MODEL MONITORING DAN EVALUASI

Slides:



Advertisements
Presentasi serupa
Memulai agenda reformasi PBK di Indonesia – gambaran praktis mengenai langkah-langkah yang harus dilakukan dalam menyusun kerangka kerja Disajikan oleh.
Advertisements

Menentukan Arah Perubahan
PENGUKURAN KINERJA SC.
University of Wisconsin - Extension, Cooperative Extension, Program Development and Evaluation YOSEF TODARUNG Logic models
Oleh : Dr. Y. Harri Jalil, MM Neneng Barina, Sp.
Applied Information System Project Management
BAB 3 MONITORING DAN EVALUASI SUSTAINABLE DEVELOPMENT
Audit Internal Mutu Akademik(AIMA) Universitas Pendidikan Indonesia
AKUNTANSI SEKTOR PUBLIK
Anggaran Berbasis Kinerja
RENCANA KEGIATAN OPERASIONAL (ACTION PLAN)
Logical FRAMEWORK APPROACH Pendekatan kerangka logis
Workshop Implementasi Program Hibah Kompetisi berbasis institusi Dewan Pendidikan Tinggi Direktorat Jenderal Pendidikan Tinggi Departemen Pendidikan Nasional.
PERENCANAAN PENGAJARAN SEJARAH Hansiswany Kamarga.
RENCANA PENGEMBANGAN PERANGKAT LUNAK (RPPL)
Pengukuran dan Evaluasi Kinerja
Monitoring & Evaluasi.
Manajemen Risiko Proyek
INDONESIA INFRASTRUCTURE INITIATIVE IURSP – Monitoring dan Evaluasi IURSP – Monitoring and Evaluation Workshop 3 Steve Brown VicRoads International Projects.
TIPE PENGENDALIAN STRATEGI Pertemuan 26
FUNGSI MONITORING DAN EVALUASI
Manajemen Sumber Daya Teknologi Informasi
Evaluasi kegiatan humas
PENGANGGARAN BERBASIS KINERJA
Pengumpulan dan penilaian bukti audit
Sistem informasi manajemen (SIM)
MANAJEMEN RISIKO.
Audit Sistem Informasi berbasis Komputer
Sesi 1 │Monitoring dan Evaluasi
MONITORING & EVALUASI Master Trainer:.
MONITORING & EVALUASI PROMKES
Monitoring-Pengendalian Proyek
sistem pengukuran dan indikator kinerja kebijakan publik
Pengukuran Kinerja Sektor Publik
Penyusunan Renstra Kementerian/Lembaga
PEMERIKSAAN AKUNTANSI 2
STRUKTUR SISTEM PENGUKURAN KINERJA INDIVIDUAL METRICS METRIC SETS OVERALL PERFORMANCE MEASUREMENT SYSTEM.
PENGANGGARAN SEKTOR PUBLIK
ANALISIS PROSES EVALUASI KEBIJAKAN PUBLIK
MANAJEMEN RISIKO PROYEK
BAB 6 PERENCANAAN 1. PERENCANAAN 2. PROSES PERENCANAAN 3. PERENCANAAN SITUASIONAL 4. PERENCANAAN DAN TINGKATAN MANAJEMEN 5. HAMBATAN DAN PEMECAHAN MASALAH.
CA113 Pengantar Manajemen Bisnis
PLANNING / PERENCANAAN
Semester VII/Kelas A, B, C
EVALUASI, AUDIT, PELAPORAN DAN PENYELESAIAN PROYEK
Prinsip Monitoring Yang Baik
Pendekatan Logical Framework
PENGUKURAN KINERJA SEKTOR PUBLIK
CA113 Pengantar Manajemen Bisnis
MK. Perencanaan dan Evaluasi Program
The Administration of Development & The Development of Administration
AKUNTANSI MANAJEMEN MATERI-1 KONSEP-KONSEP DASAR AKUNTANSI MANAJEMEN
PENGAWASAN CONTROLING
PROGRAM MAGISTER MANAJEMEN STIE HAS
Kelompok 3 Aini Musfiroh
Keuangan Sekolah/Madrasah
PENYUSUNAN INDIKATOR KINERJA UTAMA SKPD
Managers ’ Performance and
PERENCANAAN (planning)
CA113 Pengantar Manajemen Bisnis
Kerangka Kerja IT Balanced Scorecard
SI702 Tata Kelola Sistem Informasi Pertemuan #9
Kuliah 2: Konsep Monitoring 5 September 2018
Monitoring & Evaluasi Framework Dalam Monev.
 Kinerja (performance) adalah gambaran mengenai tingkat keberhasilan pelaksanaan suatu kegiatan /program dalam mewujudkan sasaran, tujuan, misi dan.
Monitoring And Evaluation Communities and Education Program in Aceh CEPA - Phase 2 Presented by Irwansya Yahya.
EVALUASI PELATIHAN ISTIANA,S.Psi.,M.Pd.
PENGANGGARAN BERBASIS KINERJA
Logical framework Project Purpose Results Activities Means Costs
Tuesday 9h.00 – 10h.00 PCM training Prospect.
Transcript presentasi:

MODEL MONITORING DAN EVALUASI Dr. Iis Prasetyo, MM

Result-Based Management RBM berusaha untuk memperbaiki akuntabilitas dan efektivitas manajemen melalui: a. menentukan hasil realistik yang diharapkan; b. monitoring kemajuan melalui raihan hasil yang diharapkan; c. Menggunakan hasil dalam pembuatan keputusan manajemen; d. Melaporkan kinerja manajemen.

Impact (overall Goal) Outcomes Outputs Activities Inputs THE RESULT CHAIN Impact (overall Goal) Outcomes Outputs Activities Inputs Hasil jangka panjang (positif/negatif) baik yang disengaja ataupun tidak Hasil jangka menengah dari hasil sebuah kegiatan Produk, barang atau layanan sebagai hasil dari kegiatan Tindakan atau kinerja yang dilakukan sehingga input digunakan untuk menghasilkan keluaran yang spesifik Keuangan, manusia, sumber daya material yang diperlukan untuk melakukan suatu kegiatan Hasil

Monitoring dan Evaluasi Monitoring merupakan fungsi berkelanjutan yang menggunakan pengumpulan data secara sistematis berdasarkan indikator untuk memberikan informasi pada manajemen dan stakeholder yang berhubungan dengan kemajuan atau hasil yang diraih setelah menggunakan dana yang telah dialokasikan. Evaluasi merupakan penilaian yang sistematis dan objektif yang berkaitan dengan pelaksanaan atau hasil dari program, kebijakan berdasarkan perecanaan implementasi dan hasilnya. Tujuannya untuk mengetahui efektivitas dan efisiensi hasil, dampak maupun keberlanjutannya.

Model Monitoring dan Evaluasi Logical Framework (kerangka kerja logis) Logframe matrix (matriks logframe)

Kerangka Kerja Logis Goal Purpose Outputs Activities Inputs (resources) Hasil tertinggi dari hasil sebuah kegiatan atau operasional Situasi yang telah diperbaiki, dimana kegiatan operasional diharapkan memberikan sumbangan yang signifikan Produk, barang atau layanan sebagai hasil dari kegiatan Tindakan atau kinerja yang dilakukan sehingga input digunakan untuk menghasilkan keluaran yang spesifik Keuangan, manusia, sumber daya material yang diperlukan untuk melakukan suatu kegiatan Hasil

Performance indicators The Logframe Matrix Logframe hierarcy Performance indicators Means of verification Assumption and risk Goal Higher objective to which this operation, along with other , is intended to contribute Impact Indicators (increasingly standardised) to measure programe performance The program evaluation system (Goal-to-Super-Goal) Risk regarding strategic impact Purposes The outcomes of an operation. The change in beneficiery behaviour, system or institutional performance because of the combined output strategy and key assumptions Outcomes Measures that describe the accomplishment of the purpose. The value, benefit, and return on investment. People, event, processes, sources of data for organising the opration’s evaluation system. (Purpose-to-Goal) Risk regarding programme level impact Outputs The actual deliverables. What the operation can be held accountable for producing Outputs indicators that measure the goods and services finally delivered by the operation People, event, processes, sources of data – supervision and monitoring system for validating the operation’s design (Output-to-Purpose) Risk regardingdesign effectiveness Activities The main activity clusters that must be undertakenin order to accomplish the outputs Input/Resources Budget by activity. Monetary, physical & human resources required to produce the outputs People, event, processes, sources of data – supervision and monitoring system for validating implementation progress (Activity-to-Output) Risk regarding implementation & efficiency

Pertanyaan dalam monitoring Mengukur perubahan tingkat tujuan yang memerlukan waktu lama Purpose: apakah tujuan yang direncanakan dapat dicapai? Keluaran: apakah keluaran mengarah pada tujuan? Aktivitas: apakah aktivitas mengarah pada pencapaian output yang diharapkan? Apakah aktivitas telah dilaksanakan sesuai jadwal dan anggaran? Input: apakah keuangan, personel, materi tersedia tepat waktu dengan kuantitas dan kualitas yang memadai?

Apakah yang menyebabkan keterlambatan / penundaan atau menyebabkan hasil yang tidak diharapkan? Apakah ada sesuatu kejadian yang menyebabkan manajemen harus memodifikasi rencana implementasi operasi?

Pertanyaan evaluasi Impact: perubahan apa yang dihasilkan oleh kegiatan? Apakah ada perubahan yang tidak diharapkan atau tidak direncanakan? Efektivitas: apakah tujuan kegiatan tercapai? Apakah keluaran mengarah pada dampak yang diharapkan? Efisiensi: apakah persediaan tersedia dalam waktu dan kuantitas maupun kualitasnya? Apakah aktivitas dilaksanakan sesuai jadwal dalam anggaran? Apakah keluaran diperoleh secara ekonomis?

Keberlanjutan: apakah keuntungan dapat dijaga untuk beberapa periode yang diharapkan setelah pendampingan selesai? Relevansi: apakah tujuan kegiatan konsisten dengan kebutuhan.

Bagaimana merencanakan sistem monitoring dan evaluasi Periksa rancangan kegiatan: melakukan tinjauan dan revisi (jika perlu persiapkan) logical framework. Pastikan tujuan (dampak), keluaran, dan asumsi telah ditentukan dengan jelas dan dapat diukur. Pastikan indikator telah ditentukan sesuai dengan kuantitas, kualitas dan waktu.

Menilai kapasitas monitoring dan evaluasi: identifikasi sumber manusia dan keuangan yang tersedia. Lakukan penilaian kebutuhan pelatihan untuk semua staf monitoring. Tetukan persyaratan atau keperluan pelatihan.

Rencana pengumpulan dan analisis data: memeriksa sumber informasi yang ada untuk kegiatan reliabilitas dan akurasi data, untuk menentukan data apa yang tersedia. Tentukan informasi tambahan apa yang harus dikumpulkan untuk dasar tujuan, untuk monitoring dan evaluasi. Buat jadwal pengumpulan dan pemrosesan data dan menyepakati tanggung jawab.

Mempersiapkan rencana dan anggaran M&E: menyimpulkan kebutuhan informasi yang disepakati, pengumpulan data, kegunaan informasi, melaporkan dan mempresentasikan rencana monitoring dan evaluasi. Simpulkan dukungan dan pengambangan kapasitas yang dibutuhkan. Pembiayaan seluruh aktivitas monitoring dan evaluasi serta mengidentifikasi sumber pendanaannya.

Rencana untuk laporan dan umpan balik: rencanakan sistem pelaporan, spesifikasi format laporan. Merencanakan sistem umpan balik dan pengambilan keputusan untuk manajemen.

Apakah indikator dapat mengukur kemajuan secara efektif? Indikator harus SMART-specific, measurable, accurate, realistic, timely. Indikator harus dapat memeriksa secara objektif, yang berarti orang yang berbeda yang menggunakan indikator yang sama akan memperoleh ukuran yang sama. Indikator outcome menggambarkan populasi target dan tipe keuntungan. Indikator outcome meliputi akses kelompok target, kegunaan, dan kepuasan dalam menerima bantuan.

Makna verifikasi Indikator dapat mengukur biaya yang dibutuhkan dengan prosedur yang digunakan dan dikembangkan dalam proyek. Tanggung jawab secara jelas ditugaskan. Indikator output berasal dari catatan manajemen atau analisis internal.

Pertanyaan monitoring Outcomes: Apakah penerima manfaat, mampu mengakses, menggunakan, dan puas dengan barang dan layanan yang diberikan? Apakah kegiatan masih dalam jalur untuk mencapai tujuannya?

outputs Apakah capaian fisik dari kegiatan? Apakah kelompok target menerima setiap layanan baik dalam kuantitas maupun kualitas sesuai dengan yang direncanakan? Apakah aset dipelihara sesuai rencana? Apakah layanan lain dibuat tersedia sesuai rencana?

aktivitas Apakah barang atau layanan didistribusikan sesuai jadwal dan dalam kuantitas yang direncanakan? Apakah aktivitas lainnya dilakukan sesuai rencana? Siapa saja yang berpartisipasi dalam kegiatan operasional?

input Bagaimana kondisi persediaan saat ini? apa saja yang sudah habis? Apakah pemerintah, dan mitra kerja memberikan keuntungan sesuai rencana? Apakah struktur manajemen tersedia, dan seberapa baik mereka beroperasi?

asumsi Apakah ada faktor eksternal yang signifikan memberikan efek pada kemajuan operasi? Apakah efek tersebut positif atau negatif?

Monitorng and evaluation plan Logframe element indicator Mean of verification Kegunaan informasi Sumber data Frekuensi & biaya Tanggung jawab Motode pelaporan presentasi Goal Assumption Purpose Output Activities inputs