Ronnie Rivany ® Health & Hospital Economist

Slides:



Advertisements
Presentasi serupa
WE-2010 Web Engineering Husni husni.trunojoyo.ac.id
Advertisements

An ERP for Travel Company
INTERNASIONALISASI PROGRAM STUDI DI UGM SOSIALISASI HIBAH PENYUSUNAN AUN-SAR PRODI MELALUI SKEMA BOPTN Kantor Jaminan Mutu Tgl 4 April 2014 Jam –
Aplikasi Komputer dalam MRK batagem.com. Aplikasi Komputer dalam MK2 Komputer dan Konstruksi? Normative cost per unit value Construction Automobiles.
Perencanaan Kapasitas
ISDN Integrated Service Digital Network.
Hadi Syahrial (Health IT Security Forum)
KOMPUTERISASI SISTEM INFORMASI RUMAH SAKIT
CURRICULUM VITAE PELATIHAN PENDIDIKAN UMUM PENDIDIKAN MILITER 1 1
The Public Relations Strategic Planning Process
IT SEBAGAI ALAT UNTUK MENCIPTAKAN KEUNGGULAN KOMPETISI
IT Project Management Based on PMBOK
Rumah Sakit Wijaya Kusumah Kuningan-Jawa Barat
PENELITIAN PENGEMBANGAN
PENGANTAR URBAN DESAIN
Aplikasi Teknologi Informasi Dalam Pendidikan Bahan Kuliah Program Studi Manajemen Pendidikan-S2 Program Pascasarjana Universitas Ahmad Dahlan Dosen: Drs.
1 KOMPONEN PERUMUSAN PROGRAM KOMUNIKASI 1.Assesment - Focus the target audience 2.Planning - Target audience - Key of consumer benefit - Believe of the.
Teaching Plan Business & Management MM Unsoed 2013.
CIFOR Presentation: IndonesiaDLN. Center for International Forestry Research.
Chapter 2 ADVANCED MANAGEMENT ACCOUNTING
Ch. 7 TECHLOGY INTELLIGENCE. (T) Technical Intelligence Market Intelligence (M)
Green Productivity Prof. Ir. Moses L. Singgih, MSc, PhD
How human charactersitics, practitioners’ habits and health care system regulations affet the research and development of medical devices.
1 Certified Assessor Training Galeri 678 Kemang, 26 – 28 Agustus 2008 Materi Kuliah Program Magister Psikologi Unika Atmajaya Agustus 2009 Disusun oleh.
Pengampu: Taufik Hidayat, S.Kom, MMSI, Lektor Kepala.
2-Metode Penelitian Dalam Psikologi Klinis
Oleh: Dr. Sri Widati,S.Sos.,M.Si
1 Magister Teknik Perencanaan Universitas Tarumanagara General View On Graduate Program Urban & Real Estate Development (February 2009) Dr.-Ing. Jo Santoso.
Thinking in terms of “Systems” What is a system? A system is a collection of interrelated components (subsystems) that function together to achieve some.
Activity – Based Management 31/10/2009Akuntansi Manajemen Lanjutan.
TUGAS AKHIR VISUAL COMMUNICATION DESIGN
INTEGRATED DEVELOPMENT PROCESS Mai 2005 Contribution to Studio Process Tim Dosen: Jo Santos/Suryono Herlambang/Beni Ahmad.
Fungsi penerimaan dan fungsi biaya
PROJECT SUPPORT SYSTEM
We are in search of passionate and driven individual to become one of the few Management Associates who will be developed to become bright leaders in the.
Soal-Jawab Ujian Manajemen Produksi Manajemen Operasional
Human Resource Management MSDM strategis M-2 1Tony Soebijono.
Oleh: Dr. dr. H. Boy S. Sabarguna, MARS MMR-UMY-2010
MANPRO-M13: MUTU PROYEK SISTEM
Situasi Terkini tentang Penelitian dan Pelaksanaan Test danTreat di 28 Oktober 2014 Lecture Series Pusat Penelitian HIV dan AIDS.
Overview: Rencana Penanggulangan Bencana di Rumah Sakit.
Pengantar: Struktur Organisasi RS
1 Business Function 18/07/ Business Cycle and Process BUSINESS CYCLE BUSINESS FUNCTION BUSINESS LEVEL 18/07/2002.
Mengapa Strategi Gagal Diterapkan?
Vitri Widyaningsih. Surveillance Continuous analysis, interpretation and feedback of systematically collected data, generally using methods distinguished.
SWOT ANALYSIS Kapita Selekta UC Korporasi Cus Korporasi Faktor / Nature Resources Resources + Customer Are limited.
PT. GAKA KARYA ENGINEERING
Slide 1 Chapter 1: Introduction to Systems Analysis and Design Alan Dennis, Barbara Wixom, and David Tegarden John Wiley & Sons, Inc.
By: Ridlwan Kamaluddin, M.Kep
PROJECT FRAMEWORK Pertemuan-14 Mata Kuliah: CSM-211, Management Support System Tahun Akademik : 2012 / 2013 Sasaran Pembelajaran The student can make design.
DATA ADMINISTRATIF KESEHATAN
ASPEK KEUANGAN.
VISI MENJADI RUMAH SAKIT KEBANGGAAN
TEORI BIAYA.
RSUD Dr. SAIFUL ANWAR MALANG PROGRAM INSTALASI PELATIHAN TAHUN 2017
Manajemen Data (4) S1 - Kesmas
Administrasi Rumah Sakit
IAM.2 Grafik Kelengkapan Pengisian Rekam Medik 24 Jam Sejak Setelah Selesai Pelayanan Rawat Inap Januari s/d Maret 2017 (Standar : 100%)
Universidade Nacional Timor Loro‘sae Faculdade Medicina e Cienca da Saúde (Departemento Medicina) Docente : Denylay 1.
PRELIMINARY DISCUSSION PULOMAS JAYA Jakarta, 11 November 2009
Manajemen Data (3) S1 - Kesmas
Struktur Organisasi RS
911 Network Diversity and Resiliency
Xiong, et al. A survey of core and support activities of communicable disease surveillance systems at operating-level CDCs in China. BMC Public Health.
Customer needs are often high-level, vague and non-specific.
What is Kerberos? Network Security.
HRD in Small and Medium-sized Enterprises (SMEs)
ECD SEMINAR: Transforming Society through Early Childhood Development
MANCHESTER/HOPE HOME DIRECTOR
North Dakota Department of Public Instruction (ND DPI)
Transcript presentasi:

Ronnie Rivany ® Health & Hospital Economist Perencanaan Pembangunan AL RAHMAN SUBANG INTERNATIONAL HOSPITAL 2013/2014 Ronnie Rivany ® Health & Hospital Economist

KARAKTERISTIK INDUSTRI KESEHATAN

KONSEP DASAR Ronnie Rivany ® Health & Hospital Economist

DEVELOPMENT FEASIBILITY STUDY ANALYSIS OF EXTERNAL ASPECT DEMOGRAPHICS GEOGRAPHICS COMPETITOR…etc ANALYSIS OF HEALTH ASPECT EPIDEMIOLOGY MAN POWER FACILITIES. .etc No of beds, no of specialists STRATEGIC BUSINESS UNIT Total amount in $, Budgeting Break Even Point ???? Feasible or not ??????

Grafik Perkembangan Cash Flow Alternatif Prediksi BEP dicapai pada tahun ke-10

JENIS LAYANAN

LAYANAN PENUNJANG

MASTER PLAN + BLOCK PLAN HEALTH SERVICES LOCATION IN PATIENT OUT PATIENT SUPPORTING PATIENT FLOW ZONING SITE PLAN BIRD EYE VIEW MODEL ON SCALE 1:100 etc

Master Plan RSUD BARI PALEMBANG A POLIKLINIK (3LT) B UGD C CAFÉ D RADIOLOGI, FARMASI, LAB, INSTALASI PENUNJANG DIAGNOSTIK, BANK DARAH E REKAM MEDIS F ADMINISTRASI G BEDAH SENTRAL H R KEBIDANAN DAN KANDUNGAN I HEMODIALISA, CSSD, REHAB MEDIK, ANESTESI, PATOLOGI ( 2LT) J ICCU K ICU L RWT INAP KELAS 1 (2 LT) M RWT INAP KLS 2 (2 LT) N RWT INAP KELAS 3 O RWT INAP VIP P RWT INAP VVIP Q DAPUR R LAUNDRY S WORK SHOP T GENSET U IPAL DAN INSENERATOR V JENAZAH W TPS X MESJID Y GSG Z KANTIN 1 PERPUSTAKAAN 2 KELAS ( 2 LT ) 3 RUMAH DOKTER 4 ASRAMA ( 3 LT ) Contoh Master Plan RSUD BARI PALEMBANG X C Y B A I E H D Z G K 1 F 2 J 3 L 2 N O 3 P 2 M O 4 T S R Q U 4 V W

Contoh Master Plan RSUD BARI PALEMBANG

Contoh Master Plan Pengembangan RSUD KUNINGAN

DED (Detail Enginering Design) DRAWING PLANNING PREPARATION SYSTEMATICAL PLANNING ON BUILDING CONSTRUCTION DESIGN DEVELOPMENT EXTERNAL INTERNAL MATERIAL SPECIFICATION PREPARATION ON BIDDING ADMINISTRATION

TAMPAK MUKA

INTERIOR LORONG

INTERIOR ADMISI & R.DOKTER

DENAH RAWAT INAP

AMDAL STUDY WATER & WASTE TREATMENT ANALYSIS ENVIRONMENT ANALYSIS HIDROGRAPHY & LITHOGRAPHY STRUCTURE ANALYSIS SOCIO-CULTURE ANALYSIS

BUILDING CONSTRUCTION FIRST PHASE COSTRUCTION OUT PATIENS POLYCLINIC EMERGENCY ONEDAY CARE/SURGERY FARMACYS BACK OFFICE/ADMINISTRATION LAN/PAPERLESS INFORMATION SYSTEM SECOND PHASE COSTRUCTION IN PATIENT SUPPORTING SERVICES MRI CAT-SCANN 3D-COLOR USG MAIN OPERATING THEATRE/SURGERY THIRD PHASE CONSTRUCTION SPORT/RECREATION FACILITIES HOSPITAL MALL FLOURISH SHOPS BOOKSTORE DRUGSTORE RESTO / CAFE SPA DUTY FREE SHOPS

TAMPAK existing (1)

TAMPAK existing (2)

MANAGEMENT CONSTRUCTION PROGRAM PROJECT DEVELOPMENT QUANTITY & QUALITY ASSURANCE BUILDING CONSTRUCTION EVALUATION EQUIPMENT INSTALATION EVALUATION PROGRAM / BUILDING CONSTRUCTION MONITORING PROGRESS REPORT

EQUIPMENT INSTALLATION MEDICAL NON MEDICAL TIME SCHEDULING / MONITORING EQUIPMENT SPECIFICATION ASSURANCE INSTALLATION & OPERATING EQUIPMENT

KAMAR OPERASI & Ro “MINOR”

KAMAR OPERASI “ MAYOR”

INTERIOR RAWAT INAP

HOSPITAL MANAGEMENT STRATEGIC MANAGEMENT JOB DESC ANALYSIS SISTEM OPERATING PROCEDURE MANPOWER RECRUITMENT MANPOWER TRAINING LOGISTIC MANAGEMENT HUMAN RESOURCES MANAGEMENT MANAGEMENT INFORMATION SYSTEM NURSING MANAGEMENT FINANCING MANAGEMENT PRICING CAPITATION SYSTEM PUBLIC-PRIVATE MIX

SOFT OPENING TRIAL AND ERROR MONITORING CONTROLLING EVALUATION CORRECTING

Costing Analysis Data Up-date 2013/2014 Activities Pathway Unit cost assessment of each activities Total Cost Suggest best policy options according to the result

DRAFT RINCIAN ANGGARAN KEBUTUHAN TAHAPAN KEGIATAN Unit cost BIAYA TOTAL BIAYA Up-date FS, MP, AMDAL Paket Rp 1.000.000.000 Up-date Detail Engineering Design + Interior Design 2% NILAI KONSTRUKSI Rp Up-date Konstruksi / finishing … m2 @ Manajemen Konstruksi 3% NILAI KONSTRUKSI Inst.alat medis & non Tim Konsultan Hospital Management 28 bln @ Soft opening. 12 bln @ Operasional RS / Modal kerja 5 thn 5 x 12 bln @ T O T A L Rp ( + dlll)

TAHAPAN BIAYA & WAKTU 4 BLN 5 BLN 8-10 BLN 12 BLN 60 BLN T O T A L TAHAPAN KEGIATAN 4 BLN 5 BLN 8-10 BLN 12 BLN 60 BLN Up-date FS, MP, AMDAL X Up-date Detail Engineering Design + Interior Design Up-date Konstruksi / finishing Mekanikal+Elektrikal Current assets Tanah + Bangunan Manajemen Konstruksi Inst.alat medis & non Tim Konsultan Hospital Management Soft opening. Operasional RS / Modal kerja 5 thn T O T A L

Manajemen Proyek RS INVESTOR ??????? PEMILIK KONSULTAN

TERIMA KASIH