KERANGKA SISTEM OPERASI PEMBINAAN KONSTRUKSI

Slides:



Advertisements
Presentasi serupa
PARAGRAF, GAMBAR DAN BINGKAI
Advertisements

WordArt & Drawing.
Pertemuan 2 KOMPUTER APLIKASI Tabel dan Grafik.
KOLOM KORAN, DROP CAP, TEXT DIRECTION, HEADER & FOOTER, PAGE NUMBER , TABEL PERTEMUAN 3.
PENGENALAN MICROSOFT POWER POINT 2007
PAKET PROGRAM NIAGA TEKNIK KOMPUTER
BINDIKLAT Kebijakan Direktorat Departemen Pendidikan Nasional
Penjelasan Umum Ms. Powerpoint
EDITING TEKS PERTEMUAN 2.
Ega puspitriani Pendidikan B. Jepang 2 A
DESI PIBRIANA.
EDITING TEKS PERTEMUAN 2.
The steps to work with Power Point click Start> All Programs> Microsoft Office> Microsoft Office PowerPoint2007 klik Start>All Programs>Microsoft.
Microsoft Word Pertemuan 1 D E W I.
PERKEMBANGAN TEKNOLOGI KOMPUTER. – BPM Pustekkom – Next.
Fithri Selva Jumeilah S.Kom
Microsoft Word Dicky Pratama S.Kom.
Memahami & Menyikapi Keterbukaan Informasi Publik
BADAN KEPEGAWAIAN DAERAH PEMERINTAH KABUPATEN KEDIRI
Are you ready for Cloud? Minggu ke 14
PERAN DITJEN BINA KONSTRUKSI
KAJIAN ANALISIS DAN KEBIJAKAN PENGEMBANGAN SISTEM INOVASI DAERAH (SIDA) DALAM PEMBANGUNAN DAERAH TAHUN 2015 PT. Secon Dwitunggal Putra.
PROGRES PELAKSANAAN KEGIATAN
Microsoft Word Merupakan program aplikasi pengolah kata yang paling banyak digunakan. Meskipun sudah ada versi terbaru dari Microsoft Word, yaitu Ms.
Materi TIK Kelas XII Semester Genap Membuat Dokumen Presentasi
Undang-Undang bidang puPR
Faded picture background with full-color overlay (Intermediate)
Direktorat Bina Intala Ditjen Binalattas
PRESENTASI KEPALA PUSAT PENGKAJIAN DAN PENGEMBANGAN KEBIJAKAN
Sekilas tentang PROGRAM READ.
Mekanisme Penilaian ANUGERAH PANGRIPTA NUSANTARA Tahun 2016
Community-Based Research & PERGURUAN TINGGI
TA DIREKTORAT JENDERAL BINA KONSTRUKSI
UPAYA PERCEPATAN SERTIFIKASI TENAGA KERJA KONSTRUKSI INDONESIA
PEMBERANTASAN TINDAK PIDANA KORUPSI
DIREKTUR KERJA SAMA DAN PEMBERDAYAAN
KAJIAN ANALISIS DAN KEBIJAKAN PENGEMBANGAN SISTEM INOVASI DAERAH (SIDA) DALAM PEMBANGUNAN DAERAH TAHUN 2015 PT. Secon Dwitunggal Putra.
Sosialisasi Dekonsentrasi Bidang Perumahan Tahun 2015
Peluang Permutasi, kombinasi.
INOVASI PENYELENGGARAAN PEMERINTAHAN DAERAH
DITJEN MANAJEMEN DIKDASMEN DEPARTEMEN PENDIDIKAN NASIONAL
HUMAN COMPUTER INTERACTION
PEMERIKSAAN PAJAK DIREKTORAT JENDERAL PAJAK.
TATA CARA PEMERIKSAAN PAJAK
Creative Industry (Advanced) Animated, overlapping color bars
PEMERIKSAAN PAJAK.
Presentasi dengan Microsoft Power Point
‘’PELUANG MASUK DUNIA USAHA’’
ORGANISASI DAN KEPEMIMPINAN
MANAJEMEN MUTU SDM DALAM MENINGKATKAN KINERJA PEGAWAI
KEBIJAKAN DAN STRATEGI PENINGKATAN PRODUKTIVITAS
1 2 3 Animated countdown timer on textured background (Difficult)
STRATEGI PENGEMBANGAN Kemahasiswaan DALAM MENCAPAI DAYA SAING
Jhanis Cahyo M. Reyhan Emirel M. Umar Abdul Aziz
CONTOH PELANGGARAN HAM Di Indonesia
PERATURAN MENTERI KEUANGAN tentang TATA CARA PEMERIKSAAN PAJAK
TEKNOLOGI INFORMASI DAN KOMUNIKASI
Indeks Kualitas Lingkungan Hidup
engoperasikan Aplikasi Presentasi s. Office Powerpoint 2007
TEORI KINETIK GAS XI MIPA - 4 Agung Nurdiansyah Cici Masruroh
REVOLUSI BUDAYA KERJA PELAYANAN PUBLIK
I Wayan Sumendra PROSES BELAJAR-MENGAJAR ( PBM ) OLEH
PENGELOLAAN JENIS USAHA PEREKONOMIAN DI INDONESIA
Suhandi Wiratama. Before I begin this presentation, I want to thank Mr. Abe first. He taught me many things about CorelDRAW. He also guided me when I.
PENERIMAAN PESERTA DIDIK BARU (PPDB)
kita bisa mengubah arah penulisan teks dalam Text Box. Langkah
Quality Management System (ISO 9001) The world's most recognised quality management standard Kelompok 2 : 1.Puji Susanti 2.Marni 3.Siti Jahroni Daulay.
Zoho mail is an integrated Docs Online Document Management System. Zoho mail provides user to receive and send mails in such an easy way. Are you facing.
Hukum Islam Tentang Penyembelihan Hewan.
Kebijakan pengaturan kelembagaan jasa konstruksi
Transcript presentasi:

KERANGKA SISTEM OPERASI PEMBINAAN KONSTRUKSI DIREKTORAT JENDERAL BINA KONSTRUKSI KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT DAERAH Disampaikan Oleh Sesditjen Bina Konstruksi Palembang, 8 Maret 2016 PUSAT KERANGKA SISTEM OPERASI PEMBINAAN KONSTRUKSI 1

PROCESS MODEL Shared values Co-mission Compelling vision Stakeholder needs Clear strategy Pathfinding Result Work on direction Win-win agreements Understand the whole : “don’t tamper” Trustworthiness Modeling Empowering Aligning Levels of empowerment Work on Self Work with people Work on System Leadership style Align the parts: “the six rights” Conditions of empowerment

VISI MISI PEMBINAAN KONSTRUKSI Meningkatkan Kualitas Hidup Manusia Indonesia Meningkatkan Produktivitas Rakyat dan Daya Saing Di Pasar Internasional Mewujudkan Kemandirian Ekonomi Dengan Menggerakkan Sektor- sektor Strategis Ekonomi Domestik (NAWA CITA PRESIDEN RI BUTIR 5,6 DAN 7) UUJK 18/99 1. Iklim Pengusahaan 2. Tertib Penyelenggaraan 3. Partisipasi Masyarakat RPJMN/RENSTRA 2015-2019 Tertib Penyelenggaraan Pengunaan Dan Nilai Tambah DN Produktivitas BU & TK Volume Pengusahaan Penguasaan Pasar/ Kemandirian MISI Meningkatkan kapitalisasi konstruksi oleh badan usaha nasional. Meningkatkan persentase BUJK yang berkualifikasi besar. Meningkatkan budaya penerapan manajemen mutu, SMK3, tertib penyelenggaraan, dan konstruksi berkelanjutan. Meningkatnya produktivitas tenaga kerja konstruksi dan partisipasi masyarakat. Meningkatkan nilai tambah produk konstruksi unggulan. KEBUTUHAN STAKEHOLDER ISU REGIONAL & INTERNASIONAL DAN DAYA SAING REFORMASI BIROKRASI Pengembangan Konstruksi Nasional IklimUsaha Ketahanan Masyarakat Konstruksi (Mandiri, Berdaulat Daya Saing, Nilai Tambah) Pembinaan Penyelenggaraan Konstruksi Tertib dan Mutu Pembinaan Produktivitas Badan Usaha dan Sumber Daya Konstruksi Produk Unggulan Pemberdayaan Tenaga Kerja Konstruksi dan Masyarakat Kompetensi dan kesadaran masyarakat 3

TUGAS DAN FUNGSI DIREKTORAT JENDERAL BINA KONSTRUKSI Tugas: menyelenggarakan perumusan dan pelaksanaan kebijakan di bidang pembinaan konstruksi sesuai dengan ketentuan peraturan perundang-undangan. Fungsi: perumusan kebijakan di bidang pembinaan penyelenggaraan, kelembagaan, dan sumber daya di sektor konstruksi; pelaksanaan kebijakan di bidang pembinaan penyelenggaraan, kelembagaan, dan sumber daya di sektor konstruksi; pelaksanaan kebijakan di bidang pemberdayaan dan pengawasan penyelenggaraan konstruksi yang dilaksanakan oleh masyarakat dan pemerintah daerah; penyusunan norma, standar, prosedur, dan kriteria di bidang pembinaan konstruksi; pelaksanaan bimbingan teknis dan supervisi di bidang pembinaan penyelenggaraan, kelembagaan, dan sumber daya konstruksi; pelaksanaan evaluasi dan pelaporan di bidang pembinaan penyelenggaraan, kelembagaan, dan sumber daya konstruksi; pelaksanaan administrasi Direktorat Jenderal Bina Konstruksi; dan pelaksanaan tugas lain yang diberikan oleh Menteri. 4

PROSES BISNIS PEMBINAAN KONSTRUKSI DIREKTORAT JENDERAL BINA KONSTRUKSI DIREKTORAT FUNGSI REGULASI DAN PENGAWASAN INVESTASI PENYELENG-GARAAN SUMBER DAYA KOMPETENSI PEMBERDA-YAAN PENGATURAN KUANTITAS KUALITAS PENGAWASAN ` BALAI PEMBINAAN KONSTRUKSI KNOWLEDGE MANAGEMENT, ASSET MANAGEMENT, HUMAN CAPITAL MANAGEMENT ` World-class paradigms include the following: Quality—Competitiveness Holistic—System thinking Attitude—Anywhere, anyplace, anytime Agility—Quick to accept change Anticipation—Sense of urgency Faster—Speed of delivery Creativity—Moments of magic (these are customer delighters) Understanding—Customer expectations and delivering them (one plus more) Continuous quality improvement K/L LPJK Asosiasi Badan Usaha PT/Politeknik/SMK Asosiasi Profesi TPJKP/D Balai Satminkal LDK Badan Usaha Output PROYEK KONSTRUKSI Masyarakat Unit Sertifikasi Media Pengguna Penyedia Tenaga Kerja Masyarakat Outcome

Segitiga Pemasaran Jasa DIRJEN Janji Pembuktian Teknologi Staff Perwujudan Pelanggan

Multi Level Engagement DIRJEN Staff Pelanggan Pengguna Penyedia SDM Masyarakat Master Instruktur/Fasilitator Instruktur/Fasilitator

Multi Level Engagement Dit 3 Dit 2 Dit 1 Subdit ULP Subdit Provinsi Stakeholder (Satminkal/Swasta) Subdit Dit 4 Dit 5 BALAI Seksi Kepala Tukang Subdit LDK Subdit Kerjasama

Project Management Perspective Dalam Pembinaan Konstruksi HUMAN METHODS CULTURE ORGANIZATION PLANNING INFORMATION CONTROL

MPK BUJK SMM TERIMA KASIH KPBU TKDN Produk TKK SMM SMK3 2 0 1 6 DIREKTORAT JENDERAL BINA KONSTRUKSI | KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT MPK SMM BUJK TERIMA KASIH KPBU TKDN Stacked blocks with text Also in the Format Text Effects dialog box, click 3-D Rotation in the left pane. In the 3-D Rotation pane, click the button next to Presets, and then under Parallel click Isometric Left Down (first row, first option from the left). (Intermediate)   To reproduce the shape effects on this slide, do the following: On the Home tab, in the Slides group, click Layout, and then click Blank. In the Horizontal box, enter 3.75”. On the Home tab, in the Drawing group, click Shapes, and then under Rectangles click Rectangle (first option from the left). On the slide, drag to draw a rectangle. Drag the square blue adjustment handles on the left and right of the second text box to adjust the width so that the text is centered on the bottom left face of the orange cube. In the Vertical box, enter 4.77”. Under Drawing Tools, on the Format tab, in the Size group, click the Size and Position dialog box launcher. In the Format Shape dialog box, click Size in the left pane. In the Size pane, do the following: Select the second text box. On the Home tab, in the Clipboard group, click the arrow to the right of Copy, and then click Duplicate. Also in the Format Shape dialog box, click Position in the left pane. in the Position pane, do the following: In the Width box, enter 1.75”. Under Size and rotate, in the Height box, enter 1.75”. Select the third text box. Under Drawing Tools, on the Format tab, in the WordArt Styles group, click the Format Text Effects dialog box launcher. In the Format Text Effects dialog box, click 3-D Rotation in the left pane. In the 3-D Rotation pane, click the button next to Presets, and then under Parallel click Isometric Right Up (first row, second option from the left). Click in the third text box and edit the text. In the Horizontal box, enter 1.76”. In the From box, click Top Left Corner. Also in the Format Shape dialog box, click Fill in the left pane. In the Fill pane, select Solid fill, click the button next to Colors, and then click More Colors. In the Colors dialog box, on the Custom tab, enter values for Red: 223, Green: 96, Blue: 93. In the Vertical box, enter 3.17”. In the From box, click Top Left Corner. Under Drawing Tools, on the Format tab, in the Size group, click the Size and Position dialog box launcher. In the Size and Position dialog box, on the Position tab, do the following: In the Horizontal box, enter 3.81”. Also in the Format Shape dialog box, click Shadow in the left pane, and then do the following in the Shadow pane: Also in the Format Shape dialog box, click Line Color in the left pane, and then select No line.  Drag the square blue adjustment handles on the left and right of the third text box to adjust the width so that the text is centered on the bottom right face of the blue cube. In the Vertical box, enter 2.59”. Click the button next to Presets, and then under Outer click Offset Diagonal Bottom Left (first row, third option from the left). In the Transparency box, enter 70%. To reproduce the background effects on this slide, do the following: In the Blur box, enter 28 pt. In the Size box, enter 110%. On the Design tab, in the Background group, click Background Styles, and then click Format Background. In the Format Background dialog box, click Fill in the left pane, select Gradient fill in the Fill pane, and then do the following: In the Angle box, enter 190°. Also in the Format Shape dialog box, click 3-D Format in the left pane, and then do the following in the 3-D Format pane: In the Distance box, enter 20 pt. In the Type list, select Radial. Click the button next to Direction, and then click From Center (third option from the left). Under Depth, in the Depth box, enter 130 pt. Under Surface, click the button next to Material, and then under Standard click Warm Matte (second option from the left). Under Gradient stops, click Add gradient stops or Remove gradient stops until two stops appear in the slider. Click the button next to Lighting, and then under Neutral click Three Point (first row, first option from the left). Also under Gradient stops, customize the gradient stops as follows: Select the first stop in the slider, and then do the following: Also in the Format Shape dialog box, click 3-D Rotation in the left pane. In the 3-D Rotation pane, click the button next to Presets, and then under Parallel click Isometric Top Up (first row, third option from the left). Click the button next to Color, and then under Theme Colors click White, Background 1 (first row, first option from the left). In the Position box, enter 0%. Select the rectangle. On the Home tab, in the Clipboard group, click the arrow to the right of Copy, and then click Duplicate. Select the second (duplicate) rectangle. Under Drawing Tools, on the Format tab, in the Size group, click the Size and Position dialog box launcher. In the Format Shape dialog box, click Position in the left pane. In the Position pane, do the following: Select the next stop in the slider, and then do the following: In the Transparency box, enter 0%. In the Position box, enter 100%. Click the button next to Color, and then under Theme Colors click White, Background 1, Darker 35% (fifth row, first option from the left). In the Horizontal box, enter 4.23”. In the From box, click Top Left Corner. Also in the Format Shape dialog box, click Fill in the left pane. In the Fill pane, select Solid fill, click the button next to Color, and then click More Colors. In the Colors dialog box, on the Custom tab, enter values for Red: 247, Green: 154, and Blue: 91. Select the second rectangle. On the Home tab, in the Clipboard group, click the arrow to the right of Copy, and then click Duplicate. Select the third rectangle. Under Drawing Tools, on the Format tab, in the Size group, click the Size and Position dialog box launcher. In the Format Shape dialog box, click Position in the left pane. In the Position pane, do the following: Also in the Format Shape dialog box, click Fill in the left pane. In the Fill pane, select Solid fill, click the button next to Color, and then click More Colors. In the Colors dialog box, on the Custom tab, enter values for Red: 93, Green: 199, and Blue: 217. In the Vertical box, enter 1”. In the From box, click Top Left Corner. In the Horizontal box, enter 3”. In the From box, click Top Left Corner. Also in the Format Shape dialog box, click Shadow in the left pane. In the Shadow pane, click the button next to Presets, and then click No Shadow. To add text to this slide, do the following: On the Insert tab, in the Text group, click Text Box. Enter text in the text box, select the text, and then on the Home tab, in the Font group, select Franklin Gothic Medium Cond from the Font list and then select 40 from the Font Size list. Select the text box. Under Drawing Tools, on the Format tab, in the WordArt Styles group, click the Format Text Effects dialog box launcher. In the Format Text Effects dialog box, click Text Fill in the left pane. In the Text Fill pane, select Solid fill, click the button next to Color, and then under Theme Colors click Black, Text 1 (first row, second option from the left). On the Home tab, in the Paragraph group, click Center to center the text in the text box. Also in the Format Text Effects dialog box, click Text Box in the left pane. In the Text Box pane, under Text layout, in the Text direction list, select Rotate all text 90°. Also in the Format Text Effects dialog box, click 3-D Rotation in the left pane. In the 3-D Rotation pane, click the button next to Presets, and then under Parallel click Isometric Top Up (first row, third option from the left). Under Drawing Tools, on the Format tab, in the bottom right corner of the Size group, click the Size and Position dialog box launcher. In the Format Shape dialog box, click Position in the left pane. In the Position pane, do the following: Drag the square blue adjustment handles on the top and bottom of the text box to adjust the height so that the text is centered on the top face of the red cube. In the Vertical box, enter 3.35”. In the Horizontal box, enter 2.21”. Select the text box. On the Home tab, in the Clipboard group, click the arrow to the right of Copy, and then click Duplicate. Click in the second text box and edit the text. Select the second text box. Under Drawing Tools, on the Format tab, in the WordArt Styles group, click the Format Text Effects dialog box launcher. In the Format Text Effects dialog box, click Text Box in the left pane. In the Text Box pane, under Text layout, in the Text direction list, select Horizontal. Produk SMM TKK SMK3

BUSINESS PROCESS FOKUS PADA PENGEMBANGAN INDUSTRI KONSTRUKSI IN-BOUND ACTIVITY SEKRETARIAT JENDERAL BINA KONSTRUKSI DIREKTORAT 1 Subdit Penyiapan Kebijakan Investasi Infrastruktur Subdit Sinkronisasi Evaluasi Investasi Infrastruktur Subdit Fasilitasi dan Mitigasi Resiko Investasi Infrastruktur DIREKTORAT 2 Subdit Sistem Penyelengga- raan Subdit Kontrak Konstruksi Subdit Konstruksi Berkelanjutan DIREKTORAT 3 Subdit Kelembagaan Subdit Material dan Peralatan Konstruksi Subdit Teknologi Konstruksi dan Produk Dalam Negeri DIREKTORAT 4 Subdit Standar dan Materi Kompetensi Subdit Penerapan Kompetensi Subdit Pengembangan Profesi Jasa Konstruksi DIREKTORAT 5 Subdit Kerjasama Subdit Pemberdayaan Wilayah 1 Subdit Pemberdayaan Wilayah 2 Subdit Pemberdayaan Wilayah 3 TATA USAHA TATA USAHA TATA USAHA TATA USAHA BALAI - BALAI BUSINESS PROCESS FOKUS PADA PENGEMBANGAN INDUSTRI KONSTRUKSI Subdit Pasar Infrastruktur Subdit Manajemen Mutu Subdit Usaha Jasa Konstruksi Subdit Produktifitas DIREKTORAT BINA INVESTASI INFRASTRUKTUR DIREKTORAT BINA PENYEMEGGARAAN JASA KONSTRUKSI DIREKTORAT BINA KELEMBAGAAN DAN SUMBER DAYA JASA KONSTRUKSI DIREKTORAT BINA KOMPETENSI DAN PRODUKTIFITAS KONSTRUKSI DIREKTORAT KERJASAMA DAN PEMBERDAYAAN

Dit. Kelembagaan   Dit. Penyelenggaraan Dit. Investasi  Dit. Produktivitas  Dit. Kerjasama 

Nilai-nilai Misi bersama Visi yang menarik Kebutuhan Stakeholder Strategi yang jelas Pencarian arah Hasil Bekerja sesuai tujuan Kesepakatan yang saling menguntungkan Pengertian terhadap sistem: “jangan merusak sistem” Kepercayaan Modeling Pemberdayaan Penyesuaian Tingkat pemberdayaan Kesadaran Bekerja dengan orang lain Bekerja dalam sistem Gaya kepemimpinan Penyesuaian Pembagian peran : “the six rights” Kondisi Pemberdayaan

BUSINESS PROCESS Keterkaitan antar direktorat dalam menyelenggarakan tugas dan fungsi Direktorat Jenderal Bina Konstruksi sangat besar Terhentinya satu proses di salah satu Direktorat akan menyebabkan terkendalanya pelaksanaan tugas dari Direktorat lainnya

TERIMA KASIH ©2016|PE DIREKTORAT JENDERAL BINA KONSTRUKSI KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT TERIMA KASIH ©2016|PE