VIII. SUMBERDAYA MANUSIA DALAM MANAJEMEN OPERASI

Slides:



Advertisements
Presentasi serupa
Bab 6 PENGUKURAN WAKTU KERJA DENGAN METODE PENGUKURAN LANGSUNG
Advertisements

Tahapan information engineering
Dewi Hardiningtyas, ST. MT. MBA. July ErgoPro dikerjakan secara INDIVIDU. Tahap-tahap pengerjaan Masuk ke link :
Pertemuan VII Sumber Daya Manusia dan Desain Pekerjaan
Chapter 4 The Analysis and Design of Work
PEMERIKSAAN DAN PENGUJIAN KUALITAS KEKUATAN SUMBER DAYA MANUSIA
Process Flow Diagram (PFD) and
Varable Control Chart Individual, Cumulative Sum, Moving-Average, Geometric Moving-Average, Trend, Modified, Acceptance.
Komunikasi & Informasi
Tahun Pendapatan Nasional (milyar Rupiah) ,6 612,7 630, ,9 702,3 801,3 815,7.
LABOR : CONTROLLING AND ACCOUNTING FOR COSTS
Pekerja : Pengendalian dan Akuntansi Biaya Pekerja
Pengukuran Waktu Tidak Langsung
MultiMedia by Stephen M. Peters© 2001 South-Western College Publishing Chapter 9 Production Management Introduction to.
Tujuan : Mampu mengukur dan menentukan waktu baku
1 Pendahuluan Pertemuan 12 Matakuliah: H0062/Teori Sistem Tahun: 2006.
Materi. Introduction In this discussion the appliaction of maintainability to the design process is addressed. The maintainability design process is similar.
{ Ethics Training. Formal Non Formal E-training (Computer Based) Off-the-Job On-the-Job Training Methods.
STANDARD OPERATIONS. DEFINISI STANDARD OPERATIONS  Kumpulan standar-standar yang memberikan gambaran akurat dan lengkap semua aspek dari sebuah tugas,
9 Chapter Production Management Introduction to
Manajemen SDM (Wrap Up)
Job analysis & Evaluation
SAP-11 HUMAN RESOURCE MANAGEMENT
ANALISIS & EVALUASI JABATAN
Studi Kasus-1 Bapak Arsyad membuka usaha Apotik 24 jam. Awal berdiri apotik, ia mempekerjakan 1 orang Apoteker dan 4 orang Tenaga Kefarmasian. Untuk optimalisasi.
Starting selection right place” Objectives :
Work sampling.
PENDAHULUAN Penelitian kerja dan analisa metode kerja memusatkan perhatian pada bagaimana suatu pekerjaan akan diselesaikan Aplikasi prinsip dan teknik.
ANALISA KESELAMATAN KERJA
PERANCANGAN KERJA PETA-PETA KERJA.
METODE & PENGUKURAN KERJA
Evaluating Employee Performance
9 Chapter Production Management Introduction to
PERANCANGAN, PENGUKURAN KERJA, DAN ERGONOMI
Penelitian Kerja (Work Design/Study)
PEMILIHAN SISTEM.
Model Konvensional.
9 Chapter Production Management Introduction to
Pengantar : Methods, Standard, and Work Design
Jawablah pertanyaan-pertanyaan berikut ini dengan uraian singkat dan jelas! Sebutkan dan jelaskan tahap-tahap proses disain produk yang berupa barang,
SISTEM INFORMASI ENTERPRISE
Pengantar Bisnis 7 Sessi.
SISTEM INFORMASI ENTERPRISE
Oleh : Prof. Dr. Ir. H. Iman Sudirman, DEA
Human-Computer Interaction (HCI)
IMPLEMENTING THE PROCEDURE OF HEALTH, SAFETY AND WORK SECURITY
Manajemen Produksi.
Pengukuran Waktu Baku Cara Tidak Langsung
Tujuan : Mampu mengukur dan menentukan waktu baku
Pengukuran Waktu Tidak Langsung
Human-Computer Interaction (HCI)
Predetermined Motion Time System
Pertemuan 2 Representasi Digital Sinyal Multimedia
IMPLEMENTING THE PROCEDURE OF HEALTH, SAFETY AND WORK SECURITY
4 plan.
BAB 12 ANALISI JABATAN. BAB 12 ANALISI JABATAN.
Systems Design: Job-Order costing
#7_WORK MEASUREMENT ANALISA DAN PENGUKURAN KERJA
Manajemen Proyek
#10_STANDARD DATA SYSTEM ANALISA DAN PENGUKURAN KERJA
Pengantar : Methods, Standard, and Work Design
#8_STOPWATCH TIME STUDY ANALISA DAN PENGUKURAN KERJA
#11_PREDETERMINED MOTION TIME SYSTEMS (PMTS) ANALISA DAN PENGUKURAN KERJA For more sample templates, click the File tab, and then on the New tab, click.
O R G A N I Z I N G. O R G A N I Z I N G Purpose of Organizing Human Treatment of Employees Optimum use of resources Helps to attain organizational.
Pertemuan 6 Mappa Panglima Banding. 2 COST DRIVER: Definition Is a factor that causes, “drives,” an activity’s costs. LO 4.
desain sistem kerja PERTEMUAN – 10 Mata Kuliah: Manajemen Operasional
Priyatmadi Teknik Elektro FT UGM. priyatmadi2 What is a Process Flow Diagram?
9 Chapter Production Management Introduction to
Methods Engineering “Motion Study” Hardianto Iridiastadi, Ph.D.
Work System Design “Work Measurement” Hardianto Iridiastadi, Ph.D.
Transcript presentasi:

VIII. SUMBERDAYA MANUSIA DALAM MANAJEMEN OPERASI A. PERKEMBANGAN MANAJEMEN SUMBERDAYA MANUSIA MANAJEMEN ILMIAH PENDEKATAN PERILAKU Perluasan pekerjaan secara horizontal Perluasan pekerjaan secara vertikal Rotasi Pekerjaan

KECENDERUNGAN KONTEMPORER Fleksibilitas pekerjaan Pertanggungjawaban dan pemberdayaan Peningkatan keahlian dan kemampuan Pelibatan pekerja Kompensasi pekerja Teknologi dan otomatisasi Pekerja-pekerja temporer Kepuasan kerja

B. ELEMEN-ELEMEN DISAIN PEKERJAAN ANALISIS TUGAS (TASK ANALYSIS) ANALISIS PEKERJA (WORKER ANALYSIS) ANALISIS LINGKUNGAN PEKERJAAN C. ANALISIS PEKERJAAN PROCESS FLOWCHART WORKER-MACHINE CHART

ANALISIS TUGAS (TASK ANALYSIS) Description of task to be performed Task sequence Function of tasks Frequency of tasks Criticality of tasks Relationship with order jobs/tasks Performance requirement Information requirement Control requirement Error possibilities Task durations Equipment requirement

ANALISIS PEKERJA (WORKER ANALYSIS) capability requirement Performance requirement Evaluation Skill level Job training Physical requirement Mental stress Boredom Motivation Number of workers Level of responsibility Monitoring level Quality responsibility Empowerment level

ANALISIS LINGKUNGAN PEKERJAAN ( Environmental Analysis ) Workplace location Process location Temperature humidity Lighting Ventilation safety Logistics Space requirement Noise Vibration

Simbol-simbol Flow-Chart PROCESS FLOWCHART Simbol-simbol Flow-Chart

Contoh : Process Flowchart

Contoh : Process Flowchart

Contoh : Process Flowchart

WORKER-MACHINE CHART

D. PENGUKURAN PEKERJAAN STOPWACH TIME STUDI NUMBER OF CYCLE ELEMENTAL TIME FILES PREDETERMINED MOTION TIME WORK SAMPLING LEARNING CURVE

ELEMENTAL TIME FILES Elemental standard time files are predetermine job element time PREDETERMINED MOTION TIME Predetermined Motion Time are predetermined times for basic micromotions

Langkah-langkah Stopwatch Time Study STOPWACH TIME STUDY Langkah-langkah Stopwatch Time Study Establish the standard job method Break down the job into element Study the job Rate the workers performance Compute the average time Compute the normal time Normal time = (elemental average time)(Rating Factor) Nt = (t)(RF) Normal Cycle Time = Summing the elemental mormal times Compute the standard time Standard time = (Normal Cycle Time)(1+Allowance Factor) ST = (NT) (1+AF)

NUMBER OF CYCLE

WORK SAMPLING Langkah-langkah Work Sampling Define the job activities Determine the number of observations in the work sample Determine the length of sampling period Conduct the work sampling study and record the observations Periodically recompute the number of observations

LEARNING CURVE Processing time per unit Unit produced