Problem Solving & Operation Analisis Tools

Slides:



Advertisements
Presentasi serupa
Information Systems, Organizations, and Strategy
Advertisements

2. Introduction to Algorithm and Programming
Manajemen Risiko Strategi Risiko Reaktif & Proaktif
Reduksi / Pengurangan Set-Up
1 Flowchart Techniques Is: A graphical representation of the sequence of operations in an information system program The plan to be followed when the program.
Roesfiansjah Rasjidin Program Studi Teknik Industri Fakultas Teknik – Univ. Esa Unggul.
MATERIAL RESOURCE PLANNING
KONSEP STRATEGI BISNIS DAN IMPLIKASINYA PADA STRATEGI IS/IT
BLACK BOX TESTING.
Inventory Management. Introduction Basic definitions ? An inventory is an accumulation of a commodity that will be used to satisfy some future demand.
1 Pertemuan 09 Kebutuhan Sistem Matakuliah: T0234 / Sistem Informasi Geografis Tahun: 2005 Versi: 01/revisi 1.
1 Pertemuan 12 Pengkodean & Implementasi Matakuliah: T0234 / Sistem Informasi Geografis Tahun: 2005 Versi: 01/revisi 1.
1 Pertemuan 21 Function Matakuliah: M0086/Analisis dan Perancangan Sistem Informasi Tahun: 2005 Versi: 5.
1 Pertemuan 22 Analisis Studi Kasus 2 Matakuliah: H0204/ Rekayasa Sistem Komputer Tahun: 2005 Versi: v0 / Revisi 1.
Result in Competitive Advantage from: Low costs Differentiation Result in Competitive Advantage from: Low costs Differentiation Improving Responsiveness.
Verb Tense Tense denotes the time of the action indicated by a verb. The time is not always the same as that indicated by the name of the tense.
1 Pertemuan 11 Function dari System Matakuliah: M0446/Analisa dan Perancangan Sistem Informasi Tahun: 2005 Versi: 0/0.
9.3 Geometric Sequences and Series. Objective To find specified terms and the common ratio in a geometric sequence. To find the partial sum of a geometric.
Introduction.  Proses manajemen untuk mengidentifikasi, mengantisipasi dan memuaskan kebutuhan pelanggan secara menguntungkan  Pemasaran adalah proses.
PERFORMANCE-BASED ASSESMENT DEFINITION CHARACTERISTIC S DESIGNING PERFORMANCE ASSESSMENT END TERM OF PERFORMANCE ASSESSMENT.
SEVEN TOOLS DALAM PENGENDALIAN KUALITAS
EIS (Executive Information Systems)
Pertemuan 03 Materi : Buku Wajib & Sumber Materi :
Chapter 3: The WebE Process
Metode LEAN di URM.
Diagram tulang ikan Diagram Ishikawa sering juga disebut sebagai diagram “sebab-akibat” atau diagram “tulang ikan”. Diagram ini adalah sebuah alat grafis.
Cartesian coordinates in two dimensions
Cartesian coordinates in two dimensions
ALAT-ALAT PENGENDALIAN KUALITAS (1)
CA113 Pengantar Manajemen Bisnis
DESIGNING AND EVALUATING MANAGEMENT CONTROL SYSTEMS
ALAT-ALAT PENGENDALIAN KUALITAS (2)
Reduksi / Pengurangan Set-Up
VECTOR VECTOR IN PLANE.
the formula for the standard deviation:
METODOLOGI PENELITIAN ADMINISTRASI NEGARA
Kelas VII semester 2 Rahmi Susiswanti
Pertemuan 10 Kombinasi Data Label Kemasan dan Kemasan
Pengantar Bisnis 7 Sessi.
Dr Rilla Gantino, SE., AK., MM
CA113 Pengantar Manajemen Bisnis
EIS (Executive Information Systems)
Pengendalian Kualitas Dani Leonidas Sumarna. MT
Manajemen Proyek Perangkat Lunak (MPPL)
Master data Management
SELAMAT BERPRESTASI… No. Nama Tim Judul Ide 1 TIM SIMPRU
MANAJEMEN SDM PT. AWATARA KARYA
Manajemen Resiko Proyek
Control Chart Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e.
Welcome 8clicks Pte Ltd. About us  8CLICKS PTE LTD is best web Development Company in Singapore. It is famous for their web designing services. 8CLICKS.
How to Set Up AT&T on MS Outlook ATT is a multinational company headquartered in Texas. ATT services are used by many people widely across.
How You Can Make Your Fleet Insurance London Claims Letter.
How Can I Be A Driver of The Month as I Am Working for Uber?
How the Challenges Make You A Perfect Event Organiser.
How to Pitch an Event
Don’t Forget to Avail the Timely Offers with Uber
Story of Successful Events, How Visions Becomes Reality.
Social Media for Events audiovisualhire.co.uk.
Suhandi Wiratama. Before I begin this presentation, I want to thank Mr. Abe first. He taught me many things about CorelDRAW. He also guided me when I.
CA113 Pengantar Manajemen Bisnis
Speaking Strategies Applied by Students at “Kampung Inggris” in Pare Kediri Yudi Setyaningsih Universitas Ma Chung Malang.
Diagram tulang ikan Diagram Ishikawa sering juga disebut sebagai diagram “sebab-akibat” atau diagram “tulang ikan”. Diagram ini adalah sebuah alat grafis.
Statistic Process Control Week 3 Ananda Sabil Hussein, SE, MCom.
By Yulius Suprianto Macroeconomics | 02 Maret 2019 Chapter-5: The Standard of Living Over Time and A Cross Countries Source: http//
Pertemuan 6 Mappa Panglima Banding. 2 COST DRIVER: Definition Is a factor that causes, “drives,” an activity’s costs. LO 4.
Rank Your Ideas The next step is to rank and compare your three high- potential ideas. Rank each one on the three qualities of feasibility, persuasion,
Draw a picture that shows where the knife, fork, spoon, and napkin are placed in a table setting.
2. Discussion TASK 1. WORK IN PAIRS Ask your partner. Then, in turn your friend asks you A. what kinds of product are there? B. why do people want to.
Wednesday/ September,  There are lots of problems with trade ◦ There may be some ways that some governments can make things better by intervening.
Transcript presentasi:

Problem Solving & Operation Analisis Tools

Prosedur Sistematis untuk “PSK&E” Identifikasi Masalah Mengumpulkan data Menganalisa data Mengembangkan solusi alternatif Memilih solusi Menggunakan solusi Follow up

Definisi Masalah 1) Masalah dapat diartikan sebagai sesuatu yang mengganggu sistem. Gap antara harapan dan kenyataan Contoh : Peralatan kerja tidak nyaman untuk melakukan aktivitas kerja Lingkungan kerja yaitu pencahayaan tidak sesuai dengan aktivitas kerja yang dilakukan

Identifikasi Masalah Peralatan/Tools: - Pareto analysis Examples: - Fishbone diagram - Gantt chart - PERT chat Examples: Product with low profit Bottleneck operations Workers complaints

Analysis Tools 5 Why 4W + 1H Why is this operation necessary? Why is this operation performed in this manner? … 4W + 1H How can the operation be performed better? Who can best perform the operation? Where could … When … Why …

Pemborosan Shingo, Shigeo [1985] mengelompokkan pemborosan atas 7 (tujuh) macam, yaitu :   1. Over produksi 2. Waktu menunggu 3. Transportasi 4. Pemrosesan (over proses) 5. Tingkat persediaan barang  6. Gerakan yang tidak perlu 7. Cacat produksi

1. Produksi berlebihan - Overproduction. Produksi berlebihan adalah memproduksi barang sebelum barang itu sebenarnya diperlukan.  Produksi berlebihan sangat merugikan industri manufaktur karena menghambat aliran material dan sebenarnya menurunkan produktivitas dan mutu.

2. Menunggu - Waiting Setiap saat barang-barang tidak berpindah atau tidak diolah maka terjadilah pemborosan menunggu. Kebanyakan proses ini dikarenakan menunggu proses berikutnya, ini biasanya karena aliran material yang buruk, waktu pengolahan produksi yang terlalu lama, dan jarak antara proses kerja satu ke yang lainnya terlalu jauh. Menghubungkan antar proses agar pasokan secara langsung ke dalam proses berikutnya secara dramatis akan mengurangi waktu tunggu.

3. Memindahkan – Transporting Memindahkan atau mengangkut produk dari proses ke proses adalah kegiatan yang tidak menambahkan nilai ke dalam produk.  Pergerakan yang berlebihan dan penanganan yang berlebihan akan menimbulkan kerusakan dan kemungkinan mengakibatkan mutu produk yang menurun. Hal ini sering disebabkan oleh layout pabrik yang buruk dimana proses sebelumnya atau proses berikutnya terletak saling berjauhan dan ini tidak menambahkan nilai dari sudut pandang pelanggan. Transportasi menjadi sulit untuk dikurangi karena biaya pemindahan material dan biaya produksi yang menyatu. Sering kali sulit mengetahui proses mana sebaiknya yang menjadi proses berikutnya. Dengan memetakan aliran produk bisa membuat pemborosan ini lebih mudah dilihat

4. Pemrosesan - Processing Sering kita mendengar istilah “membunuh nyamuk dengan bom”, ini terjadi di banyak organisasi menggunakan perlengkapan dengan tingkat akurasi yang tinggi dan biasanya mahal dimana sebenarnya cukup dengan alat yang lebih sederhana. Toyota terkenal dengan penggunaan peralatan mereka berupa otomatisasi berbiaya rendah digabungkan dengan manajemen bebas perawatan, bahkan sering dengan mesin yang lebih tua. Menggabungkan langkah secara signifikan akan mengurangi pemborosan proses yang tidak sepantasnya.

5. Persediaan - Inventory Kelebihan persediaan cenderung menyembunyikan masalah di dalam pabrik yang seharusnya dikenali dan diperbaiki untuk meningkatkan kinerja operasionalnya. (Work in Progress - WIP), barang dalam proses secara langsung adalah akibat dari produksi yang berlebihan dan menunggu. Dengan menciptakan aliran langsung dari proses ke proses di banyak industri manufaktur telah memperbaiki pelayanannya kepada pelanggan dan menghapuskan persediaan serta menghemat biaya.

6. Gerakan - Motion Pemborosan ini berhubungan dengan motion study dan ergonomi, banyak gerakan yang tidak diperlukan dan ataupun gerakan yang harus dihilangkan Pekerjaan dengan gerakan berlebihan sebaiknya dianalisa dan dirancang kembali dengan melibatkan para karyawan pabrik untuk memperbaiki kinerjanya.

7. Cacat - Defects Pemborosan ini berdampak langsung kepada kelangsungan hidup perusahaan dimana produk cacat mengakibatkan kerja ulang atau membuat produk skrap, biaya yang dikeluarkan pun luar biasa. Biaya-biaya ini termasuk mengarantinakan persediaan, memeriksa ulang, penjadwalan kembali, dan kehilangan kapasitas. Di banyak organisasi total biaya dari cacat sangat berarti bagi persentase biaya produksi. Bagaimana akibatnya bila produk cacat ditemukan di pelanggan? Berapakah biaya yang harus dikeluarkan oleh perusahaan?  Dengan melibatkan karyawan dalam melakukan perbaikan proses yang berkesinambungan maka sangatlah besar kesempatan untuk mengurangi cacat di banyak proses kerja

Waste from overproduction

Waste from waiting times

Waste from scrap and defects

Seven Quality Tools The Seven Tools Histograms, Pareto Charts, Cause and Effect Diagrams, Run Charts, Scatter Diagrams, Flow Charts, Control Charts

Ishikawa’s Basic Tools of Quality Kaoru Ishikawa developed seven basic visual tools of quality so that the average person could analyze and interpret data. These tools have been used worldwide by companies, managers of all levels and employees. Kaoru Ishikawa is known for “democratizing statistics.” Since statistical concepts are not that easy to grasp, he created ways for the average person to obtain knowledge in statistics.

Histograms Slide 1 of 3 Histogram Defined A histogram is a bar graph that shows frequency data. Histograms provide the easiest way to evaluate the distribution of data. Histograms suggest the nature of and possible improvements for physical mechanisms at work in progress.

Histograms Slide 2 of 3 Creating a Histogram Collect data and sort it into categories. Then label the data as the independent set or the dependent set. The characteristic you grouped the data by would be the independent variable. The frequency of that set would be the dependent variable. Each mark on either axis should be in equal increments. For each category, find the related frequency and make the horizontal marks to show that frequency.

Histograms Slide 3 of 3 Examples of How Histograms Can Be Used Histograms can be used to determine distribution of sales. Say for instance a company wanted to measure the revenues of other companies and wanted to compare numbers. Perhaps the company wants to compare numbers of companies that make from 0-10000; from 10,000-20,000; from 20,000-30,000; and so on.

Pareto Charts Slide 1 of 4 Pareto Chart Defined Pareto charts are used to identify and prioritize problems to be solved. They are actually histograms aided by the 80/20 rule adapted by Joseph Juran. Remember the 80/20 rule states that approximately 80% of the problems are created by approximately 20% of the causes. This is the economic concept that Juran applied to quality problems. The meaning behind that 80/20 rule is that there are vital few causes that create the problems.

Pareto Charts Slide 2 of 4 Constructing a Pareto Chart First, information must be selected based on types or classifications of defects that occur as a result of a process. The data must be collected and classified into categories. Then a histogram or frequency chart is constructed showing the number of occurrences. The steps used in Pareto analysis include gathering categorical data, drawing the histogram, and concentrating on the tall bars.

Pareto Charts Slide 3 of 4 An Example of How a Pareto Chart Can Be Used Pareto Charts are used when products are suffering from different defects but the defects are occurring at a different frequency, or only a few account for most of the defects present, or different defects incur different costs. What we see from that is a product line may experience a range of defects. The manufacturer could concentrate on reducing the defects which make up a bigger percentage of all the defects or focus on eliminating the defect that causes monetary loss. Actual chart is on the next slide Example and chart were obtained from: <www.yourmba.co.uk/pareto_diagram.htm> Data should be analyzed in two cases. The manufacturer could concentrate on reducing the defects that make up a bigger percentage of all the defects or they could concentrate on the defect that is costing them the most money. As part of the analysis, look at the tallest bars when trying to solve the problem.

Pareto Charts Slide 4 of 4 Concentrating on reducing defects A, B and C since they make up 75% of all defects. Or focus on eliminating defect E, if defect E causes 40% of monetary loss.

Cause and Effect Diagrams Slide 1 of 4 Cause and Effect Diagram Defined The cause and effect diagram is also called the Ishikawa diagram or the fishbone diagram. It is a tool for discovering all the possible causes for a particular effect. The major purpose of this diagram is to act as a first step in problem solving by creating a list of possible causes. This tool helps workers spend time on concentrating on the causes of problems rather than focusing on improving the indications of problems.

Cause and Effect Diagrams Slide 2 of 4 Constructing a Cause and Effect Diagram First, clearly identify and define the problem or effect for which the causes must be identified. Place the problem or effect at the right or the head of the diagram. Identify all the broad areas of the problem. Write in all the detailed possible causes in each of the broad areas. Each cause identified should be looked upon for further more specific causes. View the diagram and evaluate the main causes. Set goals and take action on the main causes. This is called the fishbone diagram because it looks like the skeleton of a fish. The problem is the head, the major causes of a problem are the “ribs”, and the detailed causes are the small bones.

Cause and Effect Diagrams Slide 3 of 4 An Example of When a Cause and Effect Diagram Can Be Used This diagram can be used to detect the problem of incorrect deliveries. Diagram on next slide Diagram obtained from: <http://www.hci.com.au/hcisite/toolkit/causeand.htm> When a production team is about to launch a new product, the factors that will affect the final product must be recognized. The fishbone diagram can depict problems before they have a chance to begin. The effect being examined is normally an aspect of product or service quality.

Cause and Effect Diagrams Slide 4 of 4 Diagram of the Incorrect Deliveries Example: You continue the process of branching off into more and more directions until every possible cause has been identified. The final result will represent a pile of all the factors relating to the effect being explored and the relationships between them.

Scatter Diagrams Slide 1 of 4 Scatter Diagrams Defined Scatter Diagrams are used to study and identify the possible relationship between the changes observed in two different sets of variables. These relationships are can be used to recognize indicator variables in organizations.

Scatter Diagrams Slide 2 of 4 Constructing a Scatter Diagram First, collect two pieces of data and create a summary table of the data. Draw a diagram labeling the horizontal and vertical axes. It is common that the “cause” variable be labeled on the X axis and the “effect” variable be labeled on the Y axis. Plot the data pairs on the diagram. Interpret the scatter diagram for direction and strength. The X variable is independent and the Y variable is dependent.

Scatter Diagrams Slide 3 of 4 An Example of When a Scatter Diagram Can Be Used A scatter diagram can be used to identify the relationship between the production speed of an operation and the number of defective parts made. A scatter diagram is used for confirming instincts about a cause-and-effect relationship between types of variables.

Scatter Diagrams Slide 4 of 4 An Example of When a Scatter Diagram Can Be Used (cont.) Displaying the direction of the relationship will determine whether increasing the assembly line speed will increase or decrease the number of defective parts made. Also, the strength of the relationship between the assembly line speed and the number of defective parts produced is determined. Example obtained from: <http://www.sytsma.com/tqmtools/Scat.html> Scatter diagrams are also used to display the direction of the relationship and displaying the strength of the relationship.

Flow Charts Slide 1 of 3 Flow Charts Defined A flow chart is a pictorial representation showing all of the steps of a process. Flow charts define and analyze processes. They build a step-by-step picture of the process for analysis, discussion, or communication purposes.

Flow Charts Slide 2 of 3 Creating a Flow Chart First, familiarize the participants with the flow chart symbols. Draw the process flow chart and fill it out in detail about each element. Analyze the flow chart. Determine which steps add value and which don’t in the process of simplifying the work. Some examples of simple symbols are: the shape of a diamond symbolizes decisions, a parallelogram represents input or output, the rectangle is the processing symbol, an arrow for flow line and so forth.

Flow Charts Slide 3 of 3 Examples of When to Use a Flow Chart Two separate stages of a process flow chart should be considered: The making of the product The finished product Flow charts are used to define, standardize, or find areas for improvement in a process.

Run Charts Slide 1 of 3 Run Charts Defined Run charts are used to analyze processes according to time or order. Run charts are useful in discovering patterns that occur over time.

Run Charts Slide 2 of 3 Creating a Run Chart Gathering Data Some type of process or operation must be available to take measurements for analysis. Organizing Data Data must be divided into two sets of values X and Y. X values represent time and values of Y represent the measurements taken from the manufacturing process or operation. Charting Data Plot the Y values versus the X values. Interpreting Data Interpret the data and draw any conclusions that will be beneficial to the process or operation. When measuring data, the measurements must be taken over time and in sequential order. When plotting the values, use an appropriate scale that will make the points on the graph visible.

Run Charts Slide 3 of 3 An Example of Using a Run Chart An organization’s desire is to have their product arrive to their customers on time, but they have noticed that it doesn’t take the same amount of time each day of the week. They decided to monitor the amount of time it takes to deliver their product over the next few weeks. By using a run chart, the organization can determine which day or days it is taking longer to deliver and can allow themselves more time for on-time delivery.

Control Charts Slide 1 of 3 Control Charts Defined Control charts are used to determine whether a process will produce a product or service with consistent measurable properties. The process for developing a process chart is the same for almost all charts. The statistical computations is what makes it different and sometimes more complicated.

Control Charts Slide 2 of 3 Steps Used in Developing Process Control Charts Identify critical operations in the process where inspection might be needed. Identify critical product characteristics. Determine whether the critical product characteristic is a variable or an attribute. Select the appropriate process control chart. Establish the control limits and use the chart to monitor and improve. Update the limits. A variable is a continuous measurement. An attribute is the result of a binomial process that results in an either-or situation.

Control Charts Slide 3 of 3 An Example of When to Use a Control Chart Counting the number of defective products or services Do you count the number of defects in a given product or service? Is the number of units checked or tested constant? Control charts focus more on acceptable limits of the process.

Activity Process Flow Chart for Finding the Best Way Home Construct a process flow chart by making the best decisions in finding the best route home. Refer to the prior notes on flowcharts. Remember: Define and analyze the process, build a step-by step picture of the process, and define areas of improvement in the process. Answer is on the next slide Example obtained from: <http://deming.eng.clemson.edu/pub/tutorials/qctools/flowm.htm#Example>

Summary This presentation provided learning material for each of Ishikawa’s seven basic tools of quality. Each tool was clearly defined with definitions, a step-by-step process and an example of how the tool can be used. As seen through the presentation, these tools are rather simple and effective.

Works - Cited Histograms and Bar Graphs. <http://www.shodor.org/interactivate/lessons/sm3.html> Your MBA: The Business Study Reference Site. http://yourmba.co.uk/pareto_diagram.htm Hci Home Services. Cause and Effect Diagram. http://hci.com.au/hcisite/toolkit/causeand.htm Scatter Diagram. http://sytsma.com/tqmtools/Scat.html Flowchart. <http://http://deming.eng.clemson.edu/pub/tutorials/qctools/flowm.htm> Run Charts/Time Plot/ Trend Chart. <http://www.deming.edu.clemson.edu/pub/tutorials/qctools/runm.htm> Foster Thomas S. Managing Quality An Integrative Approach. New Jersey: Prentice Hall, 2001