Balfour Beatty Sakti Indonesia World Trade Centre 3, Jakarta _________________________________________________________________________________________________________________________________________________________________________________.

Slides:



Advertisements
Presentasi serupa
Tahapan information engineering
Advertisements

Gambar Proyeksi Orthografi
EXODUS 6:6-8 6 THEREFORE SAY TO THE CHILDREN OF ISRAEL: ‘I AM THE LORD; I WILL BRING YOU OUT FROM UNDER THE BURDENS OF THE EGYPTIANS, I WILL RESCUE YOU.
Learning Medium School : SMPN 1 Gotham City Subject : English
Chapter 1-a FLOW CHART.
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN BADAN PENGEMBANGAN SUMBER DAYA MANUSIA PENDIDIKAN DAN KEBUDAYAAN DAN PENJAMINAN MUTU PENDIDIKAN Sample Implementation.
Muchamad Ali Safa’at.  Removal form the office (pemakzulan): termination of a public officer within his/her term, or before the end of the term period.
Roesfiansjah Rasjidin Program Studi Teknik Industri Fakultas Teknik – Univ. Esa Unggul.
Testing Levels. Activities of Test Engineer Test engineer is an information technology professional who is in charge of ane or more technical test activities,
MATERIAL RESOURCE PLANNING
TEORI ORGANISASI DAN MANAJEMEN PENGETAHUAN
Dicky Faizal Alie Sistem Informasi
Menulis Kolom  Kolom adalah opini atau artikel. Tidak seperti editorial, kolom memiliki byline.  Kolom Biasanya ditulis reguler. Biasanya mingguan atau.
1 Pertemuan 09 Kebutuhan Sistem Matakuliah: T0234 / Sistem Informasi Geografis Tahun: 2005 Versi: 01/revisi 1.
Pertemuan 08 Modeling Business Processes Matakuliah: M0034 /Informasi dan Proses Bisnis Tahun: 2005 Versi: 01/05.
1 Pertemuan 12 Pengkodean & Implementasi Matakuliah: T0234 / Sistem Informasi Geografis Tahun: 2005 Versi: 01/revisi 1.
a.k.a structural testing WHITE BOX TESTING clear box testing
Layer Data Link Pertemuan 13 Matakuliah: H0484/Jaringan Komputer Tahun: 2007.
Verb Tense Tense denotes the time of the action indicated by a verb. The time is not always the same as that indicated by the name of the tense.
1 Pertemuan 5 Komunikasi antar Proses / Interprocess Communication (IPC) Matakuliah: T0316/sistem Operasi Tahun: 2005 Versi/Revisi: 5 OFFCLASS01.
HOW TO ACHIEVE 30% BLENDED LEARNING IN 1 HOUR. Objective To achieve 30% blended learning To achieve 30% blended learning.
Project Control Workshop PLN/KSO-AGP Project Teams June 27, 2011 By: Handi subayu.
1 INTRODUCTION Pertemuan 1 s.d 2 Matakuliah: A0554/Analisa dan Perancangan Sistem Informasi Akuntansi Tahun: 2006.
Front end-technology used in prefabricated structure building with the help of technical and expert engineers to build the best kind of shelters for suitable.
A Detailed Knowledge About Reliable Porta Cabins Manufacturers.
Jartel, Sukiswo Sukiswo
Software Engineering Process
AJAX (Asynchronous Javascript And XML)
Pert. 16. Menyimak lingkungan IS/IT saat ini
Project Scope Management
AJAX Teguh S.
Membangun Web Site“Cantik”
Rekayasa Perangkat Lunak
Kuliah 13 – Manajemen Konstruksi
PENDIDIKAN KARAKTER DALAM MATA PELAJARAN FISIKA SMA
PROCEDURE OF THE DOORS ON DOOR FRAME
IMPLEMENTASI FMS.
Kelas VII semester 2 Rahmi Susiswanti
Pengantar Bisnis 7 Sessi.
Kuliah 13 – Manajemen Konstruksi
Install wood bekisting
Phase III Rapid Prototyping and Demonstration Prototype
DR.IR DIAR FACHMI R CHAIDAR.,MT,CISCP
THE EFFECT OF COOPERATIVE LEARNING TYPE JIGSAW PROBLEM SOLVING
Manajemen Proyek Perangkat Lunak (MPPL)
Rekayasa Perangkat Lunak Part-5
TEOREMA PYTHAGORAS This template can be used as a starter file to give updates for project milestones. Sections Right-click on a slide to add sections.
Master data Management
An assessment of Pedestrian Ways in Unsyiah
Welcome 8clicks Pte Ltd. About us  8CLICKS PTE LTD is best web Development Company in Singapore. It is famous for their web designing services. 8CLICKS.
How to Set Up AT&T on MS Outlook ATT is a multinational company headquartered in Texas. ATT services are used by many people widely across.
How You Can Make Your Fleet Insurance London Claims Letter.
How Can I Be A Driver of The Month as I Am Working for Uber?
Don’t Forget to Avail the Timely Offers with Uber
© Mark E. Damon - All Rights Reserved Another Presentation © All rights Reserved
Mobile Courier User Training Kramat Raya 43, Xprins Meeting Room May 8th, 2014.
Lesson 2-1 Conditional Statements 1 Lesson 2-1 Conditional Statements.
V ERIZON SETTINGS FOR I P HONE, A NDROID, O UTLOOK, AND W INDOWS P HONE.
HughesNet was founded in 1971 and it is headquartered in Germantown, Maryland. It is a provider of satellite-based communications services. Hughesnet.
Do you want to check your Zoho mail incoming or outgoing logs and unable to check, go through with this article and access Zoho mail incoming or outgoing.
 Zoho Mail offers easy options to migrate data from G Suite or Gmail accounts. All s, contacts, and calendar or other important data can be imported.
Fix problems opening Norton  Fix problems opening Norton This problem can happen after you update Norton. To fix the matter, restart the computer. Fix.
If you are an user, then you know how spam affects your account. In this article, we tell you how you can control spam’s in your ZOHO.
How do I Add or Remove a delegate to my Gmail account? Google launched delegation service 9 years ago for Gmail that allows you to give permission to access.
Integrasi e-Office dan Saga
Rank Your Ideas The next step is to rank and compare your three high- potential ideas. Rank each one on the three qualities of feasibility, persuasion,
HANDLING RUSH PRESIDENT UNIVERSITY NURLAELA RIZKINA.
Media Pembelajaran PATHWAY TO ENGLISH Kelompok Peminatan Untuk SMA/MA Kelas X.
A SHORT ESSAY OF CIVIL ENGINEERING BY : ALFATIHATU RAHMI CIVIL ENGINEERING ENGINEERING FACULTY ANDALAS UNIVERSITY PADANG.
WINTER Template COLOUR CARD 01 Template. PowerPoint chart object 02.
Transcript presentasi:

Balfour Beatty Sakti Indonesia World Trade Centre 3, Jakarta _________________________________________________________________________________________________________________________________________________________________________________ 1 – NSC Issue to BBSI the applicable services drawing that has been coordinated and checked with; a)Latest revision of civil & architectural layouts; b)Services Size c)Equipment Size d)Accessibility 2 – BBSI MVAC or Elec Eng check the drawing for compliance with points a - d of box 1. Individual Services Drawing Process 4- Drawing suitable for issue to JKL & for integration into Combined services drawing ? 5. BBSI return comments to NSC (workshop if required) 5- Drawing Issued to Jakarta Land for approval 7a. BBSI issue back to NSC 5a- BBSI input into CSD drawing. Incorporating any notes Yes No Yes 6 Approved by JKL 7b. BBSI incorporate any applicable points into CSD 3- BBSI Civil & Arch internal approval

Balfour Beatty Sakti Indonesia World Trade Centre 3, Jakarta _________________________________________________________________________________________________________________________________________________________________________________ 1 – NSC Issue to BBSI the applicable services drawing that has been coordinated and checked with; a)Latest revision of civil & architectural layouts; b)Services Size c)Equipment Size d)Accessibility 2 – BBSI MECH or Elec Eng check the SD drawing for compliance with points a - d of box 1. Combined Services Drawing Process 3- BBSI commence with co-ordination & CSD production 6. Required openings & penetrations checked against Structural & Architectural layouts for CBWD requirements 2a – BBSI ensure current Structural & Architectural layouts are used. 4. Is ISD Drawing Approved 7- Raise notification to JKL if structural changes are required No Yes 5b. BBSI incorporate any applicable points into CSD & commence CBWD 5a. BBSI continue to compile the CSD & CBWD 8- Complete any CSD or CBWD changes to allow installation 9- Issue to JKL 10a If approved Issue to NSC 10a If rejected – workshop if required with JKL, Beca & NSC

Balfour Beatty Sakti Indonesia World Trade Centre 3, Jakarta _________________________________________________________________________________________________________________________________________________________________________________ 1 - JKL Issue For Construction Structural, Architectural & MEP Drawings, inclusive of spatial coordination, compliance with the project design performance and Employers requirements. From this Info BBSI provide approved For Con Structural & Architectural Plans that form the basis of the CBWD Drawings 2 a. --BBSI receive the required opening / sleeve info from S/C. 2 b. BBSI prepare the opening / sleeve drawing and issue to the S/C’s for sign off. Combined Builders Work Drawing Process (Early Works) 3- BBSI receive S/C sign off that the drawing is compatible with their respective installations 5- JKL receive the Architectural, Structural & MEP Engineers comments 5.1- Drawing Returned With Not Approved (Revise & Resubmit or Rejected) 7- BBSI issue drawing to S/C’s & civil team for installation BBSI incorporate comments (workshop if required) and resubmit 4 - BBSI issue to JKL 6- BBSI Drawing approved for construction by JKL Approved YES NO

Balfour Beatty Sakti Indonesia World Trade Centre 3, Jakarta _________________________________________________________________________________________________________________________________________________________________________________ 1 – In tandem with the MEP CSD drawing the required CBWD commences. 2. BBSI MEP Eng Dept. confirm latest Civil, Architectural & any applicable RFI / SI’s are incorporated in the base layout.. Combined Builders Work Drawing Process Rev If the required MEP openings / provisions are contrary to the allowances provided within the structure call for workshop. 8,- Submit to JKL for approval 4. Using the approved CSD detail all openings & provide clear sections. 6 – Upon completion final approval by BBSI Civil & Architect Team 10a - BBSI issue for Construction 5- Add applicable notes and details of any special civil requirements NO 7 –Workshop & Approval by relevant NSC’s YES 9, Drawings Approved 10b - BBSI incorporate comments

Balfour Beatty Sakti Indonesia World Trade Centre 3, Jakarta _________________________________________________________________________________________________________________________________________________________________________________ 1 – BBSI approved & signed drawing, issued to S/C & used on site, along with any applicable notes for inspection & installation. 2a – Arsimekon / Shinryo / BMP fabricate & fit any sleeves. Void and Sleeve Sign off Procedure 3- S/C QC confirm that openings & sleeves are correct and the standard notes (slide 2) are complied with and call for inspection with BBSI & Trimatra QC 2b – BBSI Form void openings using (1) * Final check that drawing is aligned with the steelwork, structural & architectural drawings MEP Works Handed Over Ready for Concrete 4 - S/C and BBSI QC sign off with Trimatra once all works verified as compliant. Note – From Step 4 if Trimatra have any comment, this shall be rectified by the S/C or BBSI (If opening) & then re-inspected by Trimatra, who once are satisfied shall sign off.

Balfour Beatty Sakti Indonesia World Trade Centre 3, Jakarta _________________________________________________________________________________________________________________________________________________________________________________ 1 – NSC Individual Drawing approved (& CSD if applicable) 2 – NSC Approved Method Statement & Risk Assessment in Place. Individual Services QC Sign off 7- NSC QC Team carry out inspection 10b. NSC add signed RFIT to As Built Drawings 4- Materials received on Site & MOS Inspection completed & signed by Trimatra 6- Complete Installation works 5- Working permit & JSA in place by NSC & approved by BBSI 6 NSC Provide 3 – Week Look ahead of Inspections 8. If approved, NSC request BBSI & Trimatra to Inspect – 3 Days notice. 3- Required Material Approval in place, with any applicable notes addressed 9, Inspection (Approved) YESNO 10a-. BBSI MEP QC advise Civil QC Team 10c-. NSC rectify defects

Balfour Beatty Sakti Indonesia World Trade Centre 3, Jakarta _________________________________________________________________________________________________________________________________________________________________________________ Quality Meeting – File Note Thursday, August 06, :30 am Agenda 1.NSC Quality Plans a)BBSI requested that Project Quality Plans are reissued to reflect the actual requirements of the site. The current plans were generic and do not reflect the procedures of the site. b)All NSC Quality plans to be complete with Sample Forms that will be used for material Inspection & work inspection etc. 2.Sign Off Procedures a)All agreed as per the attached Flow Chart 3.Interface with BBSI Civil & MEP QA / QC Teams a)All agreed as per the attached Flow Chart 4.Material On Site; a)All material brought to site must be; i.Approved with the Material submittal & sample (If required) ii.Materials on Site inspected with an MOS Inspection prior being taken to the area of installation 4.Completion of Works Prior to Civil Activities a)All agreed as per the attached Flow Chart