Presentasi sedang didownload. Silahkan tunggu

Presentasi sedang didownload. Silahkan tunggu

E L E C T R I C I T Y F O R A B E T T E R L I F E.

Presentasi serupa


Presentasi berjudul: "E L E C T R I C I T Y F O R A B E T T E R L I F E."— Transcript presentasi:

1 E L E C T R I C I T Y F O R A B E T T E R L I F E

2 PRODUKSI BERDASARKAN TIPE BAHAN BAKAR (FUEL-MIX) HPP : 1.047,- Rp/KWH HPP : 1.112,- Rp/KWH HPP : 1.209,- Rp/KWH HPP : 1.138,- Rp/KWH PLTD Payoselincah OFF Mulai 1 April 2014

3 E L E C T R I C I T Y F O R A B E T T E R L I F E 87,4% OVERALL EFFECTIVENESS EQUIPMENT EFOR

4 E L E C T R I C I T Y F O R A B E T T E R L I F E Lost Output Sektor Jambi (Tidak termasuk Sewa) Periode Semester (Januari - Juni) Analisa Pareto Lost Output PLTD/G Sektor Jambi FO & FD PLTG BH 1 15,9 (20 %) Total Potensi PLTD&G 441,12 11,40 (19,1 %) FO &FD PLTG BH 2 FO &FD PLTD 30,9 (51,1%) Reasons for Force Derated PLTD&G Periode Semester (Januari - Juni) Total 0,11 Temp.Oil header High Total Temperature Spread Trip(3x) 56.2 Crack 1st Stage nozzle and Temp.Spread TRIP High temperarture exhaust Oli Leackeg in Pipe SOGAV Fault 11,96 Total * Note: Gap yang berwarna Kuning telah diselesaikan

5 E L E C T R I C I T Y F O R A B E T T E R L I F E Lost Output Sektor Jambi (Tidak termasuk Sewa) Periode Semester (Januari - Juni) FO & FD PLTG BH 1 15,9 (20 %) Total Potensi PLTD&G 441,12 11,40 (19,1 %) FO &FD PLTG BH 2 FO &FD PLTD 30,9 (51,1%) Periode Semester (Juli- Desember) 56.2 FD&FO PLTG BH 1 3,8 Total Potensi PLTD&G 404,8 3,9 FD&FO PLTG BH 2 FD & FO PLTD 1,4 9,1 Lost Output Sektor Jambi (Tidak termasuk Sewa) *Angka dalam satuan GWH Analisa Pareto Lost Output PLTD/G Sektor Jambi

6 E L E C T R I C I T Y F O R A B E T T E R L I F E 89,61% OVERALL EFFECTIVENESS EQUIPMENT 2014 Strategi : 1. Mengurangi waktu masa pemeliharan periodik 2. Penggantian Filter Online

7 E L E C T R I C I T Y F O R A B E T T E R L I F E KINERJA PROSES

8 E L E C T R I C I T Y F O R A B E T T E R L I F E Computerize maintenence management system. Informasi data operasi dan pengusahaan pembangkit Formulir data operasi Sistim Informasi Heat rate dan Efficiency PembangkitPLTG PROGRAM (PENDUKUNG) TW PT.PLN (Persero) Sektor Pembangkitan Jambi Sistim Informasi Outage Manegement dan lifetime hot section gas turbine. Sistim Informasi Gudang PROGRAM PENDUKUNG 2014

9 E L E C T R I C I T Y F O R A B E T T E R L I F E Aktivitas sesuai jadwal Rencana 2014 Aktivitas proyek selesaiWORKPLAN

10 E L E C T R I C I T Y F O R A B E T T E R L I F E SIMPLE FLOWCHART OLIFE® DASHBOARD start Get data Dari database Elogsheet (per jam) VISUAL (GRAFIK, TABEL, TRENDING) HITUNG (ASME PTC-22): 1.Efficiency Plant 2.Efficiency Compressor Turbine 3.Efficiency Combustion 4.Heat Rate, NPHR, GPHR. finish REPORT start Input data material Hot Gas Section Input data Operasi (Start factor, Hour Factor) HASIL (lifetime,lif ecycle) Material History TRACKING AND CALCULATING LIFE (Hour Base/Start Based) DATA REFERENCE (MANUAL BOOK & EPRI OUTAGE PLANNER ACTIVITY (FORM/VIEW) OVERHAUL EXECUTION AND REPORT FINISH

11 E L E C T R I C I T Y F O R A B E T T E R L I F E NILAI KINERJA (SUMMARY)

12 E L E C T R I C I T Y F O R A B E T T E R L I F E

13 PROGRAM KERJA 2014 STRATEGY INISIATIFPROGRAM KERJA UTAMAKEGIATANSASARAN 1 Kualitas Product & Service 1 Meningkatkan Pasokan Pembangkit - Menambah Pembangkit Baru330 MW MW -Menurunkan Derating10 MW menjadi 5 MW 2 Melanjutkan Perang Padam - Menurunkan Kali Gangguan1,4 kali menjadi 1 kali -Menurunkan EFOR2,90% menjadi 1,5% 2 Effesiesi CAPEX & OPEX 1 Menurunkan Biaya Produksi - Optimalisasi Gas PS dan SG 1377 rp/kwh menjadi 1030 rp/kwh -Menurunkan Fuel Mixdari 2% menjadi 0,3% 2 Effesiensi Pengadaan Material Utama - LTSA Spare Part PLTMG WarstilaKontrak 5 Tahun -Kontrak KHS Material Rutin, Material Umum, ATK


Download ppt "E L E C T R I C I T Y F O R A B E T T E R L I F E."

Presentasi serupa


Iklan oleh Google