PENINGKATAN PENGENDALIAN PROSES BISNIS UNTUK MENCAPAI WORLD CLASS SERVICES RAKOR TW-IV 2013, LAMPUNG 8-10 JANUARI 2014 E L E C T R I C I T Y F O R A B E T T E R L I F E
PRODUKSI BERDASARKAN TIPE BAHAN BAKAR (FUEL-MIX) PLTD Payoselincah OFF Mulai 1 April 2014 HPP : 1.138,- Rp/KWH HPP : 1.209,- Rp/KWH HPP : 1.112,- Rp/KWH HPP : 1.047,- Rp/KWH
OVERALL EFFECTIVENESS EQUIPMENT 87,4% EFOR
Analisa Pareto Lost Output PLTD/G Sektor Jambi Analisa Pareto Lost Output PLTD/G Sektor Jambi Lost Output Sektor Jambi (Tidak termasuk Sewa) Reasons for Force Derated PLTD&G Periode Semester 1 2013(Januari - Juni) Periode Semester 1 2013(Januari - Juni) 0,11 Total Potensi PLTD&G 441,12 56.2 FO &FD PLTG BH 2 Temp.Oil header High 30,9 (51,1%) Crack 1st Stage nozzle and Temp.Spread TRIP Total 11,96 FO &FD PLTD 15,9 (20 %) High temperarture exhaust Oli Leackeg in Pipe SOGAV Fault Total FO & FD PLTG BH 1 11,40 (19,1 %) * Note: Gap yang berwarna Kuning telah diselesaikan Temperature Spread Trip(3x) Total
Analisa Pareto Lost Output PLTD/G Sektor Jambi Lost Output Sektor Jambi (Tidak termasuk Sewa) Lost Output Sektor Jambi (Tidak termasuk Sewa) Periode Semester 1 2013(Januari - Juni) Periode Semester 2 2013 (Juli- Desember) Total Potensi PLTD&G 441,12 Total Potensi PLTD&G 404,8 56.2 9,1 FO &FD PLTG BH 2 30,9 (51,1%) FD&FO PLTG BH 2 1,4 3,8 FO &FD PLTD 15,9 (20 %) FD & FO PLTD FO & FD PLTG BH 1 11,40 (19,1 %) FD&FO PLTG BH 1 3,9 *Angka dalam satuan GWH
OVERALL EFFECTIVENESS EQUIPMENT 2014 89,61% Strategi : 1. Mengurangi waktu masa pemeliharan periodik 2. Penggantian Filter Online
KINERJA PROSES
PROGRAM PENDUKUNG 2014 PROGRAM (PENDUKUNG) TW-1 2014 PT.PLN (Persero) Sektor Pembangkitan Jambi GUDANG ONLINE ® Sistim Informasi Gudang IMAP – MAXIMO™ Computerize maintenence management system. OLIFE ® DASHBOARD Sistim Informasi Outage Manegement dan lifetime hot section gas turbine. DATABASE (SERVER) E-LOGSHEET ®DASHBOARD EFFICIENCY® DASHBOARD E-LOGSHEET ® FORM Informasi data operasi dan pengusahaan pembangkit Formulir data operasi Sistim Informasi Heat rate dan Efficiency PembangkitPLTG
WORKPLAN Aktivitas sesuai jadwal Rencana 2014 Aktivitas proyek selesai
TRACKING AND CALCULATING LIFE (Hour Base/Start Based) SIMPLE FLOWCHART OLIFE® DASHBOARD EFFICIENCY® DASHBOARD start Input data material Hot Gas Section Input data Operasi (Start factor, Hour Factor) HASIL (lifetime,lifecycle) Material History TRACKING AND CALCULATING LIFE (Hour Base/Start Based) DATA REFERENCE (MANUAL BOOK & EPRI OUTAGE PLANNER ACTIVITY (FORM/VIEW) OVERHAUL EXECUTION AND REPORT FINISH start Get data Dari database Elogsheet (per jam) VISUAL (GRAFIK, TABEL, TRENDING) HITUNG (ASME PTC-22): Efficiency Plant Efficiency Compressor Turbine Efficiency Combustion Heat Rate, NPHR, GPHR. finish REPORT
NILAI KINERJA (SUMMARY)
Kualitas Product & Service PROGRAM KERJA 2014 STRATEGY INISIATIF PROGRAM KERJA UTAMA KEGIATAN SASARAN 1 Kualitas Product & Service Meningkatkan Pasokan Pembangkit - Menambah Pembangkit Baru 330 MW - 410 MW Menurunkan Derating 10 MW menjadi 5 MW 2 Melanjutkan Perang Padam Menurunkan Kali Gangguan 1,4 kali menjadi 1 kali Menurunkan EFOR 2,90% menjadi 1,5% Effesiesi CAPEX & OPEX Menurunkan Biaya Produksi Optimalisasi Gas PS dan SG 1377 rp/kwh menjadi 1030 rp/kwh Menurunkan Fuel Mix dari 2% menjadi 0,3% Effesiensi Pengadaan Material Utama LTSA Spare Part PLTMG Warstila Kontrak 5 Tahun Kontrak KHS Material Rutin, Material Umum, ATK