Ronnie Rivany ® Health & Hospital Economist Perencanaan Pembangunan AL RAHMAN SUBANG INTERNATIONAL HOSPITAL 2013/2014 Ronnie Rivany ® Health & Hospital Economist
KARAKTERISTIK INDUSTRI KESEHATAN
KONSEP DASAR Ronnie Rivany ® Health & Hospital Economist
DEVELOPMENT FEASIBILITY STUDY ANALYSIS OF EXTERNAL ASPECT DEMOGRAPHICS GEOGRAPHICS COMPETITOR…etc ANALYSIS OF HEALTH ASPECT EPIDEMIOLOGY MAN POWER FACILITIES. .etc No of beds, no of specialists STRATEGIC BUSINESS UNIT Total amount in $, Budgeting Break Even Point ???? Feasible or not ??????
Grafik Perkembangan Cash Flow Alternatif Prediksi BEP dicapai pada tahun ke-10
JENIS LAYANAN
LAYANAN PENUNJANG
MASTER PLAN + BLOCK PLAN HEALTH SERVICES LOCATION IN PATIENT OUT PATIENT SUPPORTING PATIENT FLOW ZONING SITE PLAN BIRD EYE VIEW MODEL ON SCALE 1:100 etc
Master Plan RSUD BARI PALEMBANG A POLIKLINIK (3LT) B UGD C CAFÉ D RADIOLOGI, FARMASI, LAB, INSTALASI PENUNJANG DIAGNOSTIK, BANK DARAH E REKAM MEDIS F ADMINISTRASI G BEDAH SENTRAL H R KEBIDANAN DAN KANDUNGAN I HEMODIALISA, CSSD, REHAB MEDIK, ANESTESI, PATOLOGI ( 2LT) J ICCU K ICU L RWT INAP KELAS 1 (2 LT) M RWT INAP KLS 2 (2 LT) N RWT INAP KELAS 3 O RWT INAP VIP P RWT INAP VVIP Q DAPUR R LAUNDRY S WORK SHOP T GENSET U IPAL DAN INSENERATOR V JENAZAH W TPS X MESJID Y GSG Z KANTIN 1 PERPUSTAKAAN 2 KELAS ( 2 LT ) 3 RUMAH DOKTER 4 ASRAMA ( 3 LT ) Contoh Master Plan RSUD BARI PALEMBANG X C Y B A I E H D Z G K 1 F 2 J 3 L 2 N O 3 P 2 M O 4 T S R Q U 4 V W
Contoh Master Plan RSUD BARI PALEMBANG
Contoh Master Plan Pengembangan RSUD KUNINGAN
DED (Detail Enginering Design) DRAWING PLANNING PREPARATION SYSTEMATICAL PLANNING ON BUILDING CONSTRUCTION DESIGN DEVELOPMENT EXTERNAL INTERNAL MATERIAL SPECIFICATION PREPARATION ON BIDDING ADMINISTRATION
TAMPAK MUKA
INTERIOR LORONG
INTERIOR ADMISI & R.DOKTER
DENAH RAWAT INAP
AMDAL STUDY WATER & WASTE TREATMENT ANALYSIS ENVIRONMENT ANALYSIS HIDROGRAPHY & LITHOGRAPHY STRUCTURE ANALYSIS SOCIO-CULTURE ANALYSIS
BUILDING CONSTRUCTION FIRST PHASE COSTRUCTION OUT PATIENS POLYCLINIC EMERGENCY ONEDAY CARE/SURGERY FARMACYS BACK OFFICE/ADMINISTRATION LAN/PAPERLESS INFORMATION SYSTEM SECOND PHASE COSTRUCTION IN PATIENT SUPPORTING SERVICES MRI CAT-SCANN 3D-COLOR USG MAIN OPERATING THEATRE/SURGERY THIRD PHASE CONSTRUCTION SPORT/RECREATION FACILITIES HOSPITAL MALL FLOURISH SHOPS BOOKSTORE DRUGSTORE RESTO / CAFE SPA DUTY FREE SHOPS
TAMPAK existing (1)
TAMPAK existing (2)
MANAGEMENT CONSTRUCTION PROGRAM PROJECT DEVELOPMENT QUANTITY & QUALITY ASSURANCE BUILDING CONSTRUCTION EVALUATION EQUIPMENT INSTALATION EVALUATION PROGRAM / BUILDING CONSTRUCTION MONITORING PROGRESS REPORT
EQUIPMENT INSTALLATION MEDICAL NON MEDICAL TIME SCHEDULING / MONITORING EQUIPMENT SPECIFICATION ASSURANCE INSTALLATION & OPERATING EQUIPMENT
KAMAR OPERASI & Ro “MINOR”
KAMAR OPERASI “ MAYOR”
INTERIOR RAWAT INAP
HOSPITAL MANAGEMENT STRATEGIC MANAGEMENT JOB DESC ANALYSIS SISTEM OPERATING PROCEDURE MANPOWER RECRUITMENT MANPOWER TRAINING LOGISTIC MANAGEMENT HUMAN RESOURCES MANAGEMENT MANAGEMENT INFORMATION SYSTEM NURSING MANAGEMENT FINANCING MANAGEMENT PRICING CAPITATION SYSTEM PUBLIC-PRIVATE MIX
SOFT OPENING TRIAL AND ERROR MONITORING CONTROLLING EVALUATION CORRECTING
Costing Analysis Data Up-date 2013/2014 Activities Pathway Unit cost assessment of each activities Total Cost Suggest best policy options according to the result
DRAFT RINCIAN ANGGARAN KEBUTUHAN TAHAPAN KEGIATAN Unit cost BIAYA TOTAL BIAYA Up-date FS, MP, AMDAL Paket Rp 1.000.000.000 Up-date Detail Engineering Design + Interior Design 2% NILAI KONSTRUKSI Rp Up-date Konstruksi / finishing … m2 @ Manajemen Konstruksi 3% NILAI KONSTRUKSI Inst.alat medis & non Tim Konsultan Hospital Management 28 bln @ Soft opening. 12 bln @ Operasional RS / Modal kerja 5 thn 5 x 12 bln @ T O T A L Rp ( + dlll)
TAHAPAN BIAYA & WAKTU 4 BLN 5 BLN 8-10 BLN 12 BLN 60 BLN T O T A L TAHAPAN KEGIATAN 4 BLN 5 BLN 8-10 BLN 12 BLN 60 BLN Up-date FS, MP, AMDAL X Up-date Detail Engineering Design + Interior Design Up-date Konstruksi / finishing Mekanikal+Elektrikal Current assets Tanah + Bangunan Manajemen Konstruksi Inst.alat medis & non Tim Konsultan Hospital Management Soft opening. Operasional RS / Modal kerja 5 thn T O T A L
Manajemen Proyek RS INVESTOR ??????? PEMILIK KONSULTAN
TERIMA KASIH