1 PENINGKATAN PENGENDALIAN PROSES BISNIS
UNTUK MENCAPAI WORLD CLASS SERVICES RAKOR TW-IV 2013, LAMPUNG 8-10 JANUARI 2014 E L E C T R I C I T Y F O R A B E T T E R L I F E

2 PRODUKSI BERDASARKAN TIPE BAHAN BAKAR (FUEL-MIX)
PLTD Payoselincah OFF Mulai 1 April 2014 HPP : 1.138,- Rp/KWH HPP : 1.209,- Rp/KWH HPP : 1.112,- Rp/KWH HPP : 1.047,- Rp/KWH

3 OVERALL EFFECTIVENESS EQUIPMENT
87,4% EFOR

4 Analisa Pareto Lost Output PLTD/G Sektor Jambi
Analisa Pareto Lost Output PLTD/G Sektor Jambi Lost Output Sektor Jambi (Tidak termasuk Sewa) Reasons for Force Derated PLTD&G Periode Semester (Januari - Juni) Periode Semester (Januari - Juni) 0,11 Total Potensi PLTD&G 441,12 56.2 FO &FD PLTG BH 2 Temp.Oil header High 30,9 (51,1%) Crack 1st Stage nozzle and Temp.Spread TRIP Total 11,96 FO &FD PLTD 15,9 (20 %) High temperarture exhaust Oli Leackeg in Pipe SOGAV Fault Total FO & FD PLTG BH 1 11,40 (19,1 %) * Note: Gap yang berwarna Kuning telah diselesaikan Temperature Spread Trip(3x) Total

5 Analisa Pareto Lost Output PLTD/G Sektor Jambi
Lost Output Sektor Jambi (Tidak termasuk Sewa) Lost Output Sektor Jambi (Tidak termasuk Sewa) Periode Semester (Januari - Juni) Periode Semester (Juli- Desember) Total Potensi PLTD&G 441,12 Total Potensi PLTD&G 404,8 56.2 9,1 FO &FD PLTG BH 2 30,9 (51,1%) FD&FO PLTG BH 2 1,4 3,8 FO &FD PLTD 15,9 (20 %) FD & FO PLTD FO & FD PLTG BH 1 11,40 (19,1 %) FD&FO PLTG BH 1 3,9 *Angka dalam satuan GWH

6 OVERALL EFFECTIVENESS EQUIPMENT 2014
89,61% Strategi : 1. Mengurangi waktu masa pemeliharan periodik 2. Penggantian Filter Online

7 KINERJA PROSES

8 PROGRAM PENDUKUNG 2014 PROGRAM (PENDUKUNG) TW-1 2014
PT.PLN (Persero) Sektor Pembangkitan Jambi GUDANG ONLINE ® Sistim Informasi Gudang IMAP – MAXIMO™ Computerize maintenence management system. OLIFE ® DASHBOARD Sistim Informasi Outage Manegement dan lifetime hot section gas turbine. DATABASE (SERVER) E-LOGSHEET ®DASHBOARD EFFICIENCY® DASHBOARD E-LOGSHEET ® FORM Informasi data operasi dan pengusahaan pembangkit Formulir data operasi Sistim Informasi Heat rate dan Efficiency PembangkitPLTG

9 WORKPLAN Aktivitas sesuai jadwal Rencana 2014 Aktivitas proyek selesai

10 TRACKING AND CALCULATING LIFE (Hour Base/Start Based)
SIMPLE FLOWCHART OLIFE® DASHBOARD EFFICIENCY® DASHBOARD start Input data material Hot Gas Section Input data Operasi (Start factor, Hour Factor) HASIL (lifetime,lifecycle) Material History TRACKING AND CALCULATING LIFE (Hour Base/Start Based) DATA REFERENCE (MANUAL BOOK & EPRI OUTAGE PLANNER ACTIVITY (FORM/VIEW) OVERHAUL EXECUTION AND REPORT FINISH start Get data Dari database Elogsheet (per jam) VISUAL (GRAFIK, TABEL, TRENDING) HITUNG (ASME PTC-22): Efficiency Plant Efficiency Compressor Turbine Efficiency Combustion Heat Rate, NPHR, GPHR. finish REPORT

11 NILAI KINERJA (SUMMARY)

12

13 Kualitas Product & Service
PROGRAM KERJA 2014 STRATEGY INISIATIF PROGRAM KERJA UTAMA KEGIATAN SASARAN 1 Kualitas Product & Service Meningkatkan Pasokan Pembangkit - Menambah Pembangkit Baru 330 MW MW Menurunkan Derating 10 MW menjadi 5 MW 2 Melanjutkan Perang Padam Menurunkan Kali Gangguan 1,4 kali menjadi 1 kali Menurunkan EFOR 2,90% menjadi 1,5% Effesiesi CAPEX & OPEX Menurunkan Biaya Produksi Optimalisasi Gas PS dan SG 1377 rp/kwh menjadi 1030 rp/kwh Menurunkan Fuel Mix dari 2% menjadi 0,3% Effesiensi Pengadaan Material Utama LTSA Spare Part PLTMG Warstila Kontrak 5 Tahun Kontrak KHS Material Rutin, Material Umum, ATK