data” Shinta P. STMIK MDP 2009.
Proyek Pengembangan Sistem Informasi
Evaluasi Proyek.
Pemeriksaan Atas Sikus Pengeluaran
Project Procurement Management
C- Train Reactivation Project Tj
PROPOSAL DAN NEGOSIASI
Managerial failure costs. Kegagalan memanajemen biaya dapat timbul disepanjang proses pengembangan perangkat lunak. Berikut merupakan contoh kegagalan.
ELEMEN MANAJEMEN PROYEK
Roesfiansjah Rasjidin Program Studi Teknik Industri Fakultas Teknik – Univ. Esa Unggul.
Matakuliah : M0086/Analisis dan Perancangan Sistem Informasi
Administrasi Kontrak Pertemuan 08
Dokumen Perencanaan Proyek Perangkat Lunak
Pertemuan 08 Modeling Business Processes Matakuliah: M0034 /Informasi dan Proses Bisnis Tahun: 2005 Versi: 01/05.
Pertamina Sudan1 Velocity and Over Pressure Study.
Soal-soal Long-Term Liabilities
1 Pertemuan 22 Analisis Studi Kasus 2 Matakuliah: H0204/ Rekayasa Sistem Komputer Tahun: 2005 Versi: v0 / Revisi 1.
INDONESIA INFRASTRUCTURE INITIATIVE IURSP – Monitoring dan Evaluasi IURSP – Monitoring and Evaluation Workshop 3 Steve Brown VicRoads International Projects.
Manajemen Proyek Sistem Informasi
Perencanaan Pengujian (Test Plan) Pertemuan 4
1 INTRODUCTION Pertemuan 1 s.d 2 Matakuliah: A0554/Analisa dan Perancangan Sistem Informasi Akuntansi Tahun: 2006.
Cursor MI2163 Dasar Pemrograman Basis Data. Introduction Cursor merupakan suatu variabel yang digunakan untuk menampung hasil query yang terdiri atas.
PROPOSAL Pertemuan 5.
PROPOSAL.
Pengelolaan Sistem Informasi
Piutang Chapter 8.
Pengelolaan Proyek Sistem Informasi
TRANSPARENCY INTERNATIONAL INDONESIA
Kontrak Kontrak adalah :
REVENUE RECOGNITION Revenue Recognition Current Revenue Revenue
Project Scope Management
Kuliah 13 – Manajemen Konstruksi
Pengenalan dan pemahaman
Manajemen Procurement
IMPLEMENTASI FMS.
CA113 Pengantar Manajemen Bisnis
Kelas VII semester 2 Rahmi Susiswanti
BAB 6 JASA – JASA PERBANKKAN.
Kuliah 13 – Manajemen Konstruksi
Pertemuan 20 Audit Reporting
CA113 Pengantar Manajemen Bisnis
1st Knowledge Area : Project Integration Management
SELAMAT DATANG PESERTA SARASEHAN INDOMS
PROYEK HIGH SPEED DIESEL ( HSD )
Mengenal Nama Hari, Bulan dan Tahun
TEOREMA PYTHAGORAS This template can be used as a starter file to give updates for project milestones. Sections Right-click on a slide to add sections.
Management (knowedge area #4)
METODOLOGI MANAJEMEN PROYEK PRODI MIK | FAKULTAS ILMU-ILMU KESEHATAN
Persyaratan Administrasi
4 plan.
This presentation uses a free template provided by FPPT.com MR. NUGROHO PLAN TROPICAL RENEWABLE ENERGY CENTER.
CA113 Pengantar Manajemen Bisnis
Manajemen Pengadaan Proyek
Mobile Courier User Training Kramat Raya 43, Xprins Meeting Room May 8th, 2014.
Manajemen Proyek
HughesNet was founded in 1971 and it is headquartered in Germantown, Maryland. It is a provider of satellite-based communications services. Hughesnet.
 Zoho Mail offers easy options to migrate data from G Suite or Gmail accounts. All s, contacts, and calendar or other important data can be imported.
Fix problems opening Norton  Fix problems opening Norton This problem can happen after you update Norton. To fix the matter, restart the computer. Fix.
If you are an user, then you know how spam affects your account. In this article, we tell you how you can control spam’s in your ZOHO.
How do I Add or Remove a delegate to my Gmail account? Google launched delegation service 9 years ago for Gmail that allows you to give permission to access.
In this article, you can learn about how to synchronize AOL Mail with third-party applications like Gmail, Outlook, and Window Live Mail, Thunderbird.
ISA Implementation Support Module Prepared by IAASB Staff October 2010 Materiality, Misstatements and Reporting − Part II.
Piutang Chapter 8.
Rank Your Ideas The next step is to rank and compare your three high- potential ideas. Rank each one on the three qualities of feasibility, persuasion,
2. Discussion TASK 1. WORK IN PAIRS Ask your partner. Then, in turn your friend asks you A. what kinds of product are there? B. why do people want to.
Transcript presentasi:

PROJECT 2D MARINE SEISMIC DATA ACQUISITION CONTRACT NO.:CPOC/2007/EXP-002

PROJECT 2D MARINE SEISMIC DATA ACQUISITION

REFERENCE FOR PROJECT 2D MARINE SEISMIC DATA ACQUISITION TC PAPER BUDGET 2007. A F E

Proses Tender 2D Marine Seismic Data Acquisition TC (USER) Scope Of Work TC Contract Strategy TC Technical Criteria TC Technical Evaluation & Result TC Commercial Evaluation & Result TC Secretary (CPL) Persetujuan daftar kontraktor Publikasi Penyusunan ITB Instruction To Bidder Pengiriman Waktu pengumpulan Open Bid Pada Project ini tidak melalui proses yang standar dikarekanan keterbatasan personil Evaluasi Technical Evaluasi Comercial Result Evaluation Tender MC OEPA & PARTNERS Letter of Award Awarding & Approval Negosiasi Persetujuan OEPA Pengiriman Draft Kontrak ke Kontraktor Performance Bond Tanda tangan Kontrak

FILLING SYSTEM WP & B 2007 TC PAPER ITB SURAT MENYURAT PROGRAM INTERIM KONTRAK 2D DATA SEISMIC MARINE ACQUISITION FINAL REPORT PRESENTASI A F E INVOICE BUKTI PEMBAYARAN LITERATUR NOTE . -

Coral Petroleum Operating Company Ltd. WP & B 2007 Coral Petroleum Operating Company Ltd. 2007 WORK PROGRAM & BUDGET

TC PAPER CONTRACTING STRATEGY Terima dokument dari User pada tanggal 21 November 2007 Approval MC selesai pada tanggal 21 November 2007

TECHNICAL EVALUATION Terima dokumen dari User pada tanggal 4 Maret 2008 Approval MC pada tanggal 4 Maret 2008

TECHNICAL & COMMERCIAL EVALUATION RESULT Terima Dokumen dari User pada tanggal 7 April 2008 Approval MC pada tanggal 9 April 2008

I T B CPOC mengirimkan surat ke OEPA & Partner untuk persetujuan calon kontraktor pada tanggal 15 November 2007 Respon dari OEPA & Paertner : OEPA PERTAMINA CNPC SUDAPET EXPRESS DINDIR Pengiriman dokumen ITB pada tanggal 27 Desember 2007

Chronology Chart Summary March April May June July 30 3 9 24 4 17 3-4 8-10 09-19 09 March CPOC need Clarification: Technical Proposal, Mob & Operation Plan; Contractor Exception. 10 March BGP clarification: mob on 01 Aug, using the GGS Atlantic Vessel from Yemen, 60 days (operation) 30 March Approval Proposal Seismic Program for OEPA from Partners 03 April Approval of Awarding Recommendation by OEPA BGP Clarification for schedule (mob august,10) 09 April CPOC sending Awarding Contract to BGP 24 April Acceptance of Contract Award by BGP 04 June BGP replace the Atlantis vessel by the Atlas Vessel, after acquisition jobs in South China Sea (Mid Aug). Commence of acquisition on End of September (tentative schedule) 17 June BGP propose Vessel ATLAS to MV ZEPHYR-1Vessel : ATLAS still in Sunya-China for Preparation Zephyr-1 will mobilization from Singapore on Mid July 2008 Propose additional fee for Mob/Demobilization 3-4 July CPOC delegates team inspection Zephyr-1 to Singapore 4 July CPOC Delegation has Signed MOU about Zephyr-1 with BGP team 8-9 July BGP signed the Vessel Contract; the Zephyr-1 vessel mobilization to Port Sudan (17 days) 10 July CPOC send the latest revised seismic program to OEPA and Partners for Approval Early Aug 2D Marine Seismic Acquisition will running in Block-13

Chronology Chart Summary March 09 CPOC need more clarification of the technical proposal to BGP. March 10 BGP clarification: Mobilization Plan : Mob date on August 1st (12 days) & GGS Atlantic Vessel from Yemen Start-up Plan : 5 days after mob. completion in Yemen Operation Plan : working 60 days (production: 3000km/month) March 19 Clarification of Contractor Exception by BGP (Duration & renewal contract; compensation; acceptance of work; liability/indemnity; change order; contractor default; termination of contract; non-exclusive agreement; schedule of compensation. March 25 CPOC send the approval letter to OEPA & partners about the Awarding & Recommendation for BGP March 30 Proposal of 2D Seismic Program for OEPA & Partners Approval March 31 Contract Negotiation : Later Mob; Early Termination; Other Exception of BGP; Competitive of Quotation; Formal Letter of Feedback required from BGP April 01 CPOC need clarification mobilization plan and update quotation April 03 BGP clarification : Mob date before August 10, duration two weeks, start up one week after mobilization. Approval of Awarding Recommendation by OEPA April 09 CPOC sending Awarding Contract to BGP

Chronology Chart Summary April 15 Postponement of confirming acceptance of contract award by BGP. April 24 Acceptance of Contract Award by BGP May 13 Pertamina approve the 2D Seismic Program May 21 Send Invitation letter to BGP for negotiation of work plan & Scope of work Clarification, on June 08, 2008 June 04 The Atlantic vessel refuse of acquisition jobs, due to security issue in Sudan. BGP management decided to bring the BGP Atlas (vessel replacement). The Atlas Vessel will be available in Mid August, after finished survey in South China Sea (attached detail schedule). June 09 Contract Negotiation with BGP (stand by condition, Vessel Equipments etc) June 15 CPOC accepted the technical proposal & mobilization delay (> 1 month) of the Atlas vessel. CPOC invite BGP to sign the contract on June 22, 2008. June 17 BGP proposed to vessel replacement (Atlas to MV Zephyr-1). Mobilization from Singapore on Mid July, 2008. Due to Atlas vessel reparation in Sunya-China. Propose the additional fee for mobilization & demobilization June 19 BGP has clarified the technical requirement of Zephyr-1 June 23 CPOC evaluate for technical specification of Zephyr-1 vessel, not reach CPOC requirement. CPOC need to inspect the vessel in Singapore as early June July 03-04 CPOC delegates visit Singapore to inspect Zephyr-1 and technical discussion

Chronology Chart Summary July 04 CPOC delegation has signed MOU with BGP team, CPOC & BGP agree as follows: CPOC accept & agrees to use this vessel for carrying out the 2D Seismic Survey BGP should be provide the charter agreement (BGP & DMNG) for using the Zephyr-1 CPOC & BGP commit to sign the contract, not later than July 15th, 2008 CPOC & BGP agree that the boat will start mobilization from Singapore on July 8th, 2008 & prepare to start the 2D seismic survey not later than July 31, 2008. CPOC will prepare all permits, customs & security clearance for the Zephyr-1 and chase vessel to enter into the working area in Sudan waters before 25th July. BPC should be provided all the supporting document before July 25th, 2008. July 08 BGP has informed the signing of chartered vessel agreement, Vessel will be departed from Singapore as July 09 and will arrived in Port Sudan about 17 days. BGP can’t send professional persons to attend the final negotiation, ask CPOC to send draft of final contract and will be responded as soon as possible. July 09 CPOC send revised seismic program to OEPA and partners for approval. consist: 28 regional lines (10x12 km) 2693 km & 62 infill line (3x3 km in the northern, 5x5 km in the southern) 3080 km. Totally 90 lines length 5773 km. July 13 CPOC send letter to BGP: inform Mr.Ibrahim as the Coordinator Project; the Official letter sent by fax, required the BGP Representative in Khartoum; Update Operation Schedule for support of Custom Clearance & work permits, Daily Log of Mobilization; completely of the chase vessel Document July 14 CPOC will prepare the all the permits, custom & security clearance for Seismic & Chase Vessels

Chronology Chart Summary July 15 BGP send letter to CPOC inform the Project Operation, Contract issue coordinators and the authorize representative in Khartoum; Updated Operation; the chase vessel document. BGP sent details spec of the Chase Vessel (MV. Viking Vanguard) and BGP need the final draft contract before signing contract. CPOC remind BGP for signing contract on July 15, 2008 followed by MOU (July 4, 2008) July 16 CPOC need clarification about Zephyr-1 Schedule for production acquisition CPOC already sent the hard-copy contract to BGP July 17 BGP sent letter to CPOC; for new commercial proposal of Zephyr-1 Vessel: Fuel & Oil Compensation Work permission & security issues Chase Vessel Cost Stand by Condition CPOC invite BGP for Negotiation & Signing of Contract before July 20, 2008 July 23/24 CPOC & BGP will be planned of the final negotiation

INVOICE

CATATAN

Hasil pekerjaan: Waktu pelaksanaan & pekerjaan tidak sesuai dengan waktu yang direncanakan, sehingga hasilnya tidak optimal digunakan sebagai dasar pekerjaan selanjutnya (akuisisi seismik). Hal tersebut dikarenakan: Rusaknya alat gravity dan tidak ada cadangan alat sehingga ada masa berhenti pada saat pengambilan data pekerjaan banyak terhambat oleh kondisi alam dan politik dari Red Sea Sudan (gelombang dan masalah perbatasan) hal ini dikarenakan perencanaan waktu yang kurang baik Pekerjaan Interpretasi yang dilakukan oleh Consultant (dari CNPC) tidak begitu menguasai sehingga hasilnya tidak maksimal dan lama Pekerjaan tidak tercapai sesuai program 5919 KM, untuk Marine Gravity terealisasi 5462,5 km, dikarenakan tidak bisa dilakukan survey daerahberbatasan dengan Egypt dan Pulau Karang, untuk Marine survey Gravity darat 230 km terealisasi 239,3 km

Prosedur : Pekerjaan ini dilakukan dengan cara tunjuk langsung dimana tidak dilakukan proses tender. Dan mengakibatkan: Tidak adanya kontrol harga dan kualitas dari vendor lain, dimana harga akhir yang digunakan mengacu pada harga di block-15 (RSPOC) Penandatanganan kontrak dilakukan setelah pekerjaan sudah berlangsung (back date). Akibatnya: Adanya perjanjian pekerjaan yang tidak detail sehingga waktu pekerjaan konsultan tidak dibatasi dan berlangsung lebih dari 6 bulan; dimana biaya melebihi budget yang sudah ditentukan Perjanjian akomodasi tidak jelas sehingga banyak biaya yang dibayarkan oleh CPOC untuk kebutuhan consultant (ticket, akomodasi di sudan, dll) Tidak adanya Performance bond sehingga tidak ada control dari CPOC terhadap kontraktor

Biaya : Terjadinya pembengkakan biaya pelaksanaan pekerjaan tenaga konsultant dengan rincianrincian: WP&B 2007 AFE INVOICE Untuk pembayaran tenaga konsultant sebesar USD 115,200.00 Total biaya Marine Gravity USD 989,204.00

Lain-lain: Kesalahan yang terjadi pada pekerjaan Gravity diakibatkan kurangnya kontrol dari pihak Pertamina yang di CPOC, karena Kurangnya pengalaman dan persiapan dalam menangani pekerjaan di luar negeri. Kurangnya dukungan dari perwakilan SUDAPET (non paying partner) sehingga tidak ikut mengontrol pelaksanaan tender, perjanjian kerja, pekerjaan dan hasil pekerjaan. Untuk pekerjaan Gravity, Presiden CPOC hanya menyatakan Nilai kontrak /km, term dan condition sama dengan block-15 RSPOC, tetapi salinan kontrak tidak diberikan dan dibiarkan tenaga Pertamina bekerja dalam waktu singkat, padahal Cina mempunyai salinan kontraknya, hal ini membuat saudara Aref (CPL MGR) pada waktu itu mengundurkan diri, hal ini menunjukkan CNPC mempunyai rencana untuk tidak bekerjasama dengan baik.