Realisasi Progress Fisik Lapangan 72,78%
NOURAIAN PEKERJAAN KONTRAKREALISASI VOL SA T HARGA SATUANTOTAL HARGAVOLBOBOTJUMLAH HARGA 1PEKERJAAN PERSIAPAN Mobilisasi dan Demobilisasi 1,00Ls 39,000, ,250, Direksikeet / Kantor Proyek 1,00Ls 19,000, ,000, Papan Nama Proyek 1,00Ls 500, , Laporan, Dokumentasi Dan Asbuilt Drawing 1,00Ls 10,500, ,500, Pembersihan Lokasi 1,00Ls 14,000, ,500, Pengukuran Dan Pemasangan Bouwplank 1,00Ls 7,000, ,200, Listrik Dan Air Kerja 1,00Ls 6,500, ,250, TOTAL 1 (PEKERJAAN PERSIAPAN) ,200,000.00
NOURAIAN PEKERJAAN KONTRAKREALISASI VOL SA T HARGA SATUANTOTAL HARGAVOLBOBOTJUMLAH HARGA 2PEKERJAAN TALUD Galian Tanah583.07M³105, ,734, ,734, Timbunan Tanah Kembali145.77M³267, ,944, ,944, Pasir Urug46.36M³217, ,074, ,074, Pasangan Batu Karang Gunung 1 : 4 1,053.79M³1,618, , Pekerjaan Pipa PVC 2"319.65M¹18, ,806, ,806, Pancang Kayu1,200.00M'26, , TOTAL 2 (PEKERJAAN TALUD) 1,853,605, ,853,605,075.57
NOURAIAN PEKERJAAN KONTRAKREALISASI VOL SA T HARGA SATUANTOTAL HARGAVOLBOBOTJUMLAH HARGA 3PEKERJAAN DRAINASE Galian Tanah567.00M³105, ,033, ,033, Pasir Urug40.77M³217, ,859, ,859, Pasangan Batu Karang Gunung 1 : M³1,618, ,910, ,910, Plesteran 1 : 31,087.20M²129, ,474, TOTAL 3 (PEKERJAAN DRAINASE) 561,278, ,804,259.88
NOURAIAN PEKERJAAN KONTRAKREALISASI VOLSATHARGA SATUANTOTAL HARGAVOLBOBOTJUMLAH HARGA 4 PEKERJAAN DEUCKER Galian Tanah27.30M³105, ,890, ,890, Urug Tanah Kembali6.83M³267, ,823, Pas. Batu Karang 1 : M³1,618, ,372, Rabat Beton ad. 1 : 3 : 50.70M³1,413, , Beton K M³2,687, ,465, Tulangan252.97Kg16, ,200, Bekisting2.80M²102, , Plesteran13.30M²129, ,718, TOTAL 4 (PEKERJAAN DEUCKER) 39,746, ,890,524.00
NOURAIAN PEKERJAAN KONTRAKREALISASI VOLSATHARGA SATUANTOTAL HARGAVOLBOBOTJUMLAH HARGA 5 PEKERJAAN JALAN HOTMIX Mobilisasi/Demobilisasi Alat Berat 1.00Ls76,500, Penyiapan Badan Jalan1,170.00M²19, ,237, Lapis Pondasi Agregat Kls. A 78.00M³1,109, ,515, Lapis Pondasi Agregat Kls. B M³689, ,508, Lapis Resap Pengikat624.00Ltr21, ,282, Lapis Perekat234.00Ltr24, ,686, Lataston (HRS) Tebal 5 Cm 80.45Ton728, ,597, Aspal5.22Ton21,000, ,582, Aditif anti pengelupasan13.05Kg77, ,004, Bahan Pengisi (Filler) Tambahan 1,304.55Kg2, ,948, TOTAL 5 (PEKERJAAN JALAN HOTMIX) 483,863,198.88
NOURAIAN PEKERJAAN KONTRAKREALISASI VOLSATHARGA SATUANTOTAL HARGAVOLBOBOTJUMLAH HARGA 6 JEMBATAN TIMBANG a Pekerjaan Tanah Dan Pasir Galian Tanah28.98M³ 93, ,703, Urugan Pasir3.79M³ 217, , Urugan Tanah Kembali7.24M³ 104, , b Pekerjaan Pasangan Dan Beton Pondasi Batu Kali 1:42.52M³ 1,618, ,078, Cor Lantai Kerja1.90M³ 1,413, ,680, Pondasi Poer Plat 1. Beton K M³ 2,687, ,885, Tulangan626.83Kg 16, ,409, Bekisting19.20M² 225, ,326,451.20
NOURAIAN PEKERJAAN KONTRAKREALISASI VOLSATHARGA SATUANTOTAL HARGAVOLBOBOTJUMLAH HARGA Sloof 20/25 1. Beton K M³ 2,687, ,505, Tulangan118.84Kg 16, ,973, Bekisting8.40M² 238, ,006, Kolom 20/25 1. Beton K M³ 2,687, ,386, Tulangan188.28Kg 16, ,126, Bekisting12.15M² 446, ,429, Ring Balok 20/30 1. Beton K M³ 2,687, ,806, Tulangan Kg 16, ,498, Bekisting M² 455, ,727, Cor lantai Beton Bertulang 1. Beton K M³ 2,687, ,043, Tulangan 1, Kg 16, ,113, Bekisting M² 225, ,732,056.00
NO URAIAN PEKERJAAN KONTRAKREALISASI VOLSATHARGA SATUANTOTAL HARGAVOLBOBOTJUMLAH HARGA a Pekerjaan Atap Kuda-Kuda Kayu Klas I0.61M³ 8,662, ,305, Gording Kayu Klas II8.40M³ 4,735, ,776, Listplank Kayu Klas II30.40M³ 73, ,247, Atap Spandek Zincalume52.00M² 247, ,849, Nok atap spandeck8.00M' 115, , d Jembatan Timbang1.00Ls238,000, ,694, e Pekerjaan Perlengkapan Komputer Merk HP 15” LCD Monitor + Origina Windows Unit8,000, Dot Matric Epson Printer Lx KertasNCR Continuous Form 9-/12" x 11"/2 1.00Unit 4,000, Meja & Kursi Komputer1.00Unit3,000, TOTAL 6 (PEKERJAAN JEMBATAN TIMBANG) 433,886, ,694, JUMLAH3,464,107, ,399,446, PPN 10%346,410, ,944, JUMLAH TOTAL3,810,518, ,639,390, DIBULATKAN3,810,518, ,639,391, PROGRESS REALISASI FISIK S/D PERIODE BULAN VI = %